MTL W-Beam GD FEN (TIM Post) (Item 540-7001): TxDOT Unit Price History
3,028 bids · 508 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF
TxDOT 540-7001 · MTL W-BEAM GD FEN (TIM POST) · Unit: LF
- Low bid
- $25.85/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $25.75/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $25.50/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -3.45%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 540-7001 (MTL W-Beam GD FEN (TIM Post)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 3,028 bids for it on 508 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,587 bids was $25.75 per LF, and the winning low bidders priced it at a weighted median of $25.85 per LF.
Winning unit prices sat close to TxDOT's own engineer's estimate ($25.50 per LF), within two percent.
By calendar year, the median bid moved from $28.75 in 2025 (1,474 bids) to $28.00 in 2026 (1,474 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $25.00 and $32.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 3.45%.
Quantity matters for this item. Lines of 10 to 325 LF had a weighted median of $30.00, while lines above 1,013 LF had $25.73, a 14% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 479 lines where both a winning and a second-place bid were published, the median winning unit price was $28.00 against $28.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 17 TxDOT districts with at least ten bids, Dallas had the lowest weighted median ($23.70) and El Paso the highest ($45.00). The busiest district for this item was Yoakum.
The most recent letting with this item was on Nov 4, 2026 in Haskell County, where Lone Star Paving Company was the low bidder at $28.00 per LF for 2,900 LF against an estimate of $30.00.
72 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 540-7005 MTL Beam GD FEN Trans (Thrie-Beam) (weighted median $2,208.14 per EA); 540-7015 Downstream Anchor Terminal Section (weighted median $1,485.00 per EA); 540-7002 MTL W-Beam GD FEN (Steel Post) (weighted median $31.00 per LF); 542-7001 Remove Metal Beam Guard Fence (weighted median $2.55 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 80 | 13 | $31.78 | $30.00 | $30.00 | $26.82 | $34.41 |
| 2025 | 1,474 | 260 | $27.51 | $27.50 | $28.75 | $25.00 | $33.00 |
| 2026 | 1,474 | 237 | $26.42 | $25.62 | $28.00 | $25.00 | $32.00 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 10–325 | 1,014 | $31.97 | $30.00 | $27.97–$35.80 |
| Medium | 331–1,012.5 | 1,007 | $29.40 | $28.00 | $25.49–$31.95 |
| Large | 1,013–38,705 | 1,007 | $26.35 | $25.73 | $24.00–$30.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $28.00
- Median second-low unit price
- $28.00
- Median engineer’s estimate
- $29.00
- Median gap, second vs. low
- +0%
479 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District
Line quantity 2,900 LF · Engineer’s estimate $30.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lone Star Paving CompanyLOW BID | $28.00/LF | $81,200.00 | — | -6.7% | $6,732,215 | $1,063,968 (15.8%) left on table |
| 2 | Rk Hall, LLC | $25.44/LF | $73,776.00 | -$7,424 | -15.2% | $7,796,183 | +$1,063,968 |
| 3 | Zack Burkett Co. | $30.55/LF | $88,595.00 | +$7,395 | +1.8% | $7,966,171 | +$1,233,956 |
| 4 | Foutsco Paving Company, LLC | $24.00/LF | $69,600.00 | -$11,600 | -20% | $8,000,580 | +$1,268,365 |
| 5 | Nobles Road Construction, Inc. | $29.40/LF | $85,260.00 | +$4,060 | -2% | $8,307,427 | +$1,575,212 |
| 6 | Ck Newberry, LLC | $30.00/LF | $87,000.00 | +$5,800 | 0% | $8,389,000 | +$1,656,785 |
| 7 | Reece Albert, Inc. | $34.18/LF | $99,122.00 | +$17,922 | +13.9% | $8,534,153 | +$1,801,938 |
| 8 | Texas Materials Group, Inc. | $28.00/LF | $81,200.00 | $0.000 | -6.7% | $8,617,318 | +$1,885,103 |
| 9 | A. L. Helmcamp, Inc. | $25.00/LF | $72,500.00 | -$8,700 | -16.7% | $9,257,856 | +$2,525,641 |
- LOW BID · WINNER
- Unit price
- $28.00/LF
- Extension
- $81,200.00
- Proposal total
- $6,732,215
- Money left on the table
- $1,063,968 (15.8%)
