IN SM RD SN Sup&am TYS80(1)SA(U) (Item 644-7031): TxDOT Unit Price History

1,366 bids · 237 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA

TxDOT 644-7031 · IN SM RD SN SUP&AM TYS80(1)SA(U) · Unit: EA

Low bid
$1,270.00/EA
Quantity-weighted median of winning unit prices
Weighted median
$1,203.60/EA
Quantity-weighted median of every bid
Engineer’s estimate
$1,100.00/EA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
0%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$750.00$1,000.00$1,250.00$1,500.00$1,750.00$2,000.001101001KQuantity (EA), log scaleUnit price ($/EA)
Winning (low) bid Other bid Fitted price curve (ln price = 7.08 − 0.011·ln qty, R² 0.00)320 plotted bids, 4 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 644-7031 (IN SM RD SN Sup&am TYS80(1)SA(U)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,366 bids for it on 237 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 675 bids was $1,203.60 per EA, and the winning low bidders priced it at a weighted median of $1,270.00 per EA.

TxDOT's engineer's estimate for the same lines had a weighted median of $1,100.00 per EA, so winning bids came in 15.5% above the estimate.

By calendar year, the median bid moved from $1,199.10 in 2025 (689 bids) to $1,200.00 in 2026 (646 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $1,000.00 and $1,357.75.

Comparing the last 12 months with the 12 months before, the median unit price did not change.

Quantity matters for this item. Lines of 1 to 2 EA had a weighted median of $1,200.00, while lines above 5 EA had $1,285.00; larger lines were priced higher here, which is unusual and worth checking against the individual lettings.

Across 226 lines where both a winning and a second-place bid were published, the median winning unit price was $1,153.72 against $1,200.00 from the second-lowest bidder, a median gap of 2.19% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($984.30) and Waco the highest ($1,725.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $1,245.00 per EA for 7 EA against an estimate of $1,220.00.

17 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 644-7073 Remove SM RD SN Sup&am (weighted median $100.00 per EA); 644-7001 IN SM RD SN Sup&am TY10BWG(1)SA(P) (weighted median $683.00 per EA); 644-7004 IN SM RD SN Sup&am TY10BWG(1)SA(T) (weighted median $790.00 per EA); 644-7028 IN SM RD SN Sup&am TYS80(1)SA(T) (weighted median $990.00 per EA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024316$1,458.46$1,310.00$1,248.00$1,130.00$1,490.00
2025689126$1,266.37$1,285.00$1,199.10$1,050.00$1,325.00
2026646105$1,237.28$1,210.00$1,200.00$1,000.00$1,357.75

Quantity bands

BandQuantity (EA)BidsWeighted avgWeighted median25th–75th pct
Small1–2781$1,238.36$1,200.00$1,048.00–$1,400.00
Medium3–4225$1,195.49$1,155.00$1,020.00–$1,286.93
Large5–467360$1,265.57$1,285.00$1,025.00–$1,300.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$1,153.72
Median second-low unit price
$1,200.00
Median engineer’s estimate
$1,200.00
Median gap, second vs. low
+2.19%

226 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 7 EA · Engineer’s estimate $1,220/EA

  • Unit price
    $1,245.00/EA
    Extension
    $8,715.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    +2%
  • Unit price
    $1,325.93/EA
    Extension
    $9,281.51
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    +8.7%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $1,045.00/EA
    Extension
    $7,315.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    -14.3%
  • 4. Harper Brothers Construction LLC

    Unit price
    $990.00/EA
    Extension
    $6,930.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -18.9%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 5 EA · Engineer’s estimate $3,250/EA

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $1,070.00/EA
    Extension
    $5,350.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -67.1%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $1,260.00/EA
    Extension
    $6,300.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -61.2%
  • Unit price
    $1,485.00/EA
    Extension
    $7,425.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -54.3%
  • Unit price
    $1,485.00/EA
    Extension
    $7,425.00
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -54.3%
  • 5. Sema Construction, Inc.

