Special Detour- Temporary Pavement (Item 0102 2200): FDOT Unit Price History

67 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY

Weighted average (12 mo)
$21.92/SY
Contracts (12 mo)
67
Total quantity (12 mo)
1,069,239 SY
Total amount (12 mo)
$23,433,902

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3162$34.50886,585$30,586,642
20252025-01-01 – 2025-12-3177$23.571,605,396$37,831,799
Latest 12 months2025-11-01 – 2026-10-3167$21.921,069,239$23,433,902

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
016$28.53+30.2%85,837
023$41.45+89.1%7,338
034$46.83+113.6%16,851
045$20.80-5.1%34,331
055$9.74-55.6%21,394
063$32.58+48.6%15,656
0711$22.13+1%396,499
0813$31.17+42.2%43,328
091$14.53-33.7%7,913
103$83.41+280.5%11,098
112$147.27+571.9%16,357
126$10.66-51.4%395,385
133$31.54+43.9%13,633

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0102 2200 (Special Detour- Temporary Pavement) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 67 contracts with a quantity-weighted average of $21.92 per SY, on 1,069,239 SY worth $23,433,902 in total.

The same report run for earlier periods shows $34.50 in 2024 (62 contracts, 886,585 SY), $23.57 in 2025 (77 contracts, 1,605,396 SY), $21.92 in the latest 12 months (67 contracts, 1,069,239 SY). From 2024 to the latest 12 months the weighted average fell 36.5%.

Quantity let statewide grew 21% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 11 market areas with at least three contracts, market area 05 had the lowest weighted average ($9.74 per SY, 5 contracts) and market area 10 the highest ($83.41, 3 contracts), 8.6 times as much. Market area 08 let the most contracts with this item (13). 13 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0102: 0102 1 Maintenance OF Traffic ($1,069.75 per DA, 266 contracts); 0102 60 Work Zone Sign ($0.230 per ED, 265 contracts); 0102 74 1 Channelizing Device- Types I, II, DI, VP, Drum, OR LCD ($0.110 per ED, 263 contracts); 0102 99 Portable Changeable Message Sign, Temporary ($10.81 per ED, 257 contracts); 0102 76 Arrow Board / Advance Warning Arrow Panel ($5.10 per ED, 208 contracts).

Related items in section 0102

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.