- vs. engineer’s estimate
- -6.7%
2. Rk Hall, LLC
- Unit price
- $25.44/LF
- Extension
- $73,776.00
- Proposal total
- $7,796,183
- vs. low bid
- +$1,063,968
- vs. engineer’s estimate
- -15.2%
- Unit price
- $30.55/LF
- Extension
- $88,595.00
- Proposal total
- $7,966,171
- vs. low bid
- +$1,233,956
- vs. engineer’s estimate
- +1.8%
- Unit price
- $24.00/LF
- Extension
- $69,600.00
- Proposal total
- $8,000,580
- vs. low bid
- +$1,268,365
- vs. engineer’s estimate
- -20%
5. Nobles Road Construction, Inc.
- Unit price
- $29.40/LF
- Extension
- $85,260.00
- Proposal total
- $8,307,427
- vs. low bid
- +$1,575,212
- vs. engineer’s estimate
- -2%
- Unit price
- $30.00/LF
- Extension
- $87,000.00
- Proposal total
- $8,389,000
- vs. low bid
- +$1,656,785
- vs. engineer’s estimate
- 0%
- Unit price
- $34.18/LF
- Extension
- $99,122.00
- Proposal total
- $8,534,153
- vs. low bid
- +$1,801,938
- vs. engineer’s estimate
- +13.9%
- Unit price
- $28.00/LF
- Extension
- $81,200.00
- Proposal total
- $8,617,318
- vs. low bid
- +$1,885,103
- vs. engineer’s estimate
- -6.7%
- Unit price
- $25.00/LF
- Extension
- $72,500.00
- Proposal total
- $9,257,856
- vs. low bid
- +$2,525,641
- vs. engineer’s estimate
- -16.7%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 1,012.5 LF · Engineer’s estimate $29.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $25.50/LF | $25,818.75 | — | -12.1% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $32.00/LF | $32,400.00 | +$6,581 | +10.3% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $25.80/LF | $26,122.50 | +$303.75 | -11% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $30.00/LF | $30,375.00 | +$4,556 | +3.4% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $24.00/LF | $24,300.00 | -$1,519 | -17.2% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $27.00/LF | $27,337.50 | +$1,519 | -6.9% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $26.00/LF | $26,325.00 | +$506.25 | -10.3% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $31.00/LF | $31,387.50 | +$5,569 | +6.9% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $28.60/LF | $28,957.50 | +$3,139 | -1.4% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $27.50/LF | $27,843.75 | +$2,025 | -5.2% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $24.00/LF | $24,300.00 | -$1,519 | -17.2% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $41.00/LF | $41,512.50 | +$15,694 | +41.4% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $25.50/LF
- Extension
- $25,818.75
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- -12.1%
- Unit price
- $32.00/LF
- Extension
- $32,400.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- +10.3%
- Unit price
- $25.80/LF
- Extension
- $26,122.50
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- -11%
- Unit price
- $30.00/LF
- Extension
- $30,375.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- +3.4%
- Unit price
- $24.00/LF
- Extension
- $24,300.00
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- -17.2%
- Unit price
- $27.00/LF
- Extension
- $27,337.50
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- -6.9%
- Unit price
- $26.00/LF
- Extension
- $26,325.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- -10.3%
- Unit price
- $31.00/LF
- Extension
- $31,387.50
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- +6.9%
9. Zachry Construction Corporation
- Unit price
- $28.60/LF
- Extension
- $28,957.50
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- -1.4%
10. Brizo Construction, LLC
- Unit price
- $27.50/LF
- Extension
- $27,843.75
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- -5.2%
- Unit price
- $24.00/LF
- Extension
- $24,300.00
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -17.2%
- Unit price
- $41.00/LF
- Extension
- $41,512.50
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +41.4%
Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District
Line quantity 600 LF · Engineer’s estimate $27.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Stx CivilLOW BID | $36.03/LF | $21,618.00 | — | +33.4% | $2,866,785 | $83,215 (2.9%) left on table |
| 2 | Delgado's Contractors, LLC | $30.00/LF | $18,000.00 | -$3,618 | +11.1% | $2,950,000 | +$83,215 |
| 3 | Acee Construction LLC. | $24.10/LF | $14,460.00 | -$7,158 | -10.7% | $3,033,273 | +$166,488 |
| 4 | James Construction Group, LLC | $29.80/LF | $17,880.00 | -$3,738 | +10.4% | $3,261,472 | +$394,687 |
| 5 | E-Z Bel Construction, LLC | $35.00/LF | $21,000.00 | -$618.00 | +29.6% | $3,270,969 | +$404,184 |
| 6 | Lucania Contractors LLC | $30.00/LF | $18,000.00 | -$3,618 | +11.1% | $3,466,015 | +$599,230 |
| 7 | Foremost Paving, Inc. | $30.00/LF | $18,000.00 | -$3,618 | +11.1% | $5,083,300 | +$2,216,516 |
1. Stx Civil
LOW BID · WINNER- Unit price
- $36.03/LF
- Extension
- $21,618.00
- Proposal total
- $2,866,785
- Money left on the table
- $83,215 (2.9%)
