Refl PAV MRK TY I (Y)6"(BRK)(100MIL) (Item 666-7420): TxDOT Unit Price History

1,862 bids · 352 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 666-7420 · REFL PAV MRK TY I (Y)6"(BRK)(100MIL) · Unit: LF

Low bid
$0.420/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.450/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.490/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
+4.29%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1.00$2.00$3.00$4.00101001K10K100K1M10MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 1.24 − 0.172·ln qty, R² 0.41)320 plotted bids, 4 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 666-7420 (Refl PAV MRK TY I (Y)6"(BRK)(100MIL)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,862 bids for it on 352 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 977 bids was $0.450 per LF, and the winning low bidders priced it at a weighted median of $0.420 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.490 per LF, so winning bids came in 14.3% below the estimate.

By calendar year, the median bid moved from $0.710 in 2025 (890 bids) to $0.720 in 2026 (903 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $0.560 and $1.00.

Comparing the last 12 months with the 12 months before, the median unit price rose 4.29%.

Quantity matters for this item. Lines of 20 to 1,845 LF had a weighted median of $1.05, while lines above 9,050 LF had $0.500, a 52% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 340 lines where both a winning and a second-place bid were published, the median winning unit price was $0.700 against $0.700 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 24 TxDOT districts with at least ten bids, Lubbock had the lowest weighted median ($0.390) and San Angelo the highest ($0.850). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Hays County, where Bobcat Services, Inc. was the low bidder at $0.770 per LF for 98 LF against an estimate of $0.390.

43 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20246915$0.570$0.520$0.690$0.520$1.75
2025890171$0.560$0.530$0.710$0.590$1.00
2026903167$0.490$0.450$0.720$0.560$1.00

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small20–1,845626$1.51$1.05$0.760–$2.27
Medium1,880–8,995622$0.800$0.700$0.600–$0.940
Large9,050–1,519,840614$0.510$0.500$0.500–$0.670

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.700
Median second-low unit price
$0.700
Median engineer’s estimate
$0.710
Median gap, second vs. low
+0%

340 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District

Line quantity 98 LF · Engineer’s estimate $0.390/LF

  • 1. Bobcat Services, Inc.

    LOW BID · WINNER
    Unit price
    $0.77/LF
    Extension
    $75.46
    Proposal total
    $2,797,454
    Money left on the table
    $386,828 (13.83%)
    vs. engineer’s estimate
    +97.4%
  • Unit price
    $0.73/LF
    Extension
    $71.54
    Proposal total
    $3,184,282
    vs. low bid
    +$386,828
    vs. engineer’s estimate
    +87.2%
  • Unit price
    $0.75/LF
    Extension
    $73.50
    Proposal total
    $3,495,937
    vs. low bid
    +$698,482
    vs. engineer’s estimate
    +92.3%
  • Unit price
    $0.60/LF
    Extension
    $58.80
    Proposal total
    $3,586,449
    vs. low bid
    +$788,995
    vs. engineer’s estimate
    +53.8%
  • Unit price
    $0.73/LF
    Extension
    $71.54
    Proposal total
    $3,801,261
    vs. low bid
    +$1,003,807
    vs. engineer’s estimate
    +87.2%
  • Unit price
    $0.73/LF
    Extension
    $71.54
    Proposal total
    $3,825,058
    vs. low bid
    +$1,027,604
    vs. engineer’s estimate
    +87.2%

Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District

Line quantity 1,305 LF · Engineer’s estimate $0.600/LF

  • 1. Big Creek Construction, Ltd.

    LOW BID · WINNER
    Unit price
    $0.72/LF
    Extension
    $939.60
    Proposal total
    $9,787,627
    Money left on the table
    $395,153 (4.04%)
    vs. engineer’s estimate
    +20%
  • Unit price
    $0.70/LF
    Extension
    $913.50
    Proposal total
    $10,182,780
    vs. low bid
    +$395,153
    vs. engineer’s estimate
    +16.7%
  • Unit price
    $0.71/LF
    Extension
    $926.55
    Proposal total
    $10,424,591
    vs. low bid
    +$636,964
    vs. engineer’s estimate
    +18.3%
  • Unit price
    $0.71/LF
    Extension
    $926.55
    Proposal total
    $12,020,138
    vs. low bid
    +$2,232,511
    vs. engineer’s estimate
    +18.3%
  • Unit price
    $0.75/LF
    Extension
    $978.75
    Proposal total
    $12,374,454
    vs. low bid
    +$2,586,827
    vs. engineer’s estimate
    +25%
  • 6. Patin Construction LLC

