Channelizing Device- Types I, II, DI, VP, Drum, OR LCD (Item 0102 74 1): FDOT Unit Price History
263 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure ED
- Weighted average (12 mo)
- $0.110/ED
- Contracts (12 mo)
- 263
- Total quantity (12 mo)
- 23,296,754 ED
- Total amount (12 mo)
- $2,510,867
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 320 | $0.120 | 29,130,262 | $3,400,283 |
| 2025 | 2025-01-01 – 2025-12-31 | 319 | $0.120 | 28,043,243 | $3,321,176 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 263 | $0.110 | 23,296,754 | $2,510,867 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 17 | $0.120 | +9.1% | 1,753,117 |
| 02 | 16 | $0.070 | -36.4% | 448,713 |
| 03 | 16 | $0.120 | +9.1% | 1,055,111 |
| 04 | 14 | $0.100 | -9.1% | 1,417,735 |
| 05 | 21 | $0.120 | +9.1% | 1,051,500 |
| 06 | 19 | $0.110 | 0% | 865,436 |
| 07 | 23 | $0.100 | -9.1% | 2,840,815 |
| 08 | 58 | $0.120 | +9.1% | 3,813,881 |
| 09 | 5 | $0.070 | -36.4% | 633,910 |
| 10 | 17 | $0.100 | -9.1% | 2,675,606 |
| 11 | 7 | $0.100 | -9.1% | 990,574 |
| 12 | 27 | $0.150 | +36.4% | 2,691,023 |
| 13 | 15 | $0.100 | -9.1% | 991,504 |
| 14 | 2 | $0.190 | +72.7% | 68,890 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0102 74 1 (Channelizing Device- Types I, II, DI, VP, Drum, OR LCD) is measured in ED. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 263 contracts with a quantity-weighted average of $0.110 per ED, on 23,296,754 ED worth $2,510,867 in total.
The same report run for earlier periods shows $0.120 in 2024 (320 contracts, 29,130,262 ED), $0.120 in 2025 (319 contracts, 28,043,243 ED), $0.110 in the latest 12 months (263 contracts, 23,296,754 ED). From 2024 to the latest 12 months the weighted average fell 8.3%.
Quantity let statewide shrank 20% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 02 had the lowest weighted average ($0.070 per ED, 16 contracts) and market area 12 the highest ($0.150, 27 contracts), 2.1 times as much. Market area 08 let the most contracts with this item (58). 14 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0102: 0102 1 Maintenance OF Traffic ($1,069.75 per DA, 266 contracts); 0102 60 Work Zone Sign ($0.230 per ED, 265 contracts); 0102 99 Portable Changeable Message Sign, Temporary ($10.81 per ED, 257 contracts); 0102 76 Arrow Board / Advance Warning Arrow Panel ($5.10 per ED, 208 contracts); 0102 14 Traffic Control Officer ($53.78 per HR, 194 contracts).
Related items in section 0102
- 0102 1 · Maintenance OF Traffic ($1,069.75/DA)
- 0102 60 · Work Zone Sign ($0.230/ED)
- 0102 99 · Portable Changeable Message Sign, Temporary ($10.81/ED)
- 0102 76 · Arrow Board / Advance Warning Arrow Panel ($5.10/ED)
- 0102 14 · Traffic Control Officer ($53.78/HR)
- 0102 74 8 · Channelizing Device- Pedestrian LCD (Longitudinal Channelizing Device) ($0.060/FD)
- 0102 4 1 · Pedestrian OR Bicycle Special Detour ($55.15/SY)
- 0102 2200 · Special Detour- Temporary Pavement ($21.92/SY)