Remove Metal Beam Guard Fence (Item 542-7001): TxDOT Unit Price History
3,118 bids · 540 bid lines · Nov 6, 2024 to Nov 19, 2026 · unit of measure LF
TxDOT 542-7001 · REMOVE METAL BEAM GUARD FENCE · Unit: LF
- Low bid
- $2.50/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $2.55/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $3.00/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -9.09%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 19, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 542-7001 (Remove Metal Beam Guard Fence) is measured in LF. Between Nov 6, 2024 and Nov 19, 2026, contractors entered 3,118 bids for it on 540 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,617 bids was $2.55 per LF, and the winning low bidders priced it at a weighted median of $2.50 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $3.00 per LF, so winning bids came in 16.7% below the estimate.
By calendar year, the median bid moved from $3.25 in 2025 (1,509 bids) to $3.00 in 2026 (1,483 bids), down 7.7%. The middle half of 2026 bids fell between $2.24 and $4.50.
Comparing the last 12 months with the 12 months before, the median unit price fell 9.09%.
Quantity matters for this item. Lines of 12.5 to 430 LF had a weighted median of $3.60, while lines above 1,475 LF had $2.68, a 26% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 509 lines where both a winning and a second-place bid were published, the median winning unit price was $3.00 against $3.07 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Abilene had the lowest weighted median ($2.00) and San Angelo the highest ($4.50). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 19, 2026 in Lamar County, where Austin Barricade Company, L.L.C. was the low bidder at $1.00 per LF for 1,500 LF against an estimate of $3.00.
73 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 542-7002 Remove Terminal Anchor Section (weighted median $250.00 per EA); 544-7001 Guardrail END Treatment (Install) (weighted median $3,375.90 per EA); 540-7001 MTL W-Beam GD FEN (TIM Post) (weighted median $25.75 per LF); 540-7005 MTL Beam GD FEN Trans (Thrie-Beam) (weighted median $2,208.14 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 126 | 19 | $3.17 | $2.86 | $3.20 | $2.50 | $5.19 |
| 2025 | 1,509 | 279 | $3.62 | $3.00 | $3.25 | $2.60 | $5.00 |
| 2026 | 1,483 | 245 | $3.07 | $2.50 | $3.00 | $2.24 | $4.50 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 12.5–430 | 1,040 | $5.18 | $3.60 | $3.00–$6.00 |
| Medium | 434–1,463 | 1,040 | $4.04 | $3.00 | $2.50–$5.00 |
| Large | 1,475–42,321.88 | 1,038 | $3.14 | $2.68 | $2.15–$3.50 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $3.00
- Median second-low unit price
- $3.07
- Median engineer’s estimate
- $4.00
- Median gap, second vs. low
- +0%
509 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District
Line quantity 1,750 LF · Engineer’s estimate $3.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lone Star Paving CompanyLOW BID | $1.00/LF | $1,750.00 | — | -66.7% | $6,732,215 | $1,063,968 (15.8%) left on table |
| 2 | Rk Hall, LLC | $3.18/LF | $5,565.00 | +$3,815 | +6% | $7,796,183 | +$1,063,968 |
| 3 | Zack Burkett Co. | $1.10/LF | $1,925.00 | +$175.00 | -63.3% | $7,966,171 | +$1,233,956 |
| 4 | Foutsco Paving Company, LLC | $3.00/LF | $5,250.00 | +$3,500 | 0% | $8,000,580 | +$1,268,365 |
| 5 | Nobles Road Construction, Inc. | $1.05/LF | $1,837.50 | +$87.50 | -65% | $8,307,427 | +$1,575,212 |
| 6 | Ck Newberry, LLC | $1.00/LF | $1,750.00 | $0.000 | -66.7% | $8,389,000 | +$1,656,785 |
| 7 | Reece Albert, Inc. | $1.22/LF | $2,135.00 | +$385.00 | -59.3% | $8,534,153 | +$1,801,938 |
| 8 | Texas Materials Group, Inc. | $1.00/LF | $1,750.00 | $0.000 | -66.7% | $8,617,318 | +$1,885,103 |
| 9 | A. L. Helmcamp, Inc. | $3.20/LF | $5,600.00 | +$3,850 | +6.7% | $9,257,856 | +$2,525,641 |
- LOW BID · WINNER
- Unit price
- $1.00/LF
- Extension
- $1,750.00
- Proposal total
- $6,732,215
- Money left on the table
- $1,063,968 (15.8%)
- vs. engineer’s estimate
- -66.7%
2. Rk Hall, LLC
- Unit price
- $3.18/LF
- Extension
- $5,565.00
- Proposal total
- $7,796,183
- vs. low bid
- +$1,063,968
- vs. engineer’s estimate
- +6%
- Unit price
- $1.10/LF
- Extension
- $1,925.00
- Proposal total
- $7,966,171
- vs. low bid
- +$1,233,956
- vs. engineer’s estimate
- -63.3%
- Unit price
- $3.00/LF
- Extension
- $5,250.00
- Proposal total
- $8,000,580
- vs. low bid
- +$1,268,365
- vs. engineer’s estimate
- 0%
5. Nobles Road Construction, Inc.
- Unit price
- $1.05/LF
- Extension
- $1,837.50
- Proposal total
- $8,307,427
- vs. low bid
- +$1,575,212
- vs. engineer’s estimate
- -65%
- Unit price
- $1.00/LF
- Extension
- $1,750.00
- Proposal total
- $8,389,000
- vs. low bid
- +$1,656,785
- vs. engineer’s estimate
- -66.7%
- Unit price
- $1.22/LF
- Extension
- $2,135.00
- Proposal total
- $8,534,153
- vs. low bid
- +$1,801,938
- vs. engineer’s estimate
- -59.3%
- Unit price
- $1.00/LF
- Extension
- $1,750.00
- Proposal total
- $8,617,318
- vs. low bid
- +$1,885,103
- vs. engineer’s estimate
- -66.7%
- Unit price
- $3.20/LF
- Extension
- $5,600.00
- Proposal total
- $9,257,856
- vs. low bid
- +$2,525,641
- vs. engineer’s estimate
- +6.7%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 3,875 LF · Engineer’s estimate $4.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $3.00/LF | $11,625.00 | — | -25% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $2.65/LF | $10,268.75 | -$1,356 | -33.8% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $2.75/LF | $10,656.25 | -$968.75 | -31.3% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $2.55/LF | $9,881.25 | -$1,744 | -36.3% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $2.00/LF | $7,750.00 | -$3,875 | -50% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $2.08/LF | $8,060.00 | -$3,565 | -48% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $3.00/LF
- Extension
- $11,625.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -25%
2. Rpm Xconstruction, LLC
- Unit price
- $2.65/LF
- Extension
- $10,268.75
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -33.8%
- Unit price
- $2.75/LF
- Extension
- $10,656.25
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -31.3%
4. Webber, LLC
- Unit price
- $2.55/LF
- Extension
- $9,881.25
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -36.3%
5. Sema Construction, Inc.
- Unit price
- $2.00/LF
- Extension
- $7,750.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -50%
6. Zachry Construction Corporation
- Unit price
- $2.08/LF
- Extension
- $8,060.00
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -48%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 3,997.5 LF · Engineer’s estimate $3.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $2.10/LF | $8,394.75 | — | -30% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $3.00/LF | $11,992.50 | +$3,598 | 0% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $2.15/LF | $8,594.63 | +$199.88 | -28.3% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $3.00/LF | $11,992.50 | +$3,598 | 0% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $2.50/LF | $9,993.75 | +$1,599 | -16.7% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $3.00/LF | $11,992.50 | +$3,598 | 0% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $2.20/LF | $8,794.50 | +$399.75 | -26.7% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $3.15/LF | $12,592.13 | +$4,197 | +5% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $3.24/LF | $12,951.90 | +$4,557 | +8% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $3.30/LF | $13,191.75 | +$4,797 | +10% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $2.50/LF | $9,993.75 | +$1,599 | -16.7% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $3.17/LF | $12,672.08 | +$4,277 | +5.7% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $2.10/LF
- Extension
- $8,394.75
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- -30%
- Unit price
- $3.00/LF
- Extension
- $11,992.50
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- 0%
