Elim EXT PM & Mrks (Arrow) (Item 677-7009): TxDOT Unit Price History
1,615 bids · 339 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA
TxDOT 677-7009 · ELIM EXT PM & MRKS (ARROW) · Unit: EA
- Low bid
- $40.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $50.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $45.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -14.52%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 677-7009 (Elim EXT PM & Mrks (Arrow)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,615 bids for it on 339 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 922 bids was $50.00 per EA, and the winning low bidders priced it at a weighted median of $40.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $45.00 per EA, so winning bids came in 11.1% below the estimate.
By calendar year, the median bid moved from $80.00 in 2025 (687 bids) to $70.00 in 2026 (872 bids), down 12.5%. The middle half of 2026 bids fell between $47.98 and $100.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 14.52%.
Quantity matters for this item. Lines of 1 to 4 EA had a weighted median of $95.31, while lines above 22 EA had $50.00, a 48% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 327 lines where both a winning and a second-place bid were published, the median winning unit price was $75.00 against $75.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Odessa had the lowest weighted median ($38.70) and Paris the highest ($105.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Eastland County, where Northeastern Pavers, LLC was the low bidder at $100.00 per EA for 16 EA against an estimate of $55.00.
10 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 677-7001 Elim EXT PM & Mrks (4") (weighted median $0.150 per LF); 677-7008 Elim EXT PM & Mrks (24") (weighted median $2.80 per LF); 677-7002 Elim EXT PM & Mrks (6") (weighted median $0.290 per LF); 677-7004 Elim EXT PM & Mrks (8") (weighted median $0.550 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 56 | 15 | $73.29 | $70.00 | $94.40 | $70.00 | $126.25 |
| 2025 | 687 | 156 | $74.45 | $60.00 | $80.00 | $55.00 | $110.00 |
| 2026 | 872 | 168 | $58.98 | $50.00 | $70.00 | $47.98 | $100.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–4 | 565 | $117.31 | $95.31 | $60.00–$150.00 |
| Medium | 5–21 | 515 | $90.51 | $75.90 | $55.00–$107.60 |
| Large | 22–867 | 535 | $63.85 | $50.00 | $42.80–$80.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $75.00
- Median second-low unit price
- $75.00
- Median engineer’s estimate
- $72.00
- Median gap, second vs. low
- +0%
327 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0007-05-016 · let Nov 4, 2026 · Eastland County, Brownwood District
Line quantity 16 EA · Engineer’s estimate $55.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Northeastern Pavers, LLCLOW BID | $100.00/EA | $1,600.00 | — | +81.8% | $9,329,948 | $150,839 (1.62%) left on table |
| 2 | Ronald R. Wagner & Co., LP | $50.00/EA | $800.00 | -$800.00 | -9.1% | $9,480,787 | +$150,839 |
| 3 | Clark Construction of Texas, Inc. | $100.00/EA | $1,600.00 | $0.000 | +81.8% | $10,598,437 | +$1,268,489 |
| 4 | Ck Newberry, LLC | $100.00/EA | $1,600.00 | $0.000 | +81.8% | $11,265,688 | +$1,935,740 |
- LOW BID · WINNER
- Unit price
- $100.00/EA
- Extension
- $1,600.00
- Proposal total
- $9,329,948
- Money left on the table
- $150,839 (1.62%)
- vs. engineer’s estimate
- +81.8%
- Unit price
- $50.00/EA
- Extension
- $800.00
- Proposal total
- $9,480,787
- vs. low bid
- +$150,839
- vs. engineer’s estimate
- -9.1%
- Unit price
- $100.00/EA
- Extension
- $1,600.00
- Proposal total
- $10,598,437
- vs. low bid
- +$1,268,489
- vs. engineer’s estimate
- +81.8%
- Unit price
- $100.00/EA
- Extension
- $1,600.00
- Proposal total
- $11,265,688
- vs. low bid
- +$1,935,740
- vs. engineer’s estimate
- +81.8%
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 6 EA · Engineer’s estimate $58.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $45.00/EA | $270.00 | — | -22.4% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $57.75/EA | $346.50 | +$76.50 | -0.4% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $58.00/EA | $348.00 | +$78.00 | 0% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $65.00/EA | $390.00 | +$120.00 | +12.1% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $45.00/EA
- Extension
- $270.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -22.4%
- Unit price
- $57.75/EA
- Extension
- $346.50
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- -0.4%
3. Tiseo Paving Company, LLC
- Unit price
- $58.00/EA
- Extension
- $348.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- 0%
4. Harper Brothers Construction LLC
- Unit price
- $65.00/EA
- Extension
- $390.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- +12.1%
Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District
Line quantity 60 EA · Engineer’s estimate $43.53/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Austin Bridge & Road Services, LPLOW BID | $55.00/EA | $3,300.00 | — | +26.3% | $412,233,374 | $3,506,193 (0.85%) left on table |
| 2 | Pulice Construction, Inc. | $45.92/EA | $2,755.20 | -$544.80 | +5.5% | $415,739,567 | +$3,506,193 |
| 3 | Fluor Enterprises, Inc. | $48.15/EA | $2,889.00 | -$411.00 | +10.6% | $473,353,333 | +$61,119,959 |
| 4 | Harper Brothers Construction LLC | $200.00/EA | $12,000.00 | +$8,700 | +359.5% | $477,550,553 | +$65,317,180 |
| 5 | Webber, LLC | $45.00/EA | $2,700.00 | -$600.00 | +3.4% | $477,564,067 | +$65,330,694 |
| 6 | Balfour Beatty Infrastructure, Inc. | $55.00/EA | $3,300.00 | $0.000 | +26.3% | $492,134,823 | +$79,901,450 |
1. Austin Bridge & Road Services, LP
LOW BID · WINNER- Unit price
- $55.00/EA
- Extension
- $3,300.00
- Proposal total
- $412,233,374
- Money left on the table
- $3,506,193 (0.85%)
