Conc Class IV, Bulkhead (Item 0400 4 8): FDOT Unit Price History
11 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure CY
- Weighted average (12 mo)
- $1,706.13/CY
- Contracts (12 mo)
- 11
- Total quantity (12 mo)
- 1,835.8 CY
- Total amount (12 mo)
- $3,132,116
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 6 | $1,190.80 | 1,592.1 | $1,895,871 |
| 2025 | 2025-01-01 – 2025-12-31 | 11 | $1,566.74 | 1,569.6 | $2,459,161 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 11 | $1,706.13 | 1,835.8 | $3,132,116 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 2 | $1,000.00 | -41.4% | 244.9 |
| 03 | 1 | $2,778.09 | +62.8% | 369 |
| 04 | 1 | $1,650.00 | -3.3% | 7.2 |
| 05 | 1 | $1,568.82 | -8% | 67.4 |
| 08 | 2 | $1,381.01 | -19.1% | 449.2 |
| 10 | 1 | $1,800.00 | +5.5% | 148.8 |
| 12 | 1 | $1,222.50 | -28.3% | 450.7 |
| 13 | 2 | $3,096.47 | +81.5% | 98.6 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0400 4 8 (Conc Class IV, Bulkhead) is measured in CY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 11 contracts with a quantity-weighted average of $1,706.13 per CY, on 1,835.8 CY worth $3,132,116 in total.
The same report run for earlier periods shows $1,190.80 in 2024 (6 contracts, 1,592.1 CY), $1,566.74 in 2025 (11 contracts, 1,569.6 CY), $1,706.13 in the latest 12 months (11 contracts, 1,835.8 CY). From 2024 to the latest 12 months the weighted average rose 43.3%.
Quantity let statewide grew 15% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 01 at $1,000.00 (2 contracts), area 03 at $2,778.09 (1 contract), area 04 at $1,650.00 (1 contract), area 05 at $1,568.82 (1 contract), area 08 at $1,381.01 (2 contracts), area 10 at $1,800.00 (1 contract), area 12 at $1,222.50 (1 contract), area 13 at $3,096.47 (2 contracts).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0400: 0400 0 11 Concrete Class NS, Gravity Wall Index 400-011 ($898.26 per CY, 34 contracts); 0400 4 5 Concrete Class IV, Bridge Substructure ($2,444.33 per CY, 29 contracts); 0400 2 10 Concrete Class II, Approach Slabs ($963.60 per CY, 28 contracts); 0400 7 1 Bridge Deck Grooving ($7.59 per SY, 24 contracts); 0400 9 1 Bridge Deck Planing ($7.78 per SY, 18 contracts).
Related items in section 0400
- 0400 0 11 · Concrete Class NS, Gravity Wall Index 400-011 ($898.26/CY)
- 0400 4 5 · Concrete Class IV, Bridge Substructure ($2,444.33/CY)
- 0400 2 10 · Concrete Class II, Approach Slabs ($963.60/CY)
- 0400 7 1 · Bridge Deck Grooving ($7.59/SY)
- 0400 9 1 · Bridge Deck Planing ($7.78/SY)
- 0400 2 4 · Conc Class II, Bridge Superstructure ($1,387.01/CY)
- 0400 4 1 · Concrete Class IV, Culverts ($2,139.81/CY)
- 0400 4 25 · Concrete Class IV, Mass, Substructure ($1,712.38/CY)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.