Remove Metal Beam Guard Fence (Item 542-7001): TxDOT Unit Price History

3,118 bids · 540 bid lines · Nov 6, 2024 to Nov 19, 2026 · unit of measure LF

TxDOT 542-7001 · REMOVE METAL BEAM GUARD FENCE · Unit: LF

Low bid
$2.50/LF
Quantity-weighted median of winning unit prices
Weighted median
$2.55/LF
Quantity-weighted median of every bid
Engineer’s estimate
$3.00/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-9.09%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$5.00$10.00$15.00101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 1.60 − 0.063·ln qty, R² 0.02)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 19, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 542-7001 (Remove Metal Beam Guard Fence) is measured in LF. Between Nov 6, 2024 and Nov 19, 2026, contractors entered 3,118 bids for it on 540 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,617 bids was $2.55 per LF, and the winning low bidders priced it at a weighted median of $2.50 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $3.00 per LF, so winning bids came in 16.7% below the estimate.

By calendar year, the median bid moved from $3.25 in 2025 (1,509 bids) to $3.00 in 2026 (1,483 bids), down 7.7%. The middle half of 2026 bids fell between $2.24 and $4.50.

Comparing the last 12 months with the 12 months before, the median unit price fell 9.09%.

Quantity matters for this item. Lines of 12.5 to 430 LF had a weighted median of $3.60, while lines above 1,475 LF had $2.68, a 26% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 509 lines where both a winning and a second-place bid were published, the median winning unit price was $3.00 against $3.07 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Abilene had the lowest weighted median ($2.00) and San Angelo the highest ($4.50). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 19, 2026 in Lamar County, where Austin Barricade Company, L.L.C. was the low bidder at $1.00 per LF for 1,500 LF against an estimate of $3.00.

73 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 542-7002 Remove Terminal Anchor Section (weighted median $250.00 per EA); 544-7001 Guardrail END Treatment (Install) (weighted median $3,375.90 per EA); 540-7001 MTL W-Beam GD FEN (TIM Post) (weighted median $25.75 per LF); 540-7005 MTL Beam GD FEN Trans (Thrie-Beam) (weighted median $2,208.14 per EA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
202412619$3.17$2.86$3.20$2.50$5.19
20251,509279$3.62$3.00$3.25$2.60$5.00
20261,483245$3.07$2.50$3.00$2.24$4.50

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small12.5–4301,040$5.18$3.60$3.00–$6.00
Medium434–1,4631,040$4.04$3.00$2.50–$5.00
Large1,475–42,321.881,038$3.14$2.68$2.15–$3.50

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$3.00
Median second-low unit price
$3.07
Median engineer’s estimate
$4.00
Median gap, second vs. low
+0%

509 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District

Line quantity 1,750 LF · Engineer’s estimate $3.00/LF

  • 1. Lone Star Paving Company

    LOW BID · WINNER
    Unit price
    $1.00/LF
    Extension
    $1,750.00
    Proposal total
    $6,732,215
    Money left on the table
    $1,063,968 (15.8%)
    vs. engineer’s estimate
    -66.7%
  • Unit price
    $3.18/LF
    Extension
    $5,565.00
    Proposal total
    $7,796,183
    vs. low bid
    +$1,063,968
    vs. engineer’s estimate
    +6%
  • Unit price
    $1.10/LF
    Extension
    $1,925.00
    Proposal total
    $7,966,171
    vs. low bid
    +$1,233,956
    vs. engineer’s estimate
    -63.3%
  • Unit price
    $3.00/LF
    Extension
    $5,250.00
    Proposal total
    $8,000,580
    vs. low bid
    +$1,268,365
    vs. engineer’s estimate
    0%
  • 5. Nobles Road Construction, Inc.

    Unit price
    $1.05/LF
    Extension
    $1,837.50
    Proposal total
    $8,307,427
    vs. low bid
    +$1,575,212
    vs. engineer’s estimate
    -65%
  • Unit price
    $1.00/LF
    Extension
    $1,750.00
    Proposal total
    $8,389,000
    vs. low bid
    +$1,656,785
    vs. engineer’s estimate
    -66.7%
  • Unit price
    $1.22/LF
    Extension
    $2,135.00
    Proposal total
    $8,534,153
    vs. low bid
    +$1,801,938
    vs. engineer’s estimate
    -59.3%
  • Unit price
    $1.00/LF
    Extension
    $1,750.00
    Proposal total
    $8,617,318
    vs. low bid
    +$1,885,103
    vs. engineer’s estimate
    -66.7%
  • Unit price
    $3.20/LF
    Extension
    $5,600.00
    Proposal total
    $9,257,856
    vs. low bid
    +$2,525,641
    vs. engineer’s estimate
    +6.7%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 3,875 LF · Engineer’s estimate $4.00/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $3.00/LF
    Extension
    $11,625.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -25%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $2.65/LF
    Extension
    $10,268.75
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -33.8%
  • Unit price
    $2.75/LF
    Extension
    $10,656.25
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -31.3%
  • Unit price
    $2.55/LF
    Extension
    $9,881.25
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -36.3%
  • 5. Sema Construction, Inc.

