IN SM RD SN Sup&am TY10BWG(1)SA(P) (Item 644-7001): TxDOT Unit Price History
3,583 bids · 607 bid lines · Sep 6, 2024 to Nov 4, 2026 · unit of measure EA
TxDOT 644-7001 · IN SM RD SN SUP&AM TY10BWG(1)SA(P) · Unit: EA
- Low bid
- $654.50/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $683.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $700.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -1.92%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 644-7001 (IN SM RD SN Sup&am TY10BWG(1)SA(P)) is measured in EA. Between Sep 6, 2024 and Nov 4, 2026, contractors entered 3,583 bids for it on 607 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,841 bids was $683.00 per EA, and the winning low bidders priced it at a weighted median of $654.50 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $700.00 per EA, so winning bids came in 6.5% below the estimate.
By calendar year, the median bid moved from $780.00 in 2025 (1,769 bids) to $761.10 in 2026 (1,720 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $667.56 and $912.13.
Comparing the last 12 months with the 12 months before, the median unit price fell 1.92%.
Quantity matters for this item. Lines of 1 to 7 EA had a weighted median of $847.86, while lines above 33 EA had $690.00, a 19% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 588 lines where both a winning and a second-place bid were published, the median winning unit price was $745.00 against $750.00 from the second-lowest bidder, a median gap of 0.21% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Yoakum had the lowest weighted median ($510.00) and Wichita Falls the highest ($1,495.75). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $635.00 per EA for 49 EA against an estimate of $695.00.
34 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 644-7073 Remove SM RD SN Sup&am (weighted median $100.00 per EA); 644-7004 IN SM RD SN Sup&am TY10BWG(1)SA(T) (weighted median $790.00 per EA); 644-7028 IN SM RD SN Sup&am TYS80(1)SA(T) (weighted median $990.00 per EA); 644-7031 IN SM RD SN Sup&am TYS80(1)SA(U) (weighted median $1,203.60 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 94 | 18 | $819.76 | $750.00 | $758.08 | $677.90 | $911.25 |
| 2025 | 1,769 | 315 | $761.51 | $709.50 | $780.00 | $680.00 | $977.00 |
| 2026 | 1,720 | 275 | $714.87 | $681.60 | $761.10 | $667.56 | $912.13 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–7 | 1,229 | $939.59 | $847.86 | $742.00–$1,100.00 |
| Medium | 8–32 | 1,218 | $808.48 | $753.00 | $686.17–$900.00 |
| Large | 33–505 | 1,136 | $716.24 | $690.00 | $630.98–$795.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $745.00
- Median second-low unit price
- $750.00
- Median engineer’s estimate
- $774.00
- Median gap, second vs. low
- +0.21%
588 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 49 EA · Engineer’s estimate $695.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $635.00/EA | $31,115.00 | — | -8.6% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $676.28/EA | $33,137.72 | +$2,023 | -2.7% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $686.00/EA | $33,614.00 | +$2,499 | -1.3% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $650.00/EA | $31,850.00 | +$735.00 | -6.5% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $635.00/EA
- Extension
- $31,115.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -8.6%
- Unit price
- $676.28/EA
- Extension
- $33,137.72
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- -2.7%
