Driveways (ACP) (Item 530-7010): TxDOT Unit Price History
1,836 bids · 299 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure SY
TxDOT 530-7010 · DRIVEWAYS (ACP) · Unit: SY
- Low bid
- $48.00/SY
- Quantity-weighted median of winning unit prices
- Weighted median
- $59.25/SY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $58.00/SY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -6.67%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 530-7010 (Driveways (ACP)) is measured in SY. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,836 bids for it on 299 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 849 bids was $59.25 per SY, and the winning low bidders priced it at a weighted median of $48.00 per SY.
TxDOT's engineer's estimate for the same lines had a weighted median of $58.00 per SY, so winning bids came in 17.2% below the estimate.
By calendar year, the median bid moved from $75.00 in 2025 (1,004 bids) to $70.00 in 2026 (793 bids), down 6.7%. The middle half of 2026 bids fell between $50.00 and $97.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 6.67%.
Quantity matters for this item. Lines of 12 to 506 SY had a weighted median of $85.00, while lines above 2,447 SY had $58.52, a 31% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 293 lines where both a winning and a second-place bid were published, the median winning unit price was $60.00 against $68.00 from the second-lowest bidder, a median gap of 8.06% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 22 TxDOT districts with at least ten bids, Yoakum had the lowest weighted median ($21.50) and Fort Worth the highest ($100.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Denton County, where Indus Road & Bridge, Inc. was the low bidder at $92.00 per SY for 1,109 SY against an estimate of $80.00.
2 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 530-7006 Driveways (Conc) (weighted median $106.00 per SY); 529-7009 Conc Curb & Gutter (TY II) (weighted median $30.00 per LF); 531-7001 Conc Sidewalks (4") (weighted median $65.00 per SY); 533-7001 Mill Rumble Strips (Asphalt) (Shldr) (weighted median $0.180 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 39 | 6 | $84.79 | $75.00 | $100.00 | $81.50 | $140.00 |
| 2025 | 1,004 | 168 | $67.11 | $61.00 | $75.00 | $54.11 | $100.00 |
| 2026 | 793 | 125 | $63.28 | $59.25 | $70.00 | $50.00 | $97.00 |
Quantity bands
| Band | Quantity (SY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 12–506 | 618 | $100.23 | $85.00 | $68.00–$126.88 |
| Medium | 528–2,412 | 611 | $76.06 | $70.00 | $50.00–$96.05 |
| Large | 2,447–28,929 | 607 | $62.08 | $58.52 | $45.00–$80.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $60.00
- Median second-low unit price
- $68.00
- Median engineer’s estimate
- $65.00
- Median gap, second vs. low
- +8.06%
293 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 1,109 SY · Engineer’s estimate $80.00/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $92.00/SY | $102,028.00 | — | +15% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $75.00/SY | $83,175.00 | -$18,853 | -6.3% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $70.00/SY | $77,630.00 | -$24,398 | -12.5% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $53.38/SY | $59,198.42 | -$42,830 | -33.3% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $38.35/SY | $42,530.15 | -$59,498 | -52.1% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $60.11/SY | $66,661.99 | -$35,366 | -24.9% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $92.00/SY
