Refl PAV MRK TY I (W)6"(SLD)(100MIL) (Item 666-7411): TxDOT Unit Price History
3,148 bids · 586 bid lines · Sep 6, 2024 to Nov 12, 2026 · unit of measure LF
TxDOT 666-7411 · REFL PAV MRK TY I (W)6"(SLD)(100MIL) · Unit: LF
- Low bid
- $0.400/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $0.450/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $0.500/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- 0%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 666-7411 (Refl PAV MRK TY I (W)6"(SLD)(100MIL)) is measured in LF. Between Sep 6, 2024 and Nov 12, 2026, contractors entered 3,148 bids for it on 586 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,633 bids was $0.450 per LF, and the winning low bidders priced it at a weighted median of $0.400 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $0.500 per LF, so winning bids came in 20.0% below the estimate.
By calendar year, the median bid moved from $0.750 in 2025 (1,508 bids) to $0.750 in 2026 (1,529 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $0.570 and $1.38.
Comparing the last 12 months with the 12 months before, the median unit price did not change.
Quantity matters for this item. Lines of 16 to 5,586 LF had a weighted median of $1.50, while lines above 53,894 LF had $0.490, a 67% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 572 lines where both a winning and a second-place bid were published, the median winning unit price was $0.720 against $0.740 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 24 TxDOT districts with at least ten bids, Lubbock had the lowest weighted median ($0.390) and Amarillo the highest ($1.80). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $11.75 per LF for 652 LF against an estimate of $1.00.
16 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7408 Refl PAV MRK TY I (W)6"(BRK)(100MIL) (weighted median $0.520 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 111 | 25 | $0.560 | $0.510 | $0.750 | $0.600 | $1.63 |
| 2025 | 1,508 | 293 | $0.540 | $0.500 | $0.750 | $0.600 | $1.25 |
| 2026 | 1,529 | 270 | $0.480 | $0.450 | $0.750 | $0.570 | $1.38 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 16–5,586 | 1,051 | $1.94 | $1.50 | $1.05–$3.00 |
| Medium | 5,600–53,152 | 1,048 | $0.750 | $0.670 | $0.600–$0.940 |
| Large | 53,894–10,915,660 | 1,049 | $0.490 | $0.490 | $0.500–$0.670 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $0.720
- Median second-low unit price
- $0.740
- Median engineer’s estimate
- $0.750
- Median gap, second vs. low
- +0%
572 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District
Line quantity 652 LF · Engineer’s estimate $1.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLCLOW BID | $11.75/LF | $7,661.00 | — | +1,075% | $734,629 | $59,414 (8.09%) left on table |
| 2 | Cross Plus Construction, LLC | $10.00/LF | $6,520.00 | -$1,141 | +900% | $794,043 | +$59,414 |
| 3 | Structural Integrity Group LLC | $10.00/LF | $6,520.00 | -$1,141 | +900% | $852,064 | +$117,434 |
| 4 | Pathfield Investments LLC | $4.00/LF | $2,608.00 | -$5,053 | +300% | $863,606 | +$128,977 |
| 5 | Scr Civil Construction, LLC | $11.00/LF | $7,172.00 | -$489.00 | +1,000% | $916,535 | +$181,906 |
| 6 | Icos Management, LLC | $12.60/LF | $8,215.20 | +$554.20 | +1,160% | $974,652 | +$240,023 |
| 7 | Road Doctors LLC | $10.00/LF | $6,520.00 | -$1,141 | +900% | $981,238 | +$246,609 |
