Refl PAV Mrkr TY I-C (Item 672-7002): TxDOT Unit Price History
3,511 bids · 722 bid lines · Nov 6, 2024 to Nov 18, 2026 · unit of measure EA
TxDOT 672-7002 · REFL PAV MRKR TY I-C · Unit: EA
- Low bid
- $3.95/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $4.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $4.30/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -12.5%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 18, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 672-7002 (Refl PAV Mrkr TY I-C) is measured in EA. Between Nov 6, 2024 and Nov 18, 2026, contractors entered 3,511 bids for it on 722 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,797 bids was $4.00 per EA, and the winning low bidders priced it at a weighted median of $3.95 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $4.30 per EA, so winning bids came in 8.1% below the estimate.
By calendar year, the median bid moved from $6.00 in 2025 (1,669 bids) to $5.25 in 2026 (1,687 bids), down 12.5%. The middle half of 2026 bids fell between $4.23 and $7.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 12.5%.
Quantity matters for this item. Lines of 1 to 90 EA had a weighted median of $6.45, while lines above 437 EA had $4.00, a 38% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 697 lines where both a winning and a second-place bid were published, the median winning unit price was $5.50 against $5.50 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Atlanta had the lowest weighted median ($3.60) and Houston the highest ($5.50). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 18, 2026 in Brazos County, where Anthony Services was the low bidder at $4.90 per EA for 7,000 EA against an estimate of $6.00.
54 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 672-7004 Refl PAV Mrkr TY II-A-A (weighted median $4.00 per EA); 672-7006 Refl PAV Mrkr TY II-C-R (weighted median $4.00 per EA); 668-7091 Prefab PM TY C (W)(Arrow) (weighted median $200.00 per EA); 668-7103 Prefab PM TY C (W)(Word) (weighted median $250.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 155 | 40 | $4.69 | $4.00 | $5.80 | $4.45 | $7.50 |
| 2025 | 1,669 | 356 | $4.71 | $4.40 | $6.00 | $4.90 | $7.50 |
| 2026 | 1,687 | 326 | $4.32 | $4.00 | $5.25 | $4.23 | $7.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–90 | 1,172 | $7.49 | $6.45 | $5.40–$9.50 |
| Medium | 91–434 | 1,170 | $6.13 | $5.95 | $5.00–$7.25 |
| Large | 437–28,199 | 1,169 | $4.37 | $4.00 | $4.00–$5.50 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $5.50
- Median second-low unit price
- $5.50
- Median engineer’s estimate
- $5.04
- Median gap, second vs. low
- +0%
697 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0007-05-016 · let Nov 4, 2026 · Eastland County, Brownwood District
Line quantity 2,052 EA · Engineer’s estimate $3.75/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Northeastern Pavers, LLCLOW BID | $4.00/EA | $8,208.00 | — | +6.7% | $9,329,948 | $150,839 (1.62%) left on table |
| 2 | Ronald R. Wagner & Co., LP | $4.00/EA | $8,208.00 | $0.000 | +6.7% | $9,480,787 | +$150,839 |
| 3 | Clark Construction of Texas, Inc. | $4.00/EA | $8,208.00 | $0.000 | +6.7% | $10,598,437 | +$1,268,489 |
| 4 | Ck Newberry, LLC | $4.00/EA | $8,208.00 | $0.000 | +6.7% | $11,265,688 | +$1,935,740 |
- LOW BID · WINNER
- Unit price
- $4.00/EA
- Extension
- $8,208.00
- Proposal total
- $9,329,948
- Money left on the table
- $150,839 (1.62%)
- vs. engineer’s estimate
- +6.7%
- Unit price
- $4.00/EA
- Extension
- $8,208.00
- Proposal total
- $9,480,787
- vs. low bid
- +$150,839
- vs. engineer’s estimate
- +6.7%
- Unit price
- $4.00/EA
- Extension
- $8,208.00
- Proposal total
- $10,598,437
- vs. low bid
- +$1,268,489
- vs. engineer’s estimate
- +6.7%
- Unit price
- $4.00/EA
- Extension
- $8,208.00
- Proposal total
- $11,265,688
- vs. low bid
- +$1,935,740
- vs. engineer’s estimate
- +6.7%
Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District
Line quantity 274 EA · Engineer’s estimate $4.11/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Bobcat Services, Inc.LOW BID | $4.73/EA | $1,296.02 | — | +15.1% | $2,797,454 | $386,828 (13.83%) left on table |
| 2 | Hunter Industries, Ltd. | $4.50/EA | $1,233.00 | -$63.02 | +9.5% | $3,184,282 | +$386,828 |
| 3 | Dean Word Company, Ltd. | $4.75/EA | $1,301.50 | +$5.48 | +15.6% | $3,495,937 | +$698,482 |
| 4 | Texas Materials Group, Inc. | $4.25/EA | $1,164.50 | -$131.52 | +3.4% | $3,586,449 | +$788,995 |
| 5 | Lone Star Paving Company | $4.50/EA | $1,233.00 | -$63.02 | +9.5% | $3,801,261 | +$1,003,807 |
| 6 | Clark Construction of Texas, Inc. | $4.50/EA | $1,233.00 | -$63.02 | +9.5% | $3,825,058 | +$1,027,604 |
