Elim EXT PM & Mrks (6") (Item 677-7002): TxDOT Unit Price History
2,138 bids · 424 bid lines · Sep 6, 2024 to Nov 4, 2026 · unit of measure LF
TxDOT 677-7002 · ELIM EXT PM & MRKS (6") · Unit: LF
- Low bid
- $0.150/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $0.290/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $0.300/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- +6.67%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 677-7002 (Elim EXT PM & Mrks (6")) is measured in LF. Between Sep 6, 2024 and Nov 4, 2026, contractors entered 2,138 bids for it on 424 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,288 bids was $0.290 per LF, and the winning low bidders priced it at a weighted median of $0.150 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $0.300 per LF, so winning bids came in 50.0% below the estimate.
By calendar year, the median bid moved from $0.750 in 2025 (816 bids) to $0.800 in 2026 (1,201 bids), up 6.7%. The middle half of 2026 bids fell between $0.500 and $1.50.
Comparing the last 12 months with the 12 months before, the median unit price rose 6.67%.
Quantity matters for this item. Lines of 8 to 2,968 LF had a weighted median of $1.10, while lines above 19,960 LF had $0.300, a 73% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 414 lines where both a winning and a second-place bid were published, the median winning unit price was $0.750 against $0.750 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Paris had the lowest weighted median ($0.120) and Abilene the highest ($1.50). The busiest district for this item was Houston.
The most recent letting with this item was on Nov 4, 2026 in Hunt County, where Cdm Holdings was the low bidder at $0.090 per LF for 2,523,000 LF against an estimate of $0.300.
13 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 677-7001 Elim EXT PM & Mrks (4") (weighted median $0.150 per LF); 677-7008 Elim EXT PM & Mrks (24") (weighted median $2.80 per LF); 677-7004 Elim EXT PM & Mrks (8") (weighted median $0.550 per LF); 677-7009 Elim EXT PM & Mrks (Arrow) (weighted median $50.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 121 | 24 | $0.460 | $0.370 | $0.820 | $0.500 | $2.40 |
| 2025 | 816 | 173 | $0.460 | $0.380 | $0.750 | $0.500 | $1.18 |
| 2026 | 1,201 | 228 | $0.320 | $0.280 | $0.800 | $0.500 | $1.50 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 8–2,968 | 714 | $1.87 | $1.10 | $1.00–$3.00 |
| Medium | 3,000–19,683 | 714 | $0.940 | $0.740 | $0.520–$1.10 |
| Large | 19,960–5,163,780 | 710 | $0.350 | $0.300 | $0.340–$0.650 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $0.750
- Median second-low unit price
- $0.750
- Median engineer’s estimate
- $0.730
- Median gap, second vs. low
- +0%
414 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 3,800 LF · Engineer’s estimate $0.350/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $0.68/LF | $2,584.00 | — | +94.3% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $0.65/LF | $2,470.00 | -$114.00 | +85.7% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $0.80/LF | $3,040.00 | +$456.00 | +128.6% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $0.59/LF | $2,242.00 | -$342.00 | +68.6% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $0.59/LF | $2,242.00 | -$342.00 | +68.6% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $0.61/LF | $2,318.00 | -$266.00 | +74.3% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $0.68/LF