    Unit price
    $1,485.00/EA
    Extension
    $7,425.00
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -54.3%
  • 6. Zachry Construction Corporation

    Unit price
    $1,541.10/EA
    Extension
    $7,705.50
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -52.6%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 2 EA · Engineer’s estimate $1,250/EA

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $1,000.00/EA
    Extension
    $2,000.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    -20%
  • Unit price
    $1,200.00/EA
    Extension
    $2,400.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    -4%
  • Unit price
    $1,108.00/EA
    Extension
    $2,216.00
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -11.4%
  • Unit price
    $1,080.00/EA
    Extension
    $2,160.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    -13.6%
  • Unit price
    $1,030.00/EA
    Extension
    $2,060.00
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -17.6%
  • Unit price
    $1,050.00/EA
    Extension
    $2,100.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -16%
  • Unit price
    $1,100.00/EA
    Extension
    $2,200.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -12%
  • Unit price
    $1,050.00/EA
    Extension
    $2,100.00
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    -16%
  • 9. Zachry Construction Corporation

    Unit price
    $1,240.79/EA
    Extension
    $2,481.58
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    -0.7%
  • 10. Brizo Construction, LLC

    Unit price
    $1,100.00/EA
    Extension
    $2,200.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    -12%
  • Unit price
    $1,004.00/EA
    Extension
    $2,008.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    -19.7%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas74Mario Sinacola & Sons Excavating, Inc.$1,245.00$1,220.00
2026-11-040195-02-092DentonDallas56Indus Road & Bridge, Inc.$1,070.00$3,250.00
2026-11-040212-03-058BrazosBryan211Fluor Enterprises, Inc.$1,000.00$1,250.00
2026-11-041017-03-040HuntParis39Highway 19 Construction LLC$1,269.00$1,000.00
2026-11-030015-13-432TravisAustin126Austin Bridge & Road Services, LP$1,100.00$1,300.00
2026-11-036484-51-001WilliamsonAustin307Rhino Equity, LLC$1,100.00$1,000.00
2026-10-070143-03-049WilsonSan Antonio38Hunter Industries, Ltd.$980.00$1,300.00
2026-10-070921-02-527HidalgoPharr21Digg Commercial, LLC$1,200.00$1,150.00
2026-10-060009-11-248DallasDallas27Ragle Construction, Inc.$1,250.00$1,175.00
2026-09-096484-49-001TravisAustin94Rare Earth Landscape Solutions LLC$825.00$1,375.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene30$1,300.00$1,245.00$1,250.00—
Amarillo38$1,550.00$1,500.00$1,219.20+24.74%
Atlanta74$1,020.00$1,100.00$1,200.00+2.42%
Austin107$991.89$1,070.00$1,300.00+2.33%
Beaumont51$1,184.25$1,120.00$1,005.00+9.09%
Brownwood20$1,500.00$1,279.00$1,200.00—
Bryan47$1,000.00$1,100.00$1,225.00+0.92%
Childress12$1,366.25$1,273.75$1,216.42—
Corpus Christi52$1,325.00$1,450.00$1,100.00+13.54%
Dallas178$1,070.00$1,180.00$1,200.00-1.49%
El Paso19$1,520.00$1,520.00$1,120.00—
Fort Worth40$1,399.22$1,274.05$1,300.00+6.75%
Houston94$950.00$984.30$800.00-0.23%
Laredo21$992.81$1,000.00$1,510.00—
Lubbock19$1,285.00$1,300.00$1,100.00—
Lufkin35$900.00$1,463.25$1,200.00—
Odessa58$1,345.51$1,187.55$1,000.00-6.98%
Paris51$1,310.00$1,165.00$1,100.00+7.35%
Pharr66$1,350.00$1,350.00$950.00-5.99%
San Antonio176$1,000.00$1,166.00$1,200.00-6.34%
Tyler78$1,201.00$1,200.00$1,118.00+6.43%
Waco19$1,605.00$1,725.00$1,100.00—
Wichita Falls9$950.00$900.00$1,266.36—
Yoakum72$1,300.00$1,132.93$1,000.00+9.94%

Related items

Is your price for item 644-7031 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.