Refl PAV Mrkr TY II-C-R (Item 672-7006): TxDOT Unit Price History
2,885 bids · 611 bid lines · Nov 6, 2024 to Nov 18, 2026 · unit of measure EA
TxDOT 672-7006 · REFL PAV MRKR TY II-C-R · Unit: EA
- Low bid
- $4.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $4.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $4.25/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -14.17%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 18, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 672-7006 (Refl PAV Mrkr TY II-C-R) is measured in EA. Between Nov 6, 2024 and Nov 18, 2026, contractors entered 2,885 bids for it on 611 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,585 bids was $4.00 per EA, and the winning low bidders priced it at a weighted median of $4.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $4.25 per EA, so winning bids came in 5.9% below the estimate.
By calendar year, the median bid moved from $6.00 in 2025 (1,244 bids) to $5.20 in 2026 (1,480 bids), down 13.3%. The middle half of 2026 bids fell between $4.25 and $7.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 14.17%.
Quantity matters for this item. Lines of 2 to 217 EA had a weighted median of $6.87, while lines above 1,301 EA had $4.15, a 40% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 586 lines where both a winning and a second-place bid were published, the median winning unit price was $5.20 against $5.22 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, San Antonio had the lowest weighted median ($3.60) and Atlanta the highest ($5.75). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 18, 2026 in Brazos County, where Anthony Services was the low bidder at $4.78 per EA for 25,000 EA against an estimate of $6.00.
74 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 672-7004 Refl PAV Mrkr TY II-A-A (weighted median $4.00 per EA); 672-7002 Refl PAV Mrkr TY I-C (weighted median $4.00 per EA); 668-7091 Prefab PM TY C (W)(Arrow) (weighted median $200.00 per EA); 668-7103 Prefab PM TY C (W)(Word) (weighted median $250.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 161 | 36 | $5.25 | $5.00 | $5.50 | $4.90 | $7.00 |
| 2025 | 1,244 | 276 | $4.78 | $4.50 | $6.00 | $4.93 | $7.43 |
| 2026 | 1,480 | 299 | $4.32 | $4.00 | $5.20 | $4.25 | $7.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 2–217 | 962 | $7.86 | $6.87 | $5.50–$10.00 |
| Medium | 220–1,276 | 963 | $5.85 | $5.33 | $4.50–$7.00 |
| Large | 1,301–158,562 | 960 | $4.45 | $4.15 | $4.00–$5.50 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $5.20
- Median second-low unit price
- $5.22
- Median engineer’s estimate
- $5.00
- Median gap, second vs. low
- +0%
586 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District
Line quantity 2,031 EA · Engineer’s estimate $4.14/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Bobcat Services, Inc.LOW BID | $4.73/EA | $9,606.63 | — | +14.3% | $2,797,454 | $386,828 (13.83%) left on table |
| 2 | Hunter Industries, Ltd. | $4.50/EA | $9,139.50 | -$467.13 | +8.7% | $3,184,282 | +$386,828 |
| 3 | Dean Word Company, Ltd. | $4.75/EA | $9,647.25 | +$40.62 | +14.7% | $3,495,937 | +$698,482 |
| 4 | Texas Materials Group, Inc. | $4.25/EA | $8,631.75 | -$974.88 | +2.7% | $3,586,449 | +$788,995 |
| 5 | Lone Star Paving Company | $4.50/EA | $9,139.50 | -$467.13 | +8.7% | $3,801,261 | +$1,003,807 |
| 6 | Clark Construction of Texas, Inc. | $4.50/EA | $9,139.50 | -$467.13 | +8.7% | $3,825,058 | +$1,027,604 |
1. Bobcat Services, Inc.
LOW BID · WINNER- Unit price
- $4.73/EA
- Extension
- $9,606.63
- Proposal total
- $2,797,454
- Money left on the table
- $386,828 (13.83%)
- vs. engineer’s estimate
- +14.3%
- Unit price
- $4.50/EA
- Extension
- $9,139.50
- Proposal total
- $3,184,282
- vs. low bid
- +$386,828
- vs. engineer’s estimate
- +8.7%
- Unit price
- $4.75/EA
- Extension
- $9,647.25
- Proposal total
- $3,495,937
- vs. low bid
- +$698,482
- vs. engineer’s estimate
- +14.7%
- Unit price
- $4.25/EA
- Extension
- $8,631.75
- Proposal total
- $3,586,449
- vs. low bid
- +$788,995
- vs. engineer’s estimate
- +2.7%
- Unit price
- $4.50/EA
- Extension
- $9,139.50
- Proposal total
- $3,801,261
- vs. low bid
- +$1,003,807
- vs. engineer’s estimate
- +8.7%
- Unit price
- $4.50/EA
- Extension
- $9,139.50
- Proposal total
- $3,825,058
- vs. low bid
- +$1,027,604
- vs. engineer’s estimate
- +8.7%
Proposal 0027-03-077 · let Nov 4, 2026 · Colorado County, Yoakum District
Line quantity 2,540 EA · Engineer’s estimate $4.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ronald R. Wagner & Co., LPLOW BID | $4.00/EA | $10,160.00 | — | 0% | $17,597,090 | $20,400 (0.12%) left on table |
| 2 | Clark Construction of Texas, Inc. | $4.00/EA | $10,160.00 | $0.000 | 0% | $17,617,490 | +$20,400 |
| 3 | Ck Newberry, LLC | $4.00/EA | $10,160.00 | $0.000 | 0% | $19,218,375 | +$1,621,285 |
| 4 | Hayden Paving, Inc. | $4.20/EA | $10,668.00 | +$508.00 | +5% | $19,937,821 | +$2,340,731 |
- LOW BID · WINNER
- Unit price
- $4.00/EA
- Extension
- $10,160.00
- Proposal total
- $17,597,090
- Money left on the table
- $20,400 (0.12%)
- vs. engineer’s estimate
- 0%
- Unit price
- $4.00/EA
- Extension
- $10,160.00
- Proposal total
- $17,617,490
- vs. low bid
- +$20,400
- vs. engineer’s estimate
- 0%
- Unit price
- $4.00/EA
- Extension
- $10,160.00
- Proposal total
- $19,218,375
- vs. low bid
- +$1,621,285
- vs. engineer’s estimate
- 0%
4. Hayden Paving, Inc.
- Unit price
- $4.20/EA
- Extension
- $10,668.00
- Proposal total
- $19,937,821
- vs. low bid
- +$2,340,731
- vs. engineer’s estimate
- +5%
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 444 EA · Engineer’s estimate $4.60/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $3.80/EA | $1,687.20 | — | -17.4% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $5.78/EA | $2,566.32 | +$879.12 | +25.7% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $5.80/EA | $2,575.20 | +$888.00 | +26.1% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $4.00/EA | $1,776.00 | +$88.80 | -13% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $3.80/EA
- Extension
- $1,687.20
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -17.4%
- Unit price
- $5.78/EA
- Extension
- $2,566.32
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +25.7%
3. Tiseo Paving Company, LLC
- Unit price
- $5.80/EA
- Extension
- $2,575.20
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +26.1%
4. Harper Brothers Construction LLC
- Unit price
- $4.00/EA
- Extension
- $1,776.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -13%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-18 | 6510-96-001 | Brazos | Bryan | 25,000 | 2 | Anthony Services | $4.78 | $6.00 |
| 2026-11-04 | 0009-06-056 | Hunt | Paris | 2,625 | 2 | Cdm Holdings | $4.00 | $4.00 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 2,031 | 6 | Bobcat Services, Inc. | $4.73 | $4.14 |
| 2026-11-04 | 0027-03-077 | Colorado | Yoakum | 2,540 | 4 | Ronald R. Wagner & Co., LP | $4.00 | $4.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 444 | 4 | Mario Sinacola & Sons Excavating, Inc. | $3.80 | $4.60 |
| 2026-11-04 | 0052-04-054 | Lamb | Lubbock | 9,053 | 4 | Lipham Asphalt and Paving Company, LLC | $4.20 | $3.85 |
| 2026-11-04 | 0066-03-045 | Sherman | Amarillo | 4,564 | 2 | Breedon Investments USA Inc. | $4.00 | $4.00 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 1,136 | 9 | Lone Star Paving Company | $4.50 | $5.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 1,726 | 6 | Indus Road & Bridge, Inc. | $4.20 | $0.800 |
| 2026-11-04 | 6504-98-001 | Tom Green | San Angelo | 760 | 4 | Reece Albert, Inc. | $5.33 | $4.05 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 74 | $4.00 | $4.50 | $5.00 | -18.75% |
| Amarillo | 53 | $3.80 | $3.80 | $3.11 | -34.84% |
| Atlanta | 32 | $4.00 | $5.75 | $6.50 | -13.24% |
| Austin | 212 | $3.99 | $4.50 | $4.75 | -18.03% |
| Beaumont | 120 | $3.95 | $4.25 | $4.50 | -7.69% |
| Brownwood | 59 | $5.00 | $5.00 | $5.00 | -23.25% |
| Bryan | 83 | $4.78 | $5.00 | $6.00 | -11.11% |
| Childress | 30 | $4.12 | $4.00 | $4.00 | +14.94% |
| Corpus Christi | 86 | $3.50 | $3.90 | $4.85 | 0% |
| Dallas | 514 | $4.00 | $4.00 | $5.00 | -16.67% |
| El Paso | 57 | $4.00 | $4.50 | $3.00 | -28.4% |
| Fort Worth | 202 | $4.00 | $4.00 | $4.34 | -20.83% |
| Houston | 324 | $4.25 | $5.25 | $4.33 | 0% |
| Laredo | 61 | $3.50 | $5.00 | $5.57 | +25% |
| Lubbock | 59 | $3.70 | $3.70 | $3.80 | -0.56% |
| Lufkin | 15 | $4.38 | $4.50 | $4.25 | — |
| Odessa | 117 | $5.00 | $4.90 | $4.25 | -14.24% |
| Paris | 85 | $3.90 | $4.00 | $4.53 | +33% |
| Pharr | 119 | $4.00 | $5.00 | $3.80 | -27.86% |
| San Angelo | 56 | $3.63 | $4.24 | $5.00 | +17.56% |
| San Antonio | 229 | $3.00 | $3.60 | $4.00 | -10% |
| Tyler | 82 | $4.10 | $4.25 | $5.00 | -15% |
| Waco | 83 | $4.20 | $3.95 | $3.10 | +4.41% |
| Wichita Falls | 68 | $4.00 | $4.00 | $3.25 | -11.58% |
| Yoakum | 65 | $4.10 | $5.00 | $4.00 | +69% |
Related items
- 672-7004 · Refl PAV Mrkr TY II-A-A ($4.00/EA)
- 672-7002 · Refl PAV Mrkr TY I-C ($4.00/EA)
- 668-7091 · Prefab PM TY C (W)(Arrow) ($200.00/EA)
- 668-7103 · Prefab PM TY C (W)(Word) ($250.00/EA)
- 668-7089 · Prefab PM TY C (W)(24")(SLD) ($13.00/LF)
- 677-7001 · Elim EXT PM & Mrks (4") ($0.150/LF)
- 677-7008 · Elim EXT PM & Mrks (24") ($2.80/LF)
- 677-7002 · Elim EXT PM & Mrks (6") ($0.290/LF)
Is your price for item 672-7006 in line? Benchmark your whole bid tab against TxDOT bid history.