- LOW BID · WINNER
- Unit price
- $11.75/LF
- Extension
- $7,661.00
- Proposal total
- $734,629
- Money left on the table
- $59,414 (8.09%)
- vs. engineer’s estimate
- +1,075%
- Unit price
- $10.00/LF
- Extension
- $6,520.00
- Proposal total
- $794,043
- vs. low bid
- +$59,414
- vs. engineer’s estimate
- +900%
- Unit price
- $10.00/LF
- Extension
- $6,520.00
- Proposal total
- $852,064
- vs. low bid
- +$117,434
- vs. engineer’s estimate
- +900%
- Unit price
- $4.00/LF
- Extension
- $2,608.00
- Proposal total
- $863,606
- vs. low bid
- +$128,977
- vs. engineer’s estimate
- +300%
- Unit price
- $11.00/LF
- Extension
- $7,172.00
- Proposal total
- $916,535
- vs. low bid
- +$181,906
- vs. engineer’s estimate
- +1,000%
- Unit price
- $12.60/LF
- Extension
- $8,215.20
- Proposal total
- $974,652
- vs. low bid
- +$240,023
- vs. engineer’s estimate
- +1,160%
- Unit price
- $10.00/LF
- Extension
- $6,520.00
- Proposal total
- $981,238
- vs. low bid
- +$246,609
- vs. engineer’s estimate
- +900%
Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District
Line quantity 13,178 LF · Engineer’s estimate $0.580/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Bobcat Services, Inc.LOW BID | $0.74/LF | $9,751.72 | — | +27.6% | $2,797,454 | $386,828 (13.83%) left on table |
| 2 | Hunter Industries, Ltd. | $0.67/LF | $8,829.26 | -$922.46 | +15.5% | $3,184,282 | +$386,828 |
| 3 | Dean Word Company, Ltd. | $0.75/LF | $9,883.50 | +$131.78 | +29.3% | $3,495,937 | +$698,482 |
| 4 | Texas Materials Group, Inc. | $0.55/LF | $7,247.90 | -$2,504 | -5.2% | $3,586,449 | +$788,995 |
| 5 | Lone Star Paving Company | $0.67/LF | $8,829.26 | -$922.46 | +15.5% | $3,801,261 | +$1,003,807 |
| 6 | Clark Construction of Texas, Inc. | $0.67/LF | $8,829.26 | -$922.46 | +15.5% | $3,825,058 | +$1,027,604 |
1. Bobcat Services, Inc.
LOW BID · WINNER- Unit price
- $0.74/LF
- Extension
- $9,751.72
- Proposal total
- $2,797,454
- Money left on the table
- $386,828 (13.83%)
- vs. engineer’s estimate
- +27.6%
- Unit price
- $0.67/LF
- Extension
- $8,829.26
- Proposal total
- $3,184,282
- vs. low bid
- +$386,828
- vs. engineer’s estimate
- +15.5%
- Unit price
- $0.75/LF
- Extension
- $9,883.50
- Proposal total
- $3,495,937
- vs. low bid
- +$698,482
- vs. engineer’s estimate
- +29.3%
- Unit price
- $0.55/LF
- Extension
- $7,247.90
- Proposal total
- $3,586,449
- vs. low bid
- +$788,995
- vs. engineer’s estimate
- -5.2%
- Unit price
- $0.67/LF
- Extension
- $8,829.26
- Proposal total
- $3,801,261
- vs. low bid
- +$1,003,807
- vs. engineer’s estimate
- +15.5%
- Unit price
- $0.67/LF
- Extension
- $8,829.26
- Proposal total
- $3,825,058
- vs. low bid
- +$1,027,604
- vs. engineer’s estimate
- +15.5%
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 38,812 LF · Engineer’s estimate $0.600/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $0.53/LF | $20,570.36 | — | -11.7% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $0.74/LF | $28,720.88 | +$8,151 | +23.3% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $0.75/LF | $29,109.00 | +$8,539 | +25% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $0.57/LF | $22,122.84 | +$1,552 | -5% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $0.53/LF
- Extension
- $20,570.36
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -11.7%
- Unit price
- $0.74/LF
- Extension
- $28,720.88
