Driveways (Conc) (Item 530-7006): TxDOT Unit Price History

1,763 bids · 293 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure SY

TxDOT 530-7006 · DRIVEWAYS (CONC) · Unit: SY

Low bid
$100.00/SY
Quantity-weighted median of winning unit prices
Weighted median
$106.00/SY
Quantity-weighted median of every bid
Engineer’s estimate
$115.50/SY
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-4%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$100.00$150.00$200.00$250.00$300.001101001K10K100KQuantity (SY), log scaleUnit price ($/SY)
Winning (low) bid Other bid Fitted price curve (ln price = 5.35 − 0.082·ln qty, R² 0.14)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 530-7006 (Driveways (Conc)) is measured in SY. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,763 bids for it on 293 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 868 bids was $106.00 per SY, and the winning low bidders priced it at a weighted median of $100.00 per SY.

TxDOT's engineer's estimate for the same lines had a weighted median of $115.50 per SY, so winning bids came in 13.4% below the estimate.

By calendar year, the median bid moved from $125.00 in 2025 (905 bids) to $120.00 in 2026 (804 bids), down 4.0%. The middle half of 2026 bids fell between $100.00 and $150.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 4%.

Quantity matters for this item. Lines of 7 to 259 SY had a weighted median of $135.00, while lines above 1,240 SY had $110.00, a 19% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 288 lines where both a winning and a second-place bid were published, the median winning unit price was $120.00 against $121.62 from the second-lowest bidder, a median gap of 7.14% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 23 TxDOT districts with at least ten bids, El Paso had the lowest weighted median ($85.00) and Childress the highest ($150.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $89.00 per SY for 2,261 SY against an estimate of $95.00.

15 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 530-7010 Driveways (ACP) (weighted median $59.25 per SY); 529-7009 Conc Curb & Gutter (TY II) (weighted median $30.00 per LF); 531-7001 Conc Sidewalks (4") (weighted median $65.00 per SY); 533-7001 Mill Rumble Strips (Asphalt) (Shldr) (weighted median $0.180 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024549$132.50$120.00$130.00$118.50$179.28
2025905154$125.40$120.00$125.00$105.00$158.00
2026804131$111.82$104.51$120.00$100.00$150.00

Quantity bands

BandQuantity (SY)BidsWeighted avgWeighted median25th–75th pct
Small7–259588$154.42$135.00$119.00–$187.50
Medium263–1,237588$133.69$124.40$103.85–$150.00
Large1,240–24,863587$115.36$110.00$97.00–$129.57

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$120.00
Median second-low unit price
$121.62
Median engineer’s estimate
$120.00
Median gap, second vs. low
+7.14%

288 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 2,261 SY · Engineer’s estimate $95.00/SY

  • Unit price
    $89.00/SY
    Extension
    $201,229.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -6.3%
  • Unit price
    $85.00/SY
    Extension
    $192,185.00
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    -10.5%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $104.00/SY
    Extension
    $235,144.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    +9.5%
  • 4. Harper Brothers Construction LLC

    Unit price
    $104.00/SY
    Extension
    $235,144.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    +9.5%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 3,772 SY · Engineer’s estimate $105.00/SY

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $92.00/SY
    Extension
    $347,024.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -12.4%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $120.00/SY
    Extension
    $452,640.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +14.3%
  • Unit price
    $100.00/SY
    Extension
    $377,200.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -4.8%
  • Unit price
    $94.15/SY
    Extension
    $355,133.80
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -10.3%
  • 5. Sema Construction, Inc.

    Unit price
    $102.01/SY
    Extension
    $384,781.72
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -2.8%
  • 6. Zachry Construction Corporation

    Unit price
    $103.24/SY
    Extension
    $389,421.28
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -1.7%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 763 SY · Engineer’s estimate $100.00/SY

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $115.00/SY
    Extension
    $87,745.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +15%
  • Unit price
    $135.00/SY
    Extension
    $103,005.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    +35%
  • Unit price
    $145.60/SY
    Extension
    $111,092.80
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    +45.6%
  • Unit price
    $90.00/SY
    Extension
    $68,670.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    -10%
  • Unit price
    $164.69/SY
    Extension
    $125,658.47
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    +64.7%
  • Unit price
    $200.00/SY
    Extension
    $152,600.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    +100%
  • Unit price
    $180.00/SY
    Extension
    $137,340.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    +80%
  • Unit price
    $106.00/SY
    Extension
    $80,878.00
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +6%
  • 9. Zachry Construction Corporation

    Unit price
    $145.65/SY
    Extension
    $111,130.95
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +45.7%
  • 10. Brizo Construction, LLC

    Unit price
    $130.00/SY
    Extension
    $99,190.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +30%
  • Unit price
    $99.25/SY
    Extension
    $75,727.75
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -0.8%
  • Unit price
    $379.00/SY
    Extension
    $289,177.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +279%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas2,2614Mario Sinacola & Sons Excavating, Inc.$89.00$95.00
2026-11-040195-02-092DentonDallas3,7726Indus Road & Bridge, Inc.$92.00$105.00
2026-11-040212-03-058BrazosBryan76312Fluor Enterprises, Inc.$115.00$100.00
2026-11-040285-03-066HaysAustin1,0739Lone Star Sitework, LLC$111.00$125.00
2026-11-040947-03-034JasperBeaumont162Texas Materials Group, Inc.$194.70$100.00
2026-11-041017-03-040HuntParis7799Highway 19 Construction LLC$100.00$100.00
2026-11-030015-13-432TravisAustin12,0576Austin Bridge & Road Services, LP$90.53$125.00
2026-10-070200-01-093AngelinaLufkin1,4417Longview Bridge and Road, Ltd.$140.00$170.00
2026-10-070510-06-024FanninParis4226A. K. Gillis & Sons, LLC$95.00$100.00
2026-10-060009-11-248DallasDallas2,9697Ragle Construction, Inc.$76.00$106.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene41$133.00$133.00$130.00+4.03%
Amarillo41$102.75$110.00$120.00+6.86%
Atlanta50$85.00$116.00$108.00-21.86%
Austin147$90.53$109.16$125.00-1.82%
Beaumont50$115.00$115.00$120.00-8.94%
Brownwood28$122.56$142.46$127.00—
Bryan137$115.00$135.00$100.00+15.26%
Childress11$150.00$150.00$130.00—
Corpus Christi71$82.00$100.00$125.00-14.9%
Dallas191$92.00$94.15$105.00-12.57%
El Paso17$87.48$85.00$85.00—
Fort Worth94$85.00$100.00$115.50+8.1%
Houston51$132.00$94.74$110.00-24.81%
Laredo12$125.00$125.00$117.10—
Lubbock34$100.00$115.00$135.00-26.04%
Lufkin66$140.00$135.00$170.00-14.57%
Odessa62$130.64$116.00$125.00+22.31%
Paris131$107.00$109.00$102.00-4.35%
Pharr111$80.00$88.39$110.00-3%
San Angelo7$114.42$115.00$90.00—
San Antonio178$106.00$108.23$105.00-5.36%
Tyler30$105.00$100.00$90.00-6.98%
Waco6$102.00$111.35$105.00—
Wichita Falls42$110.00$123.56$125.00-2.51%
Yoakum155$100.00$110.00$95.00+0.56%

Related items

Is your price for item 530-7006 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.