3. Tiseo Paving Company, LLC
- Unit price
- $686.00/EA
- Extension
- $33,614.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- -1.3%
4. Harper Brothers Construction LLC
- Unit price
- $650.00/EA
- Extension
- $31,850.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -6.5%
Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District
Line quantity 147 EA · Engineer’s estimate $800.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lone Star Paving CompanyLOW BID | $745.00/EA | $109,515.00 | — | -6.9% | $6,732,215 | $1,063,968 (15.8%) left on table |
| 2 | Rk Hall, LLC | $789.70/EA | $116,085.90 | +$6,571 | -1.3% | $7,796,183 | +$1,063,968 |
| 3 | Zack Burkett Co. | $960.85/EA | $141,244.95 | +$31,730 | +20.1% | $7,966,171 | +$1,233,956 |
| 4 | Foutsco Paving Company, LLC | $745.00/EA | $109,515.00 | $0.000 | -6.9% | $8,000,580 | +$1,268,365 |
| 5 | Nobles Road Construction, Inc. | $801.00/EA | $117,747.00 | +$8,232 | +0.1% | $8,307,427 | +$1,575,212 |
| 6 | Ck Newberry, LLC | $800.00/EA | $117,600.00 | +$8,085 | 0% | $8,389,000 | +$1,656,785 |
| 7 | Reece Albert, Inc. | $891.04/EA | $130,982.88 | +$21,468 | +11.4% | $8,534,153 | +$1,801,938 |
| 8 | Texas Materials Group, Inc. | $880.00/EA | $129,360.00 | +$19,845 | +10% | $8,617,318 | +$1,885,103 |
| 9 | A. L. Helmcamp, Inc. | $760.00/EA | $111,720.00 | +$2,205 | -5% | $9,257,856 | +$2,525,641 |
- LOW BID · WINNER
- Unit price
- $745.00/EA
- Extension
- $109,515.00
- Proposal total
- $6,732,215
- Money left on the table
- $1,063,968 (15.8%)
- vs. engineer’s estimate
- -6.9%
2. Rk Hall, LLC
- Unit price
- $789.70/EA
- Extension
- $116,085.90
- Proposal total
- $7,796,183
- vs. low bid
- +$1,063,968
- vs. engineer’s estimate
- -1.3%
- Unit price
- $960.85/EA
- Extension
- $141,244.95
- Proposal total
- $7,966,171
- vs. low bid
- +$1,233,956
- vs. engineer’s estimate
- +20.1%
- Unit price
- $745.00/EA
- Extension
- $109,515.00
- Proposal total
- $8,000,580
- vs. low bid
- +$1,268,365
- vs. engineer’s estimate
- -6.9%
5. Nobles Road Construction, Inc.
- Unit price
- $801.00/EA
- Extension
- $117,747.00
- Proposal total
- $8,307,427
- vs. low bid
- +$1,575,212
- vs. engineer’s estimate
- +0.1%
- Unit price
- $800.00/EA
- Extension
- $117,600.00
- Proposal total
- $8,389,000
- vs. low bid
- +$1,656,785
- vs. engineer’s estimate
- 0%
- Unit price
- $891.04/EA
- Extension
- $130,982.88
- Proposal total
- $8,534,153
- vs. low bid
- +$1,801,938
- vs. engineer’s estimate
- +11.4%
- Unit price
- $880.00/EA
- Extension
- $129,360.00
- Proposal total
- $8,617,318
- vs. low bid
- +$1,885,103
- vs. engineer’s estimate
- +10%
- Unit price
- $760.00/EA
- Extension
- $111,720.00
- Proposal total
- $9,257,856
- vs. low bid
- +$2,525,641
- vs. engineer’s estimate
- -5%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 35 EA · Engineer’s estimate $1,000/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $625.00/EA | $21,875.00 | — | -37.5% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $655.00/EA | $22,925.00 | +$1,050 | -34.5% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $804.00/EA | $28,140.00 | +$6,265 | -19.6% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $804.00/EA | $28,140.00 | +$6,265 | -19.6% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $804.00/EA | $28,140.00 | +$6,265 | -19.6% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $834.39/EA | $29,203.65 | +$7,329 | -16.6% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $625.00/EA
