Elim EXT PM & Mrks (24") (Item 677-7008): TxDOT Unit Price History

2,128 bids · 433 bid lines · Sep 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 677-7008 · ELIM EXT PM & MRKS (24") · Unit: LF

Low bid
$2.10/LF
Quantity-weighted median of winning unit prices
Weighted median
$2.80/LF
Quantity-weighted median of every bid
Engineer’s estimate
$2.37/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-20%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$5.00$10.00$15.00$20.001101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 2.37 − 0.151·ln qty, R² 0.14)320 plotted bids, 3 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 677-7008 (Elim EXT PM & Mrks (24")) is measured in LF. Between Sep 6, 2024 and Nov 4, 2026, contractors entered 2,128 bids for it on 433 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,180 bids was $2.80 per LF, and the winning low bidders priced it at a weighted median of $2.10 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $2.37 per LF, so winning bids came in 11.4% below the estimate.

By calendar year, the median bid moved from $5.00 in 2025 (916 bids) to $4.00 in 2026 (1,118 bids), down 20.0%. The middle half of 2026 bids fell between $2.90 and $5.70.

Comparing the last 12 months with the 12 months before, the median unit price fell 20%.

Quantity matters for this item. Lines of 5 to 174 LF had a weighted median of $5.00, while lines above 802 LF had $2.80, a 44% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 415 lines where both a winning and a second-place bid were published, the median winning unit price was $4.00 against $4.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Lufkin had the lowest weighted median ($1.50) and Atlanta the highest ($6.25). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Eastland County, where Northeastern Pavers, LLC was the low bidder at $2.00 per LF for 4,699 LF against an estimate of $2.00.

27 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 677-7001 Elim EXT PM & Mrks (4") (weighted median $0.150 per LF); 677-7002 Elim EXT PM & Mrks (6") (weighted median $0.290 per LF); 677-7004 Elim EXT PM & Mrks (8") (weighted median $0.550 per LF); 677-7009 Elim EXT PM & Mrks (Arrow) (weighted median $50.00 per EA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20249423$4.04$3.00$5.48$3.89$10.00
2025916197$4.14$3.00$5.00$3.00$7.00
20261,118214$3.20$2.80$4.00$2.90$5.70

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small5–174711$6.85$5.00$3.31–$8.40
Medium177–781708$5.45$4.50$3.30–$6.00
Large802–30,819709$3.42$2.80$2.30–$4.75

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$4.00
Median second-low unit price
$4.00
Median engineer’s estimate
$4.00
Median gap, second vs. low
+0%

415 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0007-05-016 · let Nov 4, 2026 · Eastland County, Brownwood District

Line quantity 4,699 LF · Engineer’s estimate $2.00/LF

  • 1. Northeastern Pavers, LLC

    LOW BID · WINNER
    Unit price
    $2.00/LF
    Extension
    $9,398.00
    Proposal total
    $9,329,948
    Money left on the table
    $150,839 (1.62%)
    vs. engineer’s estimate
    0%
  • Unit price
    $3.00/LF
    Extension
    $14,097.00
    Proposal total
    $9,480,787
    vs. low bid
    +$150,839
    vs. engineer’s estimate
    +50%
  • Unit price
    $2.00/LF
    Extension
    $9,398.00
    Proposal total
    $10,598,437
    vs. low bid
    +$1,268,489
    vs. engineer’s estimate
    0%
  • Unit price
    $2.00/LF
    Extension
    $9,398.00
    Proposal total
    $11,265,688
    vs. low bid
    +$1,935,740
    vs. engineer’s estimate
    0%

Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District

Line quantity 3,855 LF · Engineer’s estimate $6.00/LF

  • Unit price
    $2.89/LF
    Extension
    $11,140.95
    Proposal total
    $412,233,374
    Money left on the table
    $3,506,193 (0.85%)
    vs. engineer’s estimate
    -51.8%
  • 2. Pulice Construction, Inc.

    Unit price
    $2.86/LF
    Extension
    $11,025.30
    Proposal total
    $415,739,567
    vs. low bid
    +$3,506,193
    vs. engineer’s estimate
    -52.3%
  • 3. Fluor Enterprises, Inc.

    Unit price
    $3.00/LF
    Extension
    $11,565.00
    Proposal total
    $473,353,333
    vs. low bid
    +$61,119,959
    vs. engineer’s estimate
    -50%
  • 4. Harper Brothers Construction LLC

    Unit price
    $6.00/LF
    Extension
    $23,130.00
    Proposal total
    $477,550,553
    vs. low bid
    +$65,317,180
    vs. engineer’s estimate
    0%
  • Unit price
    $2.80/LF
    Extension
    $10,794.00
    Proposal total
    $477,564,067
    vs. low bid
    +$65,330,694
    vs. engineer’s estimate
    -53.3%
  • 6. Balfour Beatty Infrastructure, Inc.