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +23.3%
3. Tiseo Paving Company, LLC
- Unit price
- $0.75/LF
- Extension
- $29,109.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +25%
4. Harper Brothers Construction LLC
- Unit price
- $0.57/LF
- Extension
- $22,122.84
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -5%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 652 | 7 | Ti-Zack Concrete, LLC | $11.75 | $1.00 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 13,178 | 6 | Bobcat Services, Inc. | $0.740 | $0.580 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 38,812 | 4 | Mario Sinacola & Sons Excavating, Inc. | $0.530 | $0.600 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 60,940 | 9 | Lone Star Paving Company | $0.550 | $0.600 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 67,555 | 6 | Indus Road & Bridge, Inc. | $0.650 | $1.20 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 57,685 | 7 | Big Creek Construction, Ltd. | $0.700 | $0.600 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 21,200 | 2 | Texas Materials Group, Inc. | $0.940 | $0.500 |
| 2026-11-04 | 6504-98-001 | Tom Green | San Angelo | 11,400 | 4 | Reece Albert, Inc. | $1.73 | $0.510 |
| 2026-11-03 | 0038-01-107 | Webb | Laredo | 805 | 4 | Hjc Farms, Inc. | $5.04 | $0.500 |
| 2026-11-03 | 0044-06-079 | Montague | Wichita Falls | 78,150 | 6 | Breedon Investments USA Inc. | $0.490 | $0.600 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 125 | $0.570 | $0.570 | $0.800 | -2% |
| Amarillo | 43 | $1.75 | $1.80 | $1.20 | -21.82% |
| Atlanta | 7 | $0.700 | $0.750 | $0.550 | — |
| Austin | 141 | $0.520 | $0.640 | $0.600 | +26.43% |
| Beaumont | 40 | $0.550 | $0.680 | $0.600 | -5.22% |
| Brownwood | 79 | $0.380 | $0.430 | $0.430 | -11.29% |
| Bryan | 132 | $0.390 | $0.420 | $0.470 | -9.33% |
| Childress | 120 | $0.370 | $0.480 | $0.600 | -3.73% |
| Corpus Christi | 36 | $0.550 | $0.550 | $0.480 | +257.14% |
| Dallas | 712 | $0.540 | $0.550 | $0.600 | -11.56% |
| El Paso | 24 | $0.700 | $0.590 | $0.750 | -51.26% |
| Fort Worth | 226 | $0.420 | $0.420 | $0.520 | +20% |
| Houston | 116 | $0.570 | $0.600 | $0.650 | +6.25% |
| Laredo | 105 | $0.520 | $0.510 | $0.500 | +7.03% |
| Lubbock | 41 | $0.330 | $0.390 | $0.420 | -55% |
| Lufkin | 12 | $0.700 | $0.790 | $0.750 | — |
| Odessa | 185 | $0.660 | $0.550 | $0.470 | -4.29% |
| Paris | 42 | $0.400 | $0.530 | $0.470 | -46% |
| Pharr | 200 | $0.400 | $0.500 | $0.500 | -2.33% |
| San Angelo | 79 | $0.450 | $0.750 | $0.900 | -16.67% |
| San Antonio | 231 | $0.520 | $0.530 | $0.600 | -20% |
| Tyler | 217 | $0.440 | $0.540 | $0.500 | +16.13% |
| Waco | 31 | $0.380 | $0.440 | $0.530 | -26.67% |
| Wichita Falls | 105 | $0.530 | $0.510 | $0.600 | -10.83% |
| Yoakum | 99 | $0.680 | $0.700 | $0.500 | +28% |
Related items
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
- 666-7423 · Refl PAV MRK TY I (Y)6"(SLD)(100MIL) ($0.450/LF)
- 666-7036 · Refl PAV MRK TY I (W)24"(SLD)(100MIL) ($7.00/LF)
- 666-7408 · Refl PAV MRK TY I (W)6"(BRK)(100MIL) ($0.520/LF)
- 666-7347 · Pavement Sler 6" ($0.190/LF)
- 666-7420 · Refl PAV MRK TY I (Y)6"(BRK)(100MIL) ($0.450/LF)
- 666-7042 · Refl PAV MRK TY I (W)(Arrow)(100MIL) ($150.00/EA)
- 666-7066 · Refl PAV MRK TY I (W)(Word)(100MIL) ($175.00/EA)
Is your price for item 666-7411 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.