- Extension
- $2,584.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- +94.3%
2. Rpm Xconstruction, LLC
- Unit price
- $0.65/LF
- Extension
- $2,470.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- +85.7%
- Unit price
- $0.80/LF
- Extension
- $3,040.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- +128.6%
4. Webber, LLC
- Unit price
- $0.59/LF
- Extension
- $2,242.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- +68.6%
5. Sema Construction, Inc.
- Unit price
- $0.59/LF
- Extension
- $2,242.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- +68.6%
6. Zachry Construction Corporation
- Unit price
- $0.61/LF
- Extension
- $2,318.00
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- +74.3%
Proposal 1052-02-098 · let Nov 4, 2026 · Nueces County, Corpus Christi District
Line quantity 16,623 LF · Engineer’s estimate $1.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | J E Construction Services, LLCLOW BID | $1.00/LF | $16,623.00 | — | 0% | $3,833,265 | $3,958 (0.1%) left on table |
| 2 | Anderson Columbia Co., Inc. | $0.85/LF | $14,129.55 | -$2,493 | -15% | $3,837,222 | +$3,958 |
| 3 | Ck Newberry, LLC | $1.00/LF | $16,623.00 | $0.000 | 0% | $4,616,801 | +$783,537 |
| 4 | Stx Civil | $0.95/LF | $15,791.85 | -$831.15 | -5% | $4,817,402 | +$984,137 |
| 5 | Texas Materials Group, Inc. | $0.90/LF | $14,960.70 | -$1,662 | -10% | $4,943,316 | +$1,110,051 |
1. J E Construction Services, LLC
LOW BID · WINNER- Unit price
- $1.00/LF
- Extension
- $16,623.00
- Proposal total
- $3,833,265
- Money left on the table
- $3,958 (0.1%)
- vs. engineer’s estimate
- 0%
- Unit price
- $0.85/LF
- Extension
- $14,129.55
- Proposal total
- $3,837,222
- vs. low bid
- +$3,958
- vs. engineer’s estimate
- -15%
- Unit price
- $1.00/LF
- Extension
- $16,623.00
- Proposal total
- $4,616,801
- vs. low bid
- +$783,537
- vs. engineer’s estimate
- 0%
4. Stx Civil
- Unit price
- $0.95/LF
- Extension
- $15,791.85
- Proposal total
- $4,817,402
- vs. low bid
- +$984,137
- vs. engineer’s estimate
- -5%
- Unit price
- $0.90/LF
- Extension
- $14,960.70
- Proposal total
- $4,943,316
- vs. low bid
- +$1,110,051
- vs. engineer’s estimate
- -10%
Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District
Line quantity 85,623 LF · Engineer’s estimate $0.490/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Austin Bridge & Road Services, LPLOW BID | $0.60/LF | $51,373.80 | — | +22.4% | $412,233,374 | $3,506,193 (0.85%) left on table |
| 2 | Pulice Construction, Inc. | $0.41/LF | $35,105.43 | -$16,268 | -16.3% | $415,739,567 | +$3,506,193 |
| 3 | Fluor Enterprises, Inc. | $0.43/LF | $36,817.89 | -$14,556 | -12.2% | $473,353,333 | +$61,119,959 |
| 4 | Harper Brothers Construction LLC | $0.65/LF | $55,654.95 | +$4,281 | +32.7% | $477,550,553 | +$65,317,180 |
| 5 | Webber, LLC | $0.40/LF | $34,249.20 | -$17,125 | -18.4% | $477,564,067 | +$65,330,694 |
| 6 | Balfour Beatty Infrastructure, Inc. | $0.60/LF | $51,373.80 | $0.000 | +22.4% | $492,134,823 | +$79,901,450 |
1. Austin Bridge & Road Services, LP
LOW BID · WINNER- Unit price
- $0.60/LF
- Extension
- $51,373.80
- Proposal total
- $412,233,374
- Money left on the table
- $3,506,193 (0.85%)
