Stripe-A-Zone, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: STRIPE-A-ZONE, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 3, 2026, retrieved Nov 24, 2026.

Proposals bid
142
Low bids (rank 1)
39
Win rate
27.46%
Low-bid value
$45.9M
Money left on table
$3.4M
Avg. bid vs. estimate
-10.46%

From Nov 6, 2024 to Nov 3, 2026, Stripe-A-Zone, LLC submitted 142 bids on TxDOT proposals and was the apparent low bidder on 39 of them (27.46%), with low bids totalling $45,938,922. In 38 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,420,510 (7.48% of those bids); the median gap was 8.15%. On average its bids came in 10.46% below TxDOT's engineer's estimate. Its most frequent district was Dallas (27 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20247228.6%$1,606,496
2025631625.4%$20,404,984
2026722129.2%$23,927,442

Head-to-head rivals

BidderProposals togetherRanked ahead
Trp Infrastructure Services, LLC13274 of 132
Stripe Lines, Inc.5835 of 58
Centerline Technologies, LLC4521 of 45
Striping Technology, L.P.4226 of 42
Grey Sky Construction LLC3630 of 36
Interstate Barricades & Markings, Inc.3428 of 34
D. I. J. Construction, Inc.3316 of 33
The Confidence Group, Inc3212 of 32

Districts and work types

DistrictBids
Dallas27
Fort Worth16
Austin12
Bryan8
Paris7
Work type of low bidsLow bids
Routine Maintenance Project - Sealed20
Traffic Control Devices7
Rehabilitation of Existing Road3
Routine Maintenance Project3
Seal Coat3
Safety Improvement Projects2

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-07-010371-05-022San PatricioTrp Infrastructure Services, LLC$474,896$475,301+0.1%
2026-01-070923-00-080BrownD. I. J. Construction, Inc.$1,851,159$1,857,381+0.3%
2026-01-060923-00-079EastlandD. I. J. Construction, Inc.$952,952$957,789+0.5%
2024-12-040911-00-085AngelinaCenterline Technologies, LLC$3,846,146$3,877,178+0.8%
2025-02-116478-95-001BrazosRhino Equity, LLC$542,050$546,828+0.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-030901-00-066LamarSeal Coat3 of 4$3,674,361+4.4%-7.4%
2026-11-030914-00-506TravisTraffic Control Devices3 of 4$1,822,495+15.7%-17.9%
2026-10-216506-54-001TarrantRoutine Maintenance Project - Sealed2 of 2$499,496+13.7%-22.1%
2026-10-146502-76-001EllisRoutine Maintenance Project - Sealed1 of 2$453,554—+22.4%
2026-10-070907-00-217Tom GreenTraffic Control Devices6 of 7$3,375,453+32.9%-2.1%
2026-10-066496-56-001BrownRoutine Maintenance Project6 of 7$4,944,811+50.9%+12%
2026-10-066502-41-001AustinRoutine Maintenance Project - Sealed3 of 3$1,654,334+140%+6.1%
2026-09-020050-09-099HarrisTraffic Control Devices1 of 4$4,401,269—-8.7%
2026-09-026500-91-001FayetteRoutine Maintenance Project - Sealed3 of 4$1,405,591+12.8%+18.9%
2026-08-126488-40-001DentonRoutine Maintenance Project - Sealed1 of 2$384,014—+13.9%
2026-08-126501-40-001CollinRoutine Maintenance Project - Sealed1 of 2$33,307—+15.5%
2026-08-060920-39-028ChambersSafety Improvement Projects2 of 3$232,649+3.8%-68.3%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.