MTL W-Beam GD FEN (Steel Post) (Item 540-7002): TxDOT Unit Price History
1,434 bids · 244 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF
TxDOT 540-7002 · MTL W-BEAM GD FEN (STEEL POST) · Unit: LF
- Low bid
- $32.60/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $31.00/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $32.54/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -2.94%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 540-7002 (MTL W-Beam GD FEN (Steel Post)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,434 bids for it on 244 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 689 bids was $31.00 per LF, and the winning low bidders priced it at a weighted median of $32.60 per LF.
Winning unit prices sat close to TxDOT's own engineer's estimate ($32.54 per LF), within two percent.
By calendar year, the median bid moved from $33.69 in 2025 (711 bids) to $33.00 in 2026 (636 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $30.00 and $39.61.
Comparing the last 12 months with the 12 months before, the median unit price fell 2.94%.
Quantity matters for this item. Lines of 5 to 350 LF had a weighted median of $35.00, