MTL W-Beam GD FEN (TIM Post) (Item 540-7001): TxDOT Unit Price History

3,028 bids · 508 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 540-7001 · MTL W-BEAM GD FEN (TIM POST) · Unit: LF

Low bid
$25.85/LF
Quantity-weighted median of winning unit prices
Weighted median
$25.75/LF
Quantity-weighted median of every bid
Engineer’s estimate
$25.50/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-3.45%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$20.00$30.00$40.00$50.00101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 3.80 − 0.066·ln qty, R² 0.17)320 plotted bids, 3 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 540-7001 (MTL W-Beam GD FEN (TIM Post)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 3,028 bids for it on 508 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,587 bids was $25.75 per LF, and the winning low bidders priced it at a weighted median of $25.85 per LF.

Winning unit prices sat close to TxDOT's own engineer's estimate ($25.50 per LF), within two percent.

By calendar year, the median bid moved from $28.75 in 2025 (1,474 bids) to $28.00 in 2026 (1,474 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $25.00 and $32.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 3.45%.

Quantity matters for this item. Lines of 10 to 325 LF had a weighted median of $30.00, while lines above 1,013 LF had $25.73, a 14% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 479 lines where both a winning and a second-place bid were published, the median winning unit price was $28.00 against $28.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 17 TxDOT districts with at least ten bids, Dallas had the lowest weighted median ($23.70) and El Paso the highest ($45.00). The busiest district for this item was Yoakum.

The most recent letting with this item was on Nov 4, 2026 in Haskell County, where Lone Star Paving Company was the low bidder at $28.00 per LF for 2,900 LF against an estimate of $30.00.

72 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 540-7005 MTL Beam GD FEN Trans (Thrie-Beam) (weighted median $2,208.14 per EA); 540-7015 Downstream Anchor Terminal Section (weighted median $1,485.00 per EA); 540-7002 MTL W-Beam GD FEN (Steel Post) (weighted median $31.00 per LF); 542-7001 Remove Metal Beam Guard Fence (weighted median $2.55 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20248013$31.78$30.00$30.00$26.82$34.41
20251,474260$27.51$27.50$28.75$25.00$33.00
20261,474237$26.42$25.62$28.00$25.00$32.00

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small10–3251,014$31.97$30.00$27.97–$35.80
Medium331–1,012.51,007$29.40$28.00$25.49–$31.95
Large1,013–38,7051,007$26.35$25.73$24.00–$30.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$28.00
Median second-low unit price
$28.00
Median engineer’s estimate
$29.00
Median gap, second vs. low
+0%

479 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District

Line quantity 2,900 LF · Engineer’s estimate $30.00/LF

  • 1. Lone Star Paving Company

    LOW BID · WINNER
    Unit price
    $28.00/LF
    Extension
    $81,200.00
    Proposal total
    $6,732,215
    Money left on the table
    $1,063,968 (15.8%)
    vs. engineer’s estimate
    -6.7%
  • Unit price
    $25.44/LF
    Extension
    $73,776.00
    Proposal total
    $7,796,183
    vs. low bid
    +$1,063,968
    vs. engineer’s estimate
    -15.2%
  • Unit price
    $30.55/LF
    Extension
    $88,595.00
    Proposal total
    $7,966,171
    vs. low bid
    +$1,233,956
    vs. engineer’s estimate
    +1.8%
  • Unit price
    $24.00/LF
    Extension
    $69,600.00
    Proposal total
    $8,000,580
    vs. low bid
    +$1,268,365
    vs. engineer’s estimate
    -20%
  • 5. Nobles Road Construction, Inc.

    Unit price
    $29.40/LF
    Extension
    $85,260.00
    Proposal total
    $8,307,427
    vs. low bid
    +$1,575,212
    vs. engineer’s estimate
    -2%
  • Unit price
    $30.00/LF
    Extension
    $87,000.00
    Proposal total
    $8,389,000
    vs. low bid
    +$1,656,785
    vs. engineer’s estimate
    0%
  • Unit price
    $34.18/LF
    Extension
    $99,122.00
    Proposal total
    $8,534,153
    vs. low bid
    +$1,801,938
    vs. engineer’s estimate
    +13.9%
  • Unit price
    $28.00/LF
    Extension
    $81,200.00
    Proposal total
    $8,617,318
    vs. low bid
    +$1,885,103
    vs. engineer’s estimate
    -6.7%
  • Unit price
    $25.00/LF
    Extension
    $72,500.00
    Proposal total
    $9,257,856
    vs. low bid
    +$2,525,641
    vs. engineer’s estimate
    -16.7%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 1,012.5 LF · Engineer’s estimate $29.00/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $25.50/LF
    Extension
    $25,818.75
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    -12.1%
  • Unit price
    $32.00/LF
    Extension
    $32,400.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    +10.3%
  • Unit price
    $25.80/LF
    Extension
    $26,122.50
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -11%
  • Unit price
    $30.00/LF
    Extension
    $30,375.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +3.4%
  • Unit price
    $24.00/LF
    Extension
    $24,300.00
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -17.2%
  • Unit price
    $27.00/LF
    Extension
    $27,337.50
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -6.9%
  • Unit price
    $26.00/LF
    Extension
    $26,325.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -10.3%
  • Unit price
    $31.00/LF
    Extension
    $31,387.50
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +6.9%
  • 9. Zachry Construction Corporation

    Unit price
    $28.60/LF
    Extension
    $28,957.50
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    -1.4%
  • 10. Brizo Construction, LLC

    Unit price
    $27.50/LF
    Extension
    $27,843.75
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    -5.2%
  • Unit price
    $24.00/LF
    Extension
    $24,300.00
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -17.2%
  • Unit price
    $41.00/LF
    Extension
    $41,512.50
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +41.4%

Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District

Line quantity 600 LF · Engineer’s estimate $27.00/LF

  • 1. Stx Civil

    LOW BID · WINNER
    Unit price
    $36.03/LF
    Extension
    $21,618.00
    Proposal total
    $2,866,785
    Money left on the table
    $83,215 (2.9%)
    vs. engineer’s estimate
    +33.4%
  • Unit price
    $30.00/LF
    Extension
    $18,000.00
    Proposal total
    $2,950,000
    vs. low bid
    +$83,215
    vs. engineer’s estimate
    +11.1%
  • 3. Acee Construction LLC.

    Unit price
    $24.10/LF
    Extension
    $14,460.00
    Proposal total
    $3,033,273
    vs. low bid
    +$166,488
    vs. engineer’s estimate
    -10.7%
  • Unit price
    $29.80/LF
    Extension
    $17,880.00
    Proposal total
    $3,261,472
    vs. low bid
    +$394,687
    vs. engineer’s estimate
    +10.4%
  • Unit price
    $35.00/LF
    Extension
    $21,000.00
    Proposal total
    $3,270,969
    vs. low bid
    +$404,184
    vs. engineer’s estimate
    +29.6%
  • Unit price
    $30.00/LF
    Extension
    $18,000.00
    Proposal total
    $3,466,015
    vs. low bid
    +$599,230
    vs. engineer’s estimate
    +11.1%
  • Unit price
    $30.00/LF
    Extension
    $18,000.00
    Proposal total
    $5,083,300
    vs. low bid
    +$2,216,516
    vs. engineer’s estimate
    +11.1%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040157-04-058HaskellAbilene2,9009Lone Star Paving Company$28.00$30.00
2026-11-040212-03-058BrazosBryan1,012.512Fluor Enterprises, Inc.$25.50$29.00
2026-11-040922-33-234WebbLaredo6007Stx Civil$36.03$27.00
2026-11-040947-03-034JasperBeaumont5752Texas Materials Group, Inc.$29.70$28.00
2026-11-030015-13-432TravisAustin1,6476Austin Bridge & Road Services, LP$24.00$24.06
2026-11-030220-01-038HidalgoPharr2,6752Foremost Paving, Inc.$30.30$26.50
2026-11-030917-30-068BurlesonBryan30015C & W Southern LLC$26.25$29.00
2026-10-286507-80-001AngelinaLufkin1,0008Blacksmith Ventures LLC$30.00$30.00
2026-10-070143-03-049WilsonSan Antonio362.58Hunter Industries, Ltd.$27.99$27.00
2026-10-070200-01-093AngelinaLufkin1,4507Longview Bridge and Road, Ltd.$27.00$34.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene166$24.75$26.00$25.50-6.67%
Atlanta134$23.50$24.20$27.00-10.71%
Austin236$25.50$27.00$25.00+3.95%
Beaumont145$28.00$28.00$28.00-3.33%
Brownwood4—$31.82——
Bryan201$28.00$27.30$28.00-5.25%
Childress2$45.00$47.50$35.00—
Corpus Christi114$27.28$26.02$12.50+8.03%
Dallas331$23.60$23.70$25.25-3.85%
El Paso28$30.00$45.00$120.00—
Fort Worth296$22.50$24.05$25.00-9.29%
Houston299$27.00$28.00$26.000%
Laredo94$27.25$28.00$27.00+4.75%
Lubbock5$29.60$30.50$40.00—
Lufkin144$27.00$26.60$30.00-3.43%
Paris3$28.00$28.00$29.15—
Pharr113$25.85$28.44$30.00+0.86%
San Angelo6$27.75$29.92$45.00—
San Antonio241$25.50$24.25$24.540%
Tyler19$40.00$40.00$30.00—
Wichita Falls111$25.20$26.36$25.00-3.57%
Yoakum336$28.00$28.92$30.00-2.87%

Related items