- vs. engineer’s estimate
- +22.4%
2. Pulice Construction, Inc.
- Unit price
- $0.41/LF
- Extension
- $35,105.43
- Proposal total
- $415,739,567
- vs. low bid
- +$3,506,193
- vs. engineer’s estimate
- -16.3%
3. Fluor Enterprises, Inc.
- Unit price
- $0.43/LF
- Extension
- $36,817.89
- Proposal total
- $473,353,333
- vs. low bid
- +$61,119,959
- vs. engineer’s estimate
- -12.2%
4. Harper Brothers Construction LLC
- Unit price
- $0.65/LF
- Extension
- $55,654.95
- Proposal total
- $477,550,553
- vs. low bid
- +$65,317,180
- vs. engineer’s estimate
- +32.7%
5. Webber, LLC
- Unit price
- $0.40/LF
- Extension
- $34,249.20
- Proposal total
- $477,564,067
- vs. low bid
- +$65,330,694
- vs. engineer’s estimate
- -18.4%
6. Balfour Beatty Infrastructure, Inc.
- Unit price
- $0.60/LF
- Extension
- $51,373.80
- Proposal total
- $492,134,823
- vs. low bid
- +$79,901,450
- vs. engineer’s estimate
- +22.4%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0009-06-056 | Hunt | Paris | 2,523,000 | 2 | Cdm Holdings | $0.090 | $0.300 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 3,800 | 6 | Indus Road & Bridge, Inc. | $0.680 | $0.350 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 16,623 | 5 | J E Construction Services, LLC | $1.00 | $1.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 85,623 | 6 | Austin Bridge & Road Services, LP | $0.600 | $0.490 |
| 2026-11-03 | 0038-01-107 | Webb | Laredo | 1,596 | 4 | Hjc Farms, Inc. | $1.05 | $0.500 |
| 2026-11-03 | 0059-05-048 | Shelby | Lufkin | 93,658 | 5 | Clark Construction of Texas, Inc. | $0.130 | $0.300 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 27,520 | 8 | Coppell Construction Co., Inc. | $1.50 | $0.530 |
| 2026-11-03 | 2552-01-062 | El Paso | El Paso | 21,496 | 6 | Allen Concrete, LLC | $0.600 | $1.20 |
| 2026-11-03 | 3330-01-011 | McLennan | Waco | 740 | 9 | The Levy Company, LLC | $2.53 | $0.500 |
| 2026-10-14 | 6502-76-001 | Ellis | Dallas | 6,250 | 2 | Stripe-A-Zone, LLC | $1.05 | $0.600 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 50 | $1.53 | $1.50 | $0.500 | +50% |
| Amarillo | 75 | $0.330 | $0.450 | $0.510 | +35.29% |
| Atlanta | 53 | $0.450 | $0.520 | $0.600 | -52.67% |
| Austin | 144 | $0.600 | $0.430 | $0.490 | 0% |
| Beaumont | 64 | $0.130 | $0.280 | $0.200 | +11.54% |
| Brownwood | 65 | $0.850 | $1.00 | $1.15 | +10% |
| Bryan | 53 | $1.50 | $1.45 | $0.500 | — |
| Childress | 46 | $0.550 | $0.520 | $0.800 | — |
| Corpus Christi | 34 | $1.00 | $0.950 | $1.00 | +30.23% |
| Dallas | 285 | $0.350 | $0.550 | $0.400 | -9.68% |
| El Paso | 34 | $0.400 | $0.400 | $0.350 | -26.21% |
| Fort Worth | 110 | $0.150 | $0.180 | $0.280 | -15.38% |
| Houston | 319 | $0.260 | $0.300 | $0.380 | -10% |
| Laredo | 53 | $0.410 | $0.470 | $0.500 | -32.69% |
| Lubbock | 74 | $0.700 | $0.750 | $1.10 | -5.84% |
| Lufkin | 26 | $0.130 | $0.140 | $0.300 | +18.18% |
| Odessa | 68 | $0.600 | $0.600 | $0.350 | +100.95% |
| Paris | 84 | $0.090 | $0.120 | $0.300 | +75.44% |
| Pharr | 65 | $0.150 | $0.150 | $0.500 | -52.22% |
| San Angelo | 38 | $1.50 | $1.15 | $4.75 | — |
| San Antonio | 133 | $0.150 | $0.150 | $0.140 | -64.5% |
| Tyler | 88 | $0.310 | $0.550 | $0.500 | +100% |
| Waco | 72 | $0.310 | $0.350 | $0.550 | +59% |
| Wichita Falls | 30 | $0.600 | $1.10 | $0.430 | +13% |
| Yoakum | 75 | $0.440 | $0.440 | $1.50 | +30% |
Related items
- 677-7001 · Elim EXT PM & Mrks (4") ($0.150/LF)
- 677-7008 · Elim EXT PM & Mrks (24") ($2.80/LF)
- 677-7004 · Elim EXT PM & Mrks (8") ($0.550/LF)
- 677-7009 · Elim EXT PM & Mrks (Arrow) ($50.00/EA)
- 677-7015 · Elim EXT PM & Mrks (Word) ($50.00/EA)
- 677-7006 · Elim EXT PM & Mrks (12") ($1.00/LF)
- 678-7002 · PAV Surf Prep FOR MRK (6") ($0.020/LF)
- 678-7008 · PAV Surf Prep FOR MRK (24") ($0.500/LF)
Is your price for item 677-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.