1. Bobcat Services, Inc.
LOW BID · WINNER- Unit price
- $4.73/EA
- Extension
- $1,296.02
- Proposal total
- $2,797,454
- Money left on the table
- $386,828 (13.83%)
- vs. engineer’s estimate
- +15.1%
- Unit price
- $4.50/EA
- Extension
- $1,233.00
- Proposal total
- $3,184,282
- vs. low bid
- +$386,828
- vs. engineer’s estimate
- +9.5%
- Unit price
- $4.75/EA
- Extension
- $1,301.50
- Proposal total
- $3,495,937
- vs. low bid
- +$698,482
- vs. engineer’s estimate
- +15.6%
- Unit price
- $4.25/EA
- Extension
- $1,164.50
- Proposal total
- $3,586,449
- vs. low bid
- +$788,995
- vs. engineer’s estimate
- +3.4%
- Unit price
- $4.50/EA
- Extension
- $1,233.00
- Proposal total
- $3,801,261
- vs. low bid
- +$1,003,807
- vs. engineer’s estimate
- +9.5%
- Unit price
- $4.50/EA
- Extension
- $1,233.00
- Proposal total
- $3,825,058
- vs. low bid
- +$1,027,604
- vs. engineer’s estimate
- +9.5%
Proposal 0027-03-077 · let Nov 4, 2026 · Colorado County, Yoakum District
Line quantity 6,023 EA · Engineer’s estimate $4.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ronald R. Wagner & Co., LPLOW BID | $4.00/EA | $24,092.00 | — | 0% | $17,597,090 | $20,400 (0.12%) left on table |
| 2 | Clark Construction of Texas, Inc. | $4.00/EA | $24,092.00 | $0.000 | 0% | $17,617,490 | +$20,400 |
| 3 | Ck Newberry, LLC | $4.00/EA | $24,092.00 | $0.000 | 0% | $19,218,375 | +$1,621,285 |
| 4 | Hayden Paving, Inc. | $4.20/EA | $25,296.60 | +$1,205 | +5% | $19,937,821 | +$2,340,731 |
- LOW BID · WINNER
- Unit price
- $4.00/EA
- Extension
- $24,092.00
- Proposal total
- $17,597,090
- Money left on the table
- $20,400 (0.12%)
