Elim EXT PM & Mrks (6") (Item 677-7002): TxDOT Unit Price History

2,138 bids · 424 bid lines · Sep 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 677-7002 · ELIM EXT PM & MRKS (6") · Unit: LF

Low bid
$0.150/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.290/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.300/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
+6.67%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$2.00$4.00$6.00101001K10K100K1M10MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 1.93 − 0.244·ln qty, R² 0.42)320 plotted bids, 4 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 677-7002 (Elim EXT PM & Mrks (6")) is measured in LF. Between Sep 6, 2024 and Nov 4, 2026, contractors entered 2,138 bids for it on 424 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,288 bids was $0.290 per LF, and the winning low bidders priced it at a weighted median of $0.150 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.300 per LF, so winning bids came in 50.0% below the estimate.

By calendar year, the median bid moved from $0.750 in 2025 (816 bids) to $0.800 in 2026 (1,201 bids), up 6.7%. The middle half of 2026 bids fell between $0.500 and $1.50.

Comparing the last 12 months with the 12 months before, the median unit price rose 6.67%.

Quantity matters for this item. Lines of 8 to 2,968 LF had a weighted median of $1.10, while lines above 19,960 LF had $0.300, a 73% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 414 lines where both a winning and a second-place bid were published, the median winning unit price was $0.750 against $0.750 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Paris had the lowest weighted median ($0.120) and Abilene the highest ($1.50). The busiest district for this item was Houston.

The most recent letting with this item was on Nov 4, 2026 in Hunt County, where Cdm Holdings was the low bidder at $0.090 per LF for 2,523,000 LF against an estimate of $0.300.

13 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 677-7001 Elim EXT PM & Mrks (4") (weighted median $0.150 per LF); 677-7008 Elim EXT PM & Mrks (24") (weighted median $2.80 per LF); 677-7004 Elim EXT PM & Mrks (8") (weighted median $0.550 per LF); 677-7009 Elim EXT PM & Mrks (Arrow) (weighted median $50.00 per EA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
202412124$0.460$0.370$0.820$0.500$2.40
2025816173$0.460$0.380$0.750$0.500$1.18
20261,201228$0.320$0.280$0.800$0.500$1.50

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small8–2,968714$1.87$1.10$1.00–$3.00
Medium3,000–19,683714$0.940$0.740$0.520–$1.10
Large19,960–5,163,780710$0.350$0.300$0.340–$0.650

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.750
Median second-low unit price
$0.750
Median engineer’s estimate
$0.730
Median gap, second vs. low
+0%

414 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 3,800 LF · Engineer’s estimate $0.350/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $0.68/LF
    Extension
    $2,584.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    +94.3%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $0.65/LF
    Extension
    $2,470.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +85.7%
  • Unit price
    $0.80/LF
    Extension
    $3,040.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    +128.6%
  • Unit price
    $0.59/LF
    Extension
    $2,242.00
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    +68.6%
  • 5. Sema Construction, Inc.

    Unit price
    $0.59/LF
    Extension
    $2,242.00
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    +68.6%
  • 6. Zachry Construction Corporation

    Unit price
    $0.61/LF
    Extension
    $2,318.00
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    +74.3%

Proposal 1052-02-098 · let Nov 4, 2026 · Nueces County, Corpus Christi District

Line quantity 16,623 LF · Engineer’s estimate $1.00/LF

  • 1. J E Construction Services, LLC

    LOW BID · WINNER
    Unit price
    $1.00/LF
    Extension
    $16,623.00
    Proposal total
    $3,833,265
    Money left on the table
    $3,958 (0.1%)
    vs. engineer’s estimate
    0%
  • Unit price
    $0.85/LF
    Extension
    $14,129.55
    Proposal total
    $3,837,222
    vs. low bid
    +$3,958
    vs. engineer’s estimate
    -15%
  • Unit price
    $1.00/LF
    Extension
    $16,623.00
    Proposal total
    $4,616,801
    vs. low bid
    +$783,537
    vs. engineer’s estimate
    0%
  • 4. Stx Civil

    Unit price
    $0.95/LF
    Extension
    $15,791.85
    Proposal total
    $4,817,402
    vs. low bid
    +$984,137
    vs. engineer’s estimate
    -5%
  • Unit price
    $0.90/LF
    Extension
    $14,960.70
    Proposal total
    $4,943,316
    vs. low bid
    +$1,110,051
    vs. engineer’s estimate
    -10%

Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District

Line quantity 85,623 LF · Engineer’s estimate $0.490/LF

  • Unit price
    $0.60/LF
    Extension
    $51,373.80
    Proposal total
    $412,233,374
    Money left on the table
    $3,506,193 (0.85%)
    vs. engineer’s estimate
    +22.4%
  • 2. Pulice Construction, Inc.