    Unit price
    $2.89/LF
    Extension
    $11,140.95
    Proposal total
    $492,134,823
    vs. low bid
    +$79,901,450
    vs. engineer’s estimate
    -51.8%

Proposal 0044-06-079 · let Nov 3, 2026 · Montague County, Wichita Falls District

Line quantity 1,123 LF · Engineer’s estimate $1.00/LF

  • 1. Breedon Investments USA Inc.

    LOW BID · WINNER
    Unit price
    $2.00/LF
    Extension
    $2,246.00
    Proposal total
    $12,173,490
    Money left on the table
    $216,123 (1.78%)
    vs. engineer’s estimate
    +100%
  • Unit price
    $1.00/LF
    Extension
    $1,123.00
    Proposal total
    $12,389,613
    vs. low bid
    +$216,123
    vs. engineer’s estimate
    0%
  • Unit price
    $2.00/LF
    Extension
    $2,246.00
    Proposal total
    $12,704,850
    vs. low bid
    +$531,360
    vs. engineer’s estimate
    +100%
  • 4. Lipham Asphalt and Paving Company, LLC

    Unit price
    $2.50/LF
    Extension
    $2,807.50
    Proposal total
    $12,946,215
    vs. low bid
    +$772,725
    vs. engineer’s estimate
    +150%
  • Unit price
    $2.85/LF
    Extension
    $3,200.55
    Proposal total
    $14,559,655
    vs. low bid
    +$2,386,165
    vs. engineer’s estimate
    +185%
  • Unit price
    $2.00/LF
    Extension
    $2,246.00
    Proposal total
    $15,188,072
    vs. low bid
    +$3,014,582
    vs. engineer’s estimate
    +100%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040007-05-016EastlandBrownwood4,6994Northeastern Pavers, LLC$2.00$2.00
2026-11-030015-13-432TravisAustin3,8556Austin Bridge & Road Services, LP$2.89$6.00
2026-11-030044-06-079MontagueWichita Falls1,1236Breedon Investments USA Inc.$2.00$1.00
2026-11-030059-05-048ShelbyLufkin6895Clark Construction of Texas, Inc.$4.00$5.00
2026-11-030220-01-038HidalgoPharr1852Foremost Paving, Inc.$15.15$3.00
2026-11-032552-01-062El PasoEl Paso1,7396Allen Concrete, LLC$3.60$3.10
2026-10-070022-01-034TerrellOdessa247Relmco, Inc.$6.60$4.00
2026-10-070092-05-058EllisDallas8,1671Clark Construction of Texas, Inc.$3.00$2.50
2026-10-070907-00-217Tom GreenSan Angelo9417Flat Line, Inc.$3.00$2.96
2026-10-060009-11-248DallasDallas3537Ragle Construction, Inc.$2.00$1.70

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene46$4.60$4.60$2.00-19.09%
Amarillo41$0.800$2.00$1.50-25.07%
Atlanta47$6.00$6.25$2.50—
Austin136$4.00$3.50$3.000%
Beaumont55$2.00$2.13$2.80-8.33%
Brownwood24$2.00$2.00$2.00+16.67%
Bryan72$1.00$3.00$5.40-18.03%
Childress52$2.00$3.15$4.12—
Corpus Christi65$1.00$3.00$1.10-34%
Dallas332$2.54$3.00$1.85-21.33%
El Paso42$4.10$4.00$2.75+11.14%
Fort Worth124$2.00$2.75$5.000%
Houston182$2.00$2.25$1.50-15%
Laredo45$4.50$4.50$2.50+11.11%
Lubbock63$4.00$2.90$1.75-2.5%
Lufkin27$1.50$1.50$1.50+42.86%
Odessa58$2.20$2.21$7.00-24.93%
Paris48$2.00$3.15$4.50+17.65%
Pharr175$3.00$3.00$2.60-20%
San Angelo33$2.48$4.75$3.00—
San Antonio158$4.00$4.00$4.00-12.73%
Tyler116$3.00$3.15$3.50-27.27%
Waco88$1.85$2.80$2.75-20%
Wichita Falls32$2.00$2.00$1.00—
Yoakum67$7.80$5.90$5.00+31.82%

Related items

Is your price for item 677-7008 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.