- Unit price
- $2.15/LF
- Extension
- $8,594.63
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- -28.3%
- Unit price
- $3.00/LF
- Extension
- $11,992.50
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- 0%
- Unit price
- $2.50/LF
- Extension
- $9,993.75
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- -16.7%
- Unit price
- $3.00/LF
- Extension
- $11,992.50
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- 0%
- Unit price
- $2.20/LF
- Extension
- $8,794.50
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- -26.7%
- Unit price
- $3.15/LF
- Extension
- $12,592.13
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- +5%
9. Zachry Construction Corporation
- Unit price
- $3.24/LF
- Extension
- $12,951.90
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- +8%
10. Brizo Construction, LLC
- Unit price
- $3.30/LF
- Extension
- $13,191.75
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +10%
- Unit price
- $2.50/LF
- Extension
- $9,993.75
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -16.7%
- Unit price
- $3.17/LF
- Extension
- $12,672.08
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +5.7%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-19 | 6510-23-001 | Lamar | Paris | 1,500 | 2 | Austin Barricade Company, L.L.C. | $1.00 | $3.00 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 1,750 | 9 | Lone Star Paving Company | $1.00 | $3.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 3,875 | 6 | Indus Road & Bridge, Inc. | $3.00 | $4.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 3,997.5 | 12 | Fluor Enterprises, Inc. | $2.10 | $3.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 400 | 7 | Big Creek Construction, Ltd. | $5.00 | $3.50 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 728 | 7 | Stx Civil | $3.63 | $3.50 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 300 | 9 | Highway 19 Construction LLC | $3.00 | $2.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 10,175.5 | 6 | Austin Bridge & Road Services, LP | $2.00 | $2.00 |
| 2026-11-03 | 0022-03-032 | Terrell | Odessa | 100 | 7 | The Truesdell Corporation | $4.00 | $7.60 |
| 2026-11-03 | 0220-01-038 | Hidalgo | Pharr | 2,675 | 2 | Foremost Paving, Inc. | $4.04 | $3.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 121 | $2.00 | $2.00 | $2.70 | -26.67% |
| Amarillo | 107 | $1.05 | $3.00 | $4.00 | -38.2% |
| Atlanta | 102 | $3.00 | $2.20 | $2.96 | -23.66% |
| Austin | 216 | $2.00 | $2.50 | $2.00 | -10.71% |
| Beaumont | 104 | $3.00 | $4.00 | $3.00 | -0.44% |
| Brownwood | 62 | $4.00 | $3.30 | $4.00 | +10% |
| Bryan | 128 | $2.10 | $3.00 | $4.00 | -36.6% |
| Childress | 70 | $2.20 | $2.20 | $3.30 | 0% |
| Corpus Christi | 81 | $3.00 | $3.18 | $2.40 | -6.25% |
| Dallas | 331 | $2.75 | $2.64 | $3.00 | -8.33% |
| El Paso | 48 | $2.00 | $2.00 | $2.30 | -23.4% |
| Fort Worth | 218 | $2.00 | $2.50 | $3.00 | -2.67% |
| Houston | 286 | $3.75 | $3.75 | $3.50 | +11.89% |
| Laredo | 75 | $2.68 | $2.59 | $2.85 | -11.5% |
| Lubbock | 60 | $3.00 | $3.00 | $20.00 | -14.89% |
| Lufkin | 116 | $2.00 | $2.20 | $3.00 | 0% |
| Odessa | 65 | $1.25 | $3.18 | $3.68 | -30% |
| Paris | 139 | $2.10 | $2.14 | $2.30 | -12% |
| Pharr | 85 | $4.04 | $4.00 | $3.00 | +8.65% |
| San Angelo | 45 | $2.00 | $4.50 | $4.00 | -6.61% |
| San Antonio | 222 | $2.50 | $2.60 | $3.41 | -6.67% |
| Tyler | 119 | $2.60 | $2.23 | $5.00 | -15% |
| Waco | 89 | $3.00 | $2.80 | $4.00 | -3.51% |
| Wichita Falls | 90 | $2.10 | $2.50 | $3.00 | -10.45% |
| Yoakum | 139 | $3.25 | $3.25 | $3.00 | +15.5% |
Related items
- 542-7002 · Remove Terminal Anchor Section ($250.00/EA)
- 544-7001 · Guardrail END Treatment (Install) ($3,375.90/EA)
- 540-7001 · MTL W-Beam GD FEN (TIM Post) ($25.75/LF)
- 540-7005 · MTL Beam GD FEN Trans (Thrie-Beam) ($2,208.14/EA)
- 544-7003 · Guardrail END Treatment (Remove) ($255.00/EA)
- 540-7015 · Downstream Anchor Terminal Section ($1,485.00/EA)
- 540-7002 · MTL W-Beam GD FEN (Steel Post) ($31.00/LF)
- 545-7004 · Crash Cush Atten (Remove) ($895.48/EA)