- Extension
- $21,875.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -37.5%
2. Rpm Xconstruction, LLC
- Unit price
- $655.00/EA
- Extension
- $22,925.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -34.5%
- Unit price
- $804.00/EA
- Extension
- $28,140.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -19.6%
4. Webber, LLC
- Unit price
- $804.00/EA
- Extension
- $28,140.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -19.6%
5. Sema Construction, Inc.
- Unit price
- $804.00/EA
- Extension
- $28,140.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -19.6%
6. Zachry Construction Corporation
- Unit price
- $834.39/EA
- Extension
- $29,203.65
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -16.6%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 49 | 4 | Mario Sinacola & Sons Excavating, Inc. | $635.00 | $695.00 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 147 | 9 | Lone Star Paving Company | $745.00 | $800.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 35 | 6 | Indus Road & Bridge, Inc. | $625.00 | $1,000.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 29 | 11 | Fluor Enterprises, Inc. | $733.00 | $650.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 43 | 7 | Big Creek Construction, Ltd. | $600.00 | $750.00 |
| 2026-11-04 | 0285-03-066 | Hays | Austin | 4 | 9 | Lone Star Sitework, LLC | $1,000.00 | $800.00 |
| 2026-11-04 | 0923-06-068 | Brown | Brownwood | 11 | 6 | Jay Mills Contracting, Incorporated | $840.00 | $800.00 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 14 | 2 | Texas Materials Group, Inc. | $654.50 | $665.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 55 | 9 | Highway 19 Construction LLC | $625.00 | $525.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 2 | 5 | J E Construction Services, LLC | $1,369.00 | $850.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 143 | $745.00 | $760.00 | $800.00 | +0.61% |
| Amarillo | 72 | $550.00 | $800.00 | $1,000.00 | 0% |
| Atlanta | 112 | $765.00 | $800.00 | $715.00 | 0% |
| Austin | 357 | $560.00 | $625.00 | $650.00 | -4.87% |
| Beaumont | 151 | $660.00 | $700.00 | $700.00 | -1.82% |
| Brownwood | 63 | $840.00 | $750.00 | $780.00 | +18.22% |
| Bryan | 186 | $600.00 | $673.00 | $750.00 | -2.94% |
| Childress | 30 | $665.00 | $735.00 | $750.00 | — |
| Corpus Christi | 74 | $777.00 | $800.00 | $750.00 | -5.17% |
| Dallas | 569 | $654.50 | $650.00 | $700.00 | -7.26% |
| El Paso | 44 | $650.00 | $950.00 | $800.00 | +10.5% |
| Fort Worth | 218 | $715.00 | $710.63 | $880.00 | -0.16% |
| Houston | 274 | $650.00 | $675.00 | $540.00 | +2.33% |
| Laredo | 81 | $773.06 | $768.45 | $825.00 | -2.7% |
| Lubbock | 58 | $690.00 | $739.15 | $790.00 | +8.28% |
| Lufkin | 38 | $315.00 | $771.47 | $693.00 | — |
| Odessa | 168 | $754.60 | $825.00 | $750.00 | -6.22% |
| Paris | 196 | $625.00 | $659.00 | $650.00 | +0.94% |
| Pharr | 21 | $990.00 | $1,200.00 | $750.00 | — |
| San Angelo | 12 | $1,010.22 | $1,010.22 | $750.00 | — |
| San Antonio | 304 | $650.00 | $675.00 | $700.00 | -7.67% |
| Tyler | 186 | $720.00 | $710.00 | $700.00 | +2.07% |
| Waco | 88 | $630.00 | $660.00 | $1,200.00 | -6.83% |
| Wichita Falls | 13 | $1,130.00 | $1,495.75 | $2,000.00 | — |
| Yoakum | 125 | $510.00 | $510.00 | $925.00 | +11.8% |
Related items
- 644-7073 · Remove SM RD SN Sup&am ($100.00/EA)
- 644-7004 · IN SM RD SN Sup&am TY10BWG(1)SA(T) ($790.00/EA)
- 644-7028 · IN SM RD SN Sup&am TYS80(1)SA(T) ($990.00/EA)
- 644-7031 · IN SM RD SN Sup&am TYS80(1)SA(U) ($1,203.60/EA)
- 644-7007 · IN SM RD SN Sup&am TY10BWG(1)SA(U) ($1,000.00/EA)
- 644-7065 · Relocate SM RD SN Sup&am TY 10BWG ($642.60/EA)
- 636-7001 · Aluminum Signs (TY A) ($45.00/SF)
- 658-7019 · Instl DEL Assm (D-SW)SZ 1(BRF)GF2(BI) ($25.00/EA)
Is your price for item 644-7001 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.