- vs. engineer’s estimate
- +26.3%
2. Pulice Construction, Inc.
- Unit price
- $45.92/EA
- Extension
- $2,755.20
- Proposal total
- $415,739,567
- vs. low bid
- +$3,506,193
- vs. engineer’s estimate
- +5.5%
3. Fluor Enterprises, Inc.
- Unit price
- $48.15/EA
- Extension
- $2,889.00
- Proposal total
- $473,353,333
- vs. low bid
- +$61,119,959
- vs. engineer’s estimate
- +10.6%
4. Harper Brothers Construction LLC
- Unit price
- $200.00/EA
- Extension
- $12,000.00
- Proposal total
- $477,550,553
- vs. low bid
- +$65,317,180
- vs. engineer’s estimate
- +359.5%
5. Webber, LLC
- Unit price
- $45.00/EA
- Extension
- $2,700.00
- Proposal total
- $477,564,067
- vs. low bid
- +$65,330,694
- vs. engineer’s estimate
- +3.4%
6. Balfour Beatty Infrastructure, Inc.
- Unit price
- $55.00/EA
- Extension
- $3,300.00
- Proposal total
- $492,134,823
- vs. low bid
- +$79,901,450
- vs. engineer’s estimate
- +26.3%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0007-05-016 | Eastland | Brownwood | 16 | 4 | Northeastern Pavers, LLC | $100.00 | $55.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 6 | 4 | Mario Sinacola & Sons Excavating, Inc. | $45.00 | $58.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 60 | 6 | Austin Bridge & Road Services, LP | $55.00 | $43.53 |
| 2026-11-03 | 0044-06-079 | Montague | Wichita Falls | 120 | 6 | Breedon Investments USA Inc. | $50.00 | $50.00 |
| 2026-11-03 | 0059-05-048 | Shelby | Lufkin | 51 | 5 | Clark Construction of Texas, Inc. | $100.00 | $65.00 |
| 2026-11-03 | 2552-01-062 | El Paso | El Paso | 42 | 6 | Allen Concrete, LLC | $96.00 | $58.62 |
| 2026-10-07 | 0092-05-058 | Ellis | Dallas | 143 | 1 | Clark Construction of Texas, Inc. | $50.00 | $57.51 |
| 2026-10-07 | 0907-00-217 | Tom Green | San Angelo | 14 | 7 | Flat Line, Inc. | $100.00 | $110.00 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 4 | 7 | Ragle Construction, Inc. | $40.00 | $56.00 |
| 2026-10-06 | 6496-83-001 | Gregg | Tyler | 25 | 2 | Striping Technology, L.P. | $100.00 | $40.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 32 | $85.10 | $100.00 | $37.00 | -28.15% |
| Amarillo | 32 | $15.00 | $50.00 | $100.00 | -18.18% |
| Atlanta | 21 | $40.00 | $44.00 | $75.00 | — |
| Austin | 139 | $78.75 | $70.00 | $50.00 | +5.26% |
| Beaumont | 49 | $25.00 | $40.00 | $37.51 | -9.42% |
| Brownwood | 21 | $100.00 | $100.00 | $55.00 | — |
| Bryan | 48 | $50.00 | $60.00 | $88.20 | -6.49% |
| Childress | 7 | $18.00 | $58.50 | $25.00 | — |
| Corpus Christi | 44 | $20.00 | $40.00 | $2.80 | +53.75% |
| Dallas | 296 | $50.00 | $52.72 | $50.00 | -27.94% |
| El Paso | 33 | $50.00 | $81.50 | $75.00 | -35.8% |
| Fort Worth | 103 | $30.00 | $40.00 | $29.61 | -28.57% |
| Houston | 207 | $40.00 | $40.00 | $45.00 | -28.57% |
| Laredo | 47 | $76.53 | $65.00 | $77.94 | +33.33% |
| Lubbock | 30 | $70.00 | $75.00 | $100.00 | +33.33% |
| Lufkin | 23 | $100.00 | $81.60 | $65.00 | — |
| Odessa | 20 | $38.50 | $38.70 | $80.00 | — |
| Paris | 33 | $105.00 | $105.00 | $85.00 | +53.28% |
| Pharr | 145 | $25.00 | $50.00 | $40.00 | -5.06% |
| San Angelo | 19 | $100.00 | $60.00 | $110.00 | — |
| San Antonio | 80 | $100.00 | $60.00 | $125.00 | +11.11% |
| Tyler | 56 | $80.00 | $70.50 | $75.00 | +38.75% |
| Waco | 77 | $40.00 | $55.00 | $41.35 | -5.71% |
| Wichita Falls | 45 | $50.00 | $50.00 | $50.00 | +16.67% |
| Yoakum | 8 | $55.00 | $55.00 | $60.00 | — |
Related items
- 677-7001 · Elim EXT PM & Mrks (4") ($0.150/LF)
- 677-7008 · Elim EXT PM & Mrks (24") ($2.80/LF)
- 677-7002 · Elim EXT PM & Mrks (6") ($0.290/LF)
- 677-7004 · Elim EXT PM & Mrks (8") ($0.550/LF)
- 677-7015 · Elim EXT PM & Mrks (Word) ($50.00/EA)
- 677-7006 · Elim EXT PM & Mrks (12") ($1.00/LF)
- 678-7002 · PAV Surf Prep FOR MRK (6") ($0.020/LF)
- 678-7008 · PAV Surf Prep FOR MRK (24") ($0.500/LF)