    Unit price
    $2.00/LF
    Extension
    $7,750.00
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -50%
  • 6. Zachry Construction Corporation

    Unit price
    $2.08/LF
    Extension
    $8,060.00
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -48%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 3,997.5 LF · Engineer’s estimate $3.00/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $2.10/LF
    Extension
    $8,394.75
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    -30%
  • Unit price
    $3.00/LF
    Extension
    $11,992.50
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    0%
  • Unit price
    $2.15/LF
    Extension
    $8,594.63
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -28.3%
  • Unit price
    $3.00/LF
    Extension
    $11,992.50
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    0%
  • Unit price
    $2.50/LF
    Extension
    $9,993.75
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -16.7%
  • Unit price
    $3.00/LF
    Extension
    $11,992.50
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    0%
  • Unit price
    $2.20/LF
    Extension
    $8,794.50
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -26.7%
  • Unit price
    $3.15/LF
    Extension
    $12,592.13
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +5%
  • 9. Zachry Construction Corporation

    Unit price
    $3.24/LF
    Extension
    $12,951.90
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +8%
  • 10. Brizo Construction, LLC

    Unit price
    $3.30/LF
    Extension
    $13,191.75
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +10%
  • Unit price
    $2.50/LF
    Extension
    $9,993.75
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -16.7%
  • Unit price
    $3.17/LF
    Extension
    $12,672.08
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +5.7%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-196510-23-001LamarParis1,5002Austin Barricade Company, L.L.C.$1.00$3.00
2026-11-040157-04-058HaskellAbilene1,7509Lone Star Paving Company$1.00$3.00
2026-11-040195-02-092DentonDallas3,8756Indus Road & Bridge, Inc.$3.00$4.00
2026-11-040212-03-058BrazosBryan3,997.512Fluor Enterprises, Inc.$2.10$3.00
2026-11-040262-01-034MilamBryan4007Big Creek Construction, Ltd.$5.00$3.50
2026-11-040922-33-234WebbLaredo7287Stx Civil$3.63$3.50
2026-11-041017-03-040HuntParis3009Highway 19 Construction LLC$3.00$2.00
2026-11-030015-13-432TravisAustin10,175.56Austin Bridge & Road Services, LP$2.00$2.00
2026-11-030022-03-032TerrellOdessa1007The Truesdell Corporation$4.00$7.60
2026-11-030220-01-038HidalgoPharr2,6752Foremost Paving, Inc.$4.04$3.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene121$2.00$2.00$2.70-26.67%
Amarillo107$1.05$3.00$4.00-38.2%
Atlanta102$3.00$2.20$2.96-23.66%
Austin216$2.00$2.50$2.00-10.71%
Beaumont104$3.00$4.00$3.00-0.44%
Brownwood62$4.00$3.30$4.00+10%
Bryan128$2.10$3.00$4.00-36.6%
Childress70$2.20$2.20$3.300%
Corpus Christi81$3.00$3.18$2.40-6.25%
Dallas331$2.75$2.64$3.00-8.33%
El Paso48$2.00$2.00$2.30-23.4%
Fort Worth218$2.00$2.50$3.00-2.67%
Houston286$3.75$3.75$3.50+11.89%
Laredo75$2.68$2.59$2.85-11.5%
Lubbock60$3.00$3.00$20.00-14.89%
Lufkin116$2.00$2.20$3.000%
Odessa65$1.25$3.18$3.68-30%
Paris139$2.10$2.14$2.30-12%
Pharr85$4.04$4.00$3.00+8.65%
San Angelo45$2.00$4.50$4.00-6.61%
San Antonio222$2.50$2.60$3.41-6.67%
Tyler119$2.60$2.23$5.00-15%
Waco89$3.00$2.80$4.00-3.51%
Wichita Falls90$2.10$2.50$3.00-10.45%
Yoakum139$3.25$3.25$3.00+15.5%

Related items

Is your price for item 542-7001 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.