    Unit price
    $0.41/LF
    Extension
    $35,105.43
    Proposal total
    $415,739,567
    vs. low bid
    +$3,506,193
    vs. engineer’s estimate
    -16.3%
  • 3. Fluor Enterprises, Inc.

    Unit price
    $0.43/LF
    Extension
    $36,817.89
    Proposal total
    $473,353,333
    vs. low bid
    +$61,119,959
    vs. engineer’s estimate
    -12.2%
  • 4. Harper Brothers Construction LLC

    Unit price
    $0.65/LF
    Extension
    $55,654.95
    Proposal total
    $477,550,553
    vs. low bid
    +$65,317,180
    vs. engineer’s estimate
    +32.7%
  • Unit price
    $0.40/LF
    Extension
    $34,249.20
    Proposal total
    $477,564,067
    vs. low bid
    +$65,330,694
    vs. engineer’s estimate
    -18.4%
  • 6. Balfour Beatty Infrastructure, Inc.

    Unit price
    $0.60/LF
    Extension
    $51,373.80
    Proposal total
    $492,134,823
    vs. low bid
    +$79,901,450
    vs. engineer’s estimate
    +22.4%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040009-06-056HuntParis2,523,0002Cdm Holdings$0.090$0.300
2026-11-040195-02-092DentonDallas3,8006Indus Road & Bridge, Inc.$0.680$0.350
2026-11-041052-02-098NuecesCorpus Christi16,6235J E Construction Services, LLC$1.00$1.00
2026-11-030015-13-432TravisAustin85,6236Austin Bridge & Road Services, LP$0.600$0.490
2026-11-030038-01-107WebbLaredo1,5964Hjc Farms, Inc.$1.05$0.500
2026-11-030059-05-048ShelbyLufkin93,6585Clark Construction of Texas, Inc.$0.130$0.300
2026-11-030168-09-191RandallAmarillo27,5208Coppell Construction Co., Inc.$1.50$0.530
2026-11-032552-01-062El PasoEl Paso21,4966Allen Concrete, LLC$0.600$1.20
2026-11-033330-01-011McLennanWaco7409The Levy Company, LLC$2.53$0.500
2026-10-146502-76-001EllisDallas6,2502Stripe-A-Zone, LLC$1.05$0.600

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene50$1.53$1.50$0.500+50%
Amarillo75$0.330$0.450$0.510+35.29%
Atlanta53$0.450$0.520$0.600-52.67%
Austin144$0.600$0.430$0.4900%
Beaumont64$0.130$0.280$0.200+11.54%
Brownwood65$0.850$1.00$1.15+10%
Bryan53$1.50$1.45$0.500—
Childress46$0.550$0.520$0.800—
Corpus Christi34$1.00$0.950$1.00+30.23%
Dallas285$0.350$0.550$0.400-9.68%
El Paso34$0.400$0.400$0.350-26.21%
Fort Worth110$0.150$0.180$0.280-15.38%
Houston319$0.260$0.300$0.380-10%
Laredo53$0.410$0.470$0.500-32.69%
Lubbock74$0.700$0.750$1.10-5.84%
Lufkin26$0.130$0.140$0.300+18.18%
Odessa68$0.600$0.600$0.350+100.95%
Paris84$0.090$0.120$0.300+75.44%
Pharr65$0.150$0.150$0.500-52.22%
San Angelo38$1.50$1.15$4.75—
San Antonio133$0.150$0.150$0.140-64.5%
Tyler88$0.310$0.550$0.500+100%
Waco72$0.310$0.350$0.550+59%
Wichita Falls30$0.600$1.10$0.430+13%
Yoakum75$0.440$0.440$1.50+30%

Related items

Is your price for item 677-7002 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.