- Extension
- $102,028.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- +15%
2. Rpm Xconstruction, LLC
- Unit price
- $75.00/SY
- Extension
- $83,175.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -6.3%
- Unit price
- $70.00/SY
- Extension
- $77,630.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -12.5%
4. Webber, LLC
- Unit price
- $53.38/SY
- Extension
- $59,198.42
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -33.3%
5. Sema Construction, Inc.
- Unit price
- $38.35/SY
- Extension
- $42,530.15
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -52.1%
6. Zachry Construction Corporation
- Unit price
- $60.11/SY
- Extension
- $66,661.99
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -24.9%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 2,557 SY · Engineer’s estimate $45.00/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $50.50/SY | $129,128.50 | — | +12.2% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $40.00/SY | $102,280.00 | -$26,849 | -11.1% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $43.98/SY | $112,456.86 | -$16,672 | -2.3% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $60.00/SY | $153,420.00 | +$24,292 | +33.3% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $58.82/SY | $150,402.74 | +$21,274 | +30.7% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $68.00/SY | $173,876.00 | +$44,748 | +51.1% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $50.00/SY | $127,850.00 | -$1,279 | +11.1% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $43.50/SY | $111,229.50 | -$17,899 | -3.3% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $39.93/SY | $102,101.01 | -$27,027 | -11.3% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $34.00/SY | $86,938.00 | -$42,191 | -24.4% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $52.10/SY | $133,219.70 | +$4,091 | +15.8% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $105.00/SY | $268,485.00 | +$139,357 | +133.3% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $50.50/SY
- Extension
- $129,128.50
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- +12.2%
- Unit price
- $40.00/SY
- Extension
- $102,280.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- -11.1%
- Unit price
- $43.98/SY
- Extension
- $112,456.86
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- -2.3%
- Unit price
- $60.00/SY
- Extension
- $153,420.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- +33.3%
- Unit price
- $58.82/SY
- Extension
- $150,402.74
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +30.7%
- Unit price
- $68.00/SY
- Extension
- $173,876.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- +51.1%
- Unit price
- $50.00/SY
- Extension
- $127,850.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- +11.1%
- Unit price
- $43.50/SY
- Extension
- $111,229.50
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- -3.3%
9. Zachry Construction Corporation
- Unit price
- $39.93/SY
- Extension
- $102,101.01
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- -11.3%
10. Brizo Construction, LLC
- Unit price
- $34.00/SY
- Extension
- $86,938.00
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- -24.4%
- Unit price
- $52.10/SY
- Extension
- $133,219.70
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- +15.8%
- Unit price
- $105.00/SY
- Extension
- $268,485.00
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +133.3%
Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District
Line quantity 1,866 SY · Engineer’s estimate $50.00/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Big Creek Construction, Ltd.LOW BID | $55.00/SY | $102,630.00 | — | +10% | $9,787,627 | $395,153 (4.04%) left on table |
| 2 | Larry Young Paving, Inc. | $53.00/SY | $98,898.00 | -$3,732 | +6% | $10,182,780 | +$395,153 |
| 3 | Knife River Corporation - South | $68.00/SY | $126,888.00 | +$24,258 | +36% | $10,424,591 | +$636,964 |
| 4 | Texas Materials Group, Inc. | $100.00/SY | $186,600.00 | +$83,970 | +100% | $12,020,138 | +$2,232,511 |
| 5 | A. L. Helmcamp, Inc. | $100.00/SY | $186,600.00 | +$83,970 | +100% | $12,374,454 | +$2,586,827 |
| 6 | Patin Construction LLC | $50.00/SY | $93,300.00 | -$9,330 | 0% | $15,629,317 | +$5,841,690 |
| 7 | Joe Bland Construction LLC | $55.00/SY | $102,630.00 | $0.000 | +10% | $18,492,861 | +$8,705,235 |