- vs. engineer’s estimate
- +33.4%
- Unit price
- $30.00/LF
- Extension
- $18,000.00
- Proposal total
- $2,950,000
- vs. low bid
- +$83,215
- vs. engineer’s estimate
- +11.1%
3. Acee Construction LLC.
- Unit price
- $24.10/LF
- Extension
- $14,460.00
- Proposal total
- $3,033,273
- vs. low bid
- +$166,488
- vs. engineer’s estimate
- -10.7%
- Unit price
- $29.80/LF
- Extension
- $17,880.00
- Proposal total
- $3,261,472
- vs. low bid
- +$394,687
- vs. engineer’s estimate
- +10.4%
- Unit price
- $35.00/LF
- Extension
- $21,000.00
- Proposal total
- $3,270,969
- vs. low bid
- +$404,184
- vs. engineer’s estimate
- +29.6%
- Unit price
- $30.00/LF
- Extension
- $18,000.00
- Proposal total
- $3,466,015
- vs. low bid
- +$599,230
- vs. engineer’s estimate
- +11.1%
- Unit price
- $30.00/LF
- Extension
- $18,000.00
- Proposal total
- $5,083,300
- vs. low bid
- +$2,216,516
- vs. engineer’s estimate
- +11.1%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 2,900 | 9 | Lone Star Paving Company | $28.00 | $30.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 1,012.5 | 12 | Fluor Enterprises, Inc. | $25.50 | $29.00 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 600 | 7 | Stx Civil | $36.03 | $27.00 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 575 | 2 | Texas Materials Group, Inc. | $29.70 | $28.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 1,647 | 6 | Austin Bridge & Road Services, LP | $24.00 | $24.06 |
| 2026-11-03 | 0220-01-038 | Hidalgo | Pharr | 2,675 | 2 | Foremost Paving, Inc. | $30.30 | $26.50 |
| 2026-11-03 | 0917-30-068 | Burleson | Bryan | 300 | 15 | C & W Southern LLC | $26.25 | $29.00 |
| 2026-10-28 | 6507-80-001 | Angelina | Lufkin | 1,000 | 8 | Blacksmith Ventures LLC | $30.00 | $30.00 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 362.5 | 8 | Hunter Industries, Ltd. | $27.99 | $27.00 |
| 2026-10-07 | 0200-01-093 | Angelina | Lufkin | 1,450 | 7 | Longview Bridge and Road, Ltd. | $27.00 | $34.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 166 | $24.75 | $26.00 | $25.50 | -6.67% |
| Atlanta | 134 | $23.50 | $24.20 | $27.00 | -10.71% |
| Austin | 236 | $25.50 | $27.00 | $25.00 | +3.95% |
| Beaumont | 145 | $28.00 | $28.00 | $28.00 | -3.33% |
| Brownwood | 4 | — | $31.82 | — | — |
| Bryan | 201 | $28.00 | $27.30 | $28.00 | -5.25% |
| Childress | 2 | $45.00 | $47.50 | $35.00 | — |
| Corpus Christi | 114 | $27.28 | $26.02 | $12.50 | +8.03% |
| Dallas | 331 | $23.60 | $23.70 | $25.25 | -3.85% |
| El Paso | 28 | $30.00 | $45.00 | $120.00 | — |
| Fort Worth | 296 | $22.50 | $24.05 | $25.00 | -9.29% |
| Houston | 299 | $27.00 | $28.00 | $26.00 | 0% |
| Laredo | 94 | $27.25 | $28.00 | $27.00 | +4.75% |
| Lubbock | 5 | $29.60 | $30.50 | $40.00 | — |
| Lufkin | 144 | $27.00 | $26.60 | $30.00 | -3.43% |
| Paris | 3 | $28.00 | $28.00 | $29.15 | — |
| Pharr | 113 | $25.85 | $28.44 | $30.00 | +0.86% |
| San Angelo | 6 | $27.75 | $29.92 | $45.00 | — |
| San Antonio | 241 | $25.50 | $24.25 | $24.54 | 0% |
| Tyler | 19 | $40.00 | $40.00 | $30.00 | — |
| Wichita Falls | 111 | $25.20 | $26.36 | $25.00 | -3.57% |
| Yoakum | 336 | $28.00 | $28.92 | $30.00 | -2.87% |
Related items
- 540-7005 · MTL Beam GD FEN Trans (Thrie-Beam) ($2,208.14/EA)
- 540-7015 · Downstream Anchor Terminal Section ($1,485.00/EA)
- 540-7002 · MTL W-Beam GD FEN (Steel Post) ($31.00/LF)
- 542-7001 · Remove Metal Beam Guard Fence ($2.55/LF)
- 542-7002 · Remove Terminal Anchor Section ($250.00/EA)
- 544-7001 · Guardrail END Treatment (Install) ($3,375.90/EA)
- 544-7003 · Guardrail END Treatment (Remove) ($255.00/EA)
- 545-7004 · Crash Cush Atten (Remove) ($895.48/EA)