Traffic Control Officer (Item 0102 14): FDOT Unit Price History

194 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure HR

Weighted average (12 mo)
$53.78/HR
Contracts (12 mo)
194
Total quantity (12 mo)
258,292 HR
Total amount (12 mo)
$13,890,715

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31238$77.03237,195$18,271,707
20252025-01-01 – 2025-12-31244$83.16289,883$24,105,933
Latest 12 months2025-11-01 – 2026-10-31194$53.78258,292$13,890,715

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
0112$58.87+9.5%4,950
027$89.08+65.6%1,874
039$82.50+53.4%3,978
048$138.64+157.8%4,880
0514$50.80-5.5%14,540
0614$64.23+19.4%9,338
0717$68.93+28.2%56,114
0848$70.80+31.6%37,646
094$49.06-8.8%6,058
1014$49.08-8.7%11,918
114$17.50-67.5%3,988
1222$16.35-69.6%52,304
1314$79.73+48.3%10,960
141$0.010-100%640

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0102 14 (Traffic Control Officer) is measured in HR. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 194 contracts with a quantity-weighted average of $53.78 per HR, on 258,292 HR worth $13,890,715 in total.

The same report run for earlier periods shows $77.03 in 2024 (238 contracts, 237,195 HR), $83.16 in 2025 (244 contracts, 289,883 HR), $53.78 in the latest 12 months (194 contracts, 258,292 HR). From 2024 to the latest 12 months the weighted average fell 30.2%.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 12 had the lowest weighted average ($16.35 per HR, 22 contracts) and market area 04 the highest ($138.64, 8 contracts), 8.5 times as much. Market area 08 let the most contracts with this item (48). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0102: 0102 1 Maintenance OF Traffic ($1,069.75 per DA, 266 contracts); 0102 60 Work Zone Sign ($0.230 per ED, 265 contracts); 0102 74 1 Channelizing Device- Types I, II, DI, VP, Drum, OR LCD ($0.110 per ED, 263 contracts); 0102 99 Portable Changeable Message Sign, Temporary ($10.81 per ED, 257 contracts); 0102 76 Arrow Board / Advance Warning Arrow Panel ($5.10 per ED, 208 contracts).

Related items in section 0102

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.