1. Big Creek Construction, Ltd.
LOW BID · WINNER- Unit price
- $55.00/SY
- Extension
- $102,630.00
- Proposal total
- $9,787,627
- Money left on the table
- $395,153 (4.04%)
- vs. engineer’s estimate
- +10%
- Unit price
- $53.00/SY
- Extension
- $98,898.00
- Proposal total
- $10,182,780
- vs. low bid
- +$395,153
- vs. engineer’s estimate
- +6%
- Unit price
- $68.00/SY
- Extension
- $126,888.00
- Proposal total
- $10,424,591
- vs. low bid
- +$636,964
- vs. engineer’s estimate
- +36%
- Unit price
- $100.00/SY
- Extension
- $186,600.00
- Proposal total
- $12,020,138
- vs. low bid
- +$2,232,511
- vs. engineer’s estimate
- +100%
- Unit price
- $100.00/SY
- Extension
- $186,600.00
- Proposal total
- $12,374,454
- vs. low bid
- +$2,586,827
- vs. engineer’s estimate
- +100%
6. Patin Construction LLC
- Unit price
- $50.00/SY
- Extension
- $93,300.00
- Proposal total
- $15,629,317
- vs. low bid
- +$5,841,690
- vs. engineer’s estimate
- 0%
7. Joe Bland Construction LLC
- Unit price
- $55.00/SY
- Extension
- $102,630.00
- Proposal total
- $18,492,861
- vs. low bid
- +$8,705,235
- vs. engineer’s estimate
- +10%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 1,109 | 6 | Indus Road & Bridge, Inc. | $92.00 | $80.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 2,557 | 12 | Fluor Enterprises, Inc. | $50.50 | $45.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 1,866 | 7 | Big Creek Construction, Ltd. | $55.00 | $50.00 |
| 2026-11-04 | 0285-03-066 | Hays | Austin | 391 | 9 | Lone Star Sitework, LLC | $76.00 | $60.00 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 92 | 7 | Stx Civil | $96.54 | $55.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 790 | 9 | Highway 19 Construction LLC | $75.00 | $50.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 471 | 5 | J E Construction Services, LLC | $74.00 | $50.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 1,623 | 6 | Austin Bridge & Road Services, LP | $157.67 | $70.73 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 8,856 | 8 | Hunter Industries, Ltd. | $51.32 | $50.90 |
| 2026-10-07 | 0200-01-093 | Angelina | Lufkin | 3,471 | 7 | Longview Bridge and Road, Ltd. | $47.00 | $53.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 38 | $70.00 | $70.00 | $80.00 | +9.38% |
| Amarillo | 21 | $95.00 | $100.00 | $85.00 | — |
| Atlanta | 18 | $45.00 | $65.00 | $60.00 | — |
| Austin | 190 | $49.20 | $68.99 | $57.50 | -4.13% |
| Beaumont | 50 | $37.00 | $49.10 | $57.00 | -18.84% |
| Brownwood | 7 | $34.00 | $40.70 | $86.00 | — |
| Bryan | 154 | $45.00 | $50.50 | $48.00 | -19.18% |
| Corpus Christi | 72 | $45.00 | $46.27 | $46.00 | -21.63% |
| Dallas | 304 | $62.00 | $67.00 | $70.00 | +0.76% |
| Fort Worth | 72 | $48.00 | $100.00 | $80.00 | +28.94% |
| Houston | 103 | $60.00 | $80.00 | $55.00 | +40.63% |
| Laredo | 30 | $39.06 | $60.00 | $60.00 | -32.84% |
| Lubbock | 35 | $86.50 | $82.00 | $88.00 | +33.08% |
| Lufkin | 96 | $53.00 | $59.00 | $65.00 | -30.23% |
| Odessa | 42 | $55.00 | $69.89 | $75.00 | +27.56% |
| Paris | 108 | $60.00 | $57.85 | $58.00 | -23.57% |
| Pharr | 145 | $45.00 | $51.10 | $55.00 | -14.53% |
| San Angelo | 17 | $115.50 | $86.00 | $60.00 | — |
| San Antonio | 54 | $50.60 | $41.00 | $50.90 | -52.72% |
| Tyler | 136 | $44.10 | $46.00 | $70.00 | -33.33% |
| Waco | 62 | $36.00 | $59.26 | $150.00 | -37.88% |
| Wichita Falls | 42 | $39.00 | $58.00 | $55.00 | +1.69% |
| Yoakum | 40 | $44.00 | $21.50 | $46.00 | -2.96% |
Related items
- 530-7006 · Driveways (Conc) ($106.00/SY)
- 529-7009 · Conc Curb & Gutter (TY II) ($30.00/LF)
- 531-7001 · Conc Sidewalks (4") ($65.00/SY)
- 533-7001 · Mill Rumble Strips (Asphalt) (Shldr) ($0.180/LF)
- 533-7002 · Mill Rumble Strips (Asph) (Centerline) ($0.200/LF)
- 540-7001 · MTL W-Beam GD FEN (TIM Post) ($25.75/LF)
- 540-7005 · MTL Beam GD FEN Trans (Thrie-Beam) ($2,208.14/EA)
- 540-7015 · Downstream Anchor Terminal Section ($1,485.00/EA)
Is your price for item 530-7010 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.