    Unit price
    $1.00/LF
    Extension
    $1,305.00
    Proposal total
    $15,629,317
    vs. low bid
    +$5,841,690
    vs. engineer’s estimate
    +66.7%
  • 7. Joe Bland Construction LLC

    Unit price
    $0.75/LF
    Extension
    $978.75
    Proposal total
    $18,492,861
    vs. low bid
    +$8,705,235
    vs. engineer’s estimate
    +25%

Proposal 6504-98-001 · let Nov 4, 2026 · Tom Green County, San Angelo District

Line quantity 10,295 LF · Engineer’s estimate $0.510/LF

  • 1. Reece Albert, Inc.

    LOW BID · WINNER
    Unit price
    $1.76/LF
    Extension
    $18,119.20
    Proposal total
    $3,124,443
    Money left on the table
    $1,117,120 (35.75%)
    vs. engineer’s estimate
    +245.1%
  • Unit price
    $0.78/LF
    Extension
    $8,030.10
    Proposal total
    $4,241,563
    vs. low bid
    +$1,117,120
    vs. engineer’s estimate
    +52.9%
  • Unit price
    $1.08/LF
    Extension
    $11,118.60
    Proposal total
    $5,112,262
    vs. low bid
    +$1,987,819
    vs. engineer’s estimate
    +111.8%
  • Unit price
    $1.00/LF
    Extension
    $10,295.00
    Proposal total
    $6,573,916
    vs. low bid
    +$3,449,473
    vs. engineer’s estimate
    +96.1%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040016-03-125HaysAustin986Bobcat Services, Inc.$0.770$0.390
2026-11-040262-01-034MilamBryan1,3057Big Creek Construction, Ltd.$0.720$0.600
2026-11-040947-03-034JasperBeaumont2,2902Texas Materials Group, Inc.$0.990$0.500
2026-11-046504-98-001Tom GreenSan Angelo10,2954Reece Albert, Inc.$1.76$0.510
2026-11-030015-13-432TravisAustin1266Austin Bridge & Road Services, LP$0.700$0.600
2026-11-030045-09-113LamarParis1,9205Drake Companies LLC$0.700$0.580
2026-11-030220-01-038HidalgoPharr4,5502Foremost Paving, Inc.$0.810$0.510
2026-11-030901-00-066LamarParis67,6654Striping Technology, L.P.$0.500$0.510
2026-11-036508-84-001MidlandOdessa7034Ragle Construction, Inc.$0.800$2.50
2026-10-146502-76-001EllisDallas15,0002Stripe-A-Zone, LLC$0.730$0.600

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene80$0.570$0.570$1.30+102.7%
Amarillo23$0.850$0.750$0.5500%
Austin141$0.400$0.650$0.550+7.14%
Beaumont37$0.550$0.720$0.620+16.28%
Brownwood80$0.390$0.450$0.470-16.67%
Bryan102$0.390$0.440$0.500-5.92%
Childress94$0.420$0.480$0.600+13.79%
Corpus Christi30$0.650$0.650$0.500+228.77%
Dallas257$0.550$0.550$0.600-4.76%
El Paso10$0.500$0.600$0.450—
Fort Worth63$0.420$0.440$0.520-13.33%
Houston65$0.600$0.610$0.720-9.03%
Laredo53$0.570$0.600$0.470+17.46%
Lubbock28$0.340$0.390$0.400-11.76%
Lufkin12$0.700$0.790$0.750—
Odessa95$0.450$0.510$0.470-12.16%
Paris39$0.500$0.530$0.510-45.5%
Pharr165$0.440$0.500$0.490-9.09%
San Angelo41$0.450$0.850$0.600+33.06%
San Antonio181$0.460$0.500$0.5500%
Tyler135$0.410$0.470$0.500+4.44%
Waco20$0.420$0.480$0.560-30.92%
Wichita Falls71$0.590$0.560$0.600-13.85%
Yoakum40$0.740$0.740$0.500+239.13%

Related items

Is your price for item 666-7420 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.