- vs. engineer’s estimate
- 0%
- Unit price
- $4.00/EA
- Extension
- $24,092.00
- Proposal total
- $17,617,490
- vs. low bid
- +$20,400
- vs. engineer’s estimate
- 0%
- Unit price
- $4.00/EA
- Extension
- $24,092.00
- Proposal total
- $19,218,375
- vs. low bid
- +$1,621,285
- vs. engineer’s estimate
- 0%
4. Hayden Paving, Inc.
- Unit price
- $4.20/EA
- Extension
- $25,296.60
- Proposal total
- $19,937,821
- vs. low bid
- +$2,340,731
- vs. engineer’s estimate
- +5%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-18 | 6510-96-001 | Brazos | Bryan | 7,000 | 2 | Anthony Services | $4.90 | $6.00 |
| 2026-11-04 | 0007-05-016 | Eastland | Brownwood | 2,052 | 4 | Northeastern Pavers, LLC | $4.00 | $3.75 |
| 2026-11-04 | 0009-06-056 | Hunt | Paris | 1,914 | 2 | Cdm Holdings | $4.00 | $4.50 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 274 | 6 | Bobcat Services, Inc. | $4.73 | $4.11 |
| 2026-11-04 | 0027-03-077 | Colorado | Yoakum | 6,023 | 4 | Ronald R. Wagner & Co., LP | $4.00 | $4.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 606 | 4 | Mario Sinacola & Sons Excavating, Inc. | $3.80 | $5.20 |
| 2026-11-04 | 0052-04-054 | Lamb | Lubbock | 1,853 | 4 | Lipham Asphalt and Paving Company, LLC | $4.20 | $4.15 |
| 2026-11-04 | 0066-03-045 | Sherman | Amarillo | 1,370 | 2 | Breedon Investments USA Inc. | $4.00 | $4.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 43 | 6 | Indus Road & Bridge, Inc. | $4.20 | $8.25 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 347 | 12 | Fluor Enterprises, Inc. | $5.00 | $5.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 71 | $6.00 | $5.45 | $6.00 | -7.08% |
| Amarillo | 31 | $3.80 | $3.80 | $2.84 | -16.67% |
| Atlanta | 69 | $3.00 | $3.60 | $4.63 | -31.25% |
| Austin | 387 | $3.20 | $4.00 | $4.05 | -16.67% |
| Beaumont | 104 | $5.00 | $4.50 | $5.00 | -12.35% |
| Brownwood | 88 | $3.70 | $4.00 | $4.42 | -16.5% |
| Bryan | 133 | $4.90 | $4.90 | $5.50 | -27.33% |
| Childress | 60 | $4.12 | $4.00 | $4.00 | -0.74% |
| Corpus Christi | 153 | $3.75 | $4.00 | $3.65 | -6.25% |
| Dallas | 420 | $4.00 | $4.07 | $4.50 | -21.67% |
| El Paso | 27 | $5.00 | $5.00 | $3.00 | -37.5% |
| Fort Worth | 180 | $4.00 | $4.00 | $3.54 | -10.85% |
| Houston | 284 | $5.50 | $5.50 | $4.15 | -9.09% |
| Laredo | 80 | $4.00 | $4.00 | $4.00 | +27.12% |
| Lubbock | 65 | $3.70 | $3.70 | $3.80 | +11.17% |
| Lufkin | 74 | $4.38 | $4.40 | $4.25 | -23.66% |
| Odessa | 155 | $4.00 | $4.00 | $4.50 | -16.11% |
| Paris | 100 | $4.00 | $5.40 | $4.50 | 0% |
| Pharr | 196 | $3.75 | $3.75 | $4.50 | -10.67% |
| San Angelo | 72 | $3.63 | $4.24 | $5.00 | -17.06% |
| San Antonio | 317 | $3.50 | $4.00 | $3.00 | -10% |
| Tyler | 183 | $4.00 | $4.00 | $5.00 | 0% |
| Waco | 132 | $3.95 | $4.20 | $4.30 | +20% |
| Wichita Falls | 38 | $4.00 | $4.08 | $5.00 | -4.55% |
| Yoakum | 92 | $4.00 | $4.00 | $4.00 | +23.33% |
Related items
- 672-7004 · Refl PAV Mrkr TY II-A-A ($4.00/EA)
- 672-7006 · Refl PAV Mrkr TY II-C-R ($4.00/EA)
- 668-7091 · Prefab PM TY C (W)(Arrow) ($200.00/EA)
- 668-7103 · Prefab PM TY C (W)(Word) ($250.00/EA)
- 668-7089 · Prefab PM TY C (W)(24")(SLD) ($13.00/LF)
- 677-7001 · Elim EXT PM & Mrks (4") ($0.150/LF)
- 677-7008 · Elim EXT PM & Mrks (24") ($2.80/LF)
- 677-7002 · Elim EXT PM & Mrks (6") ($0.290/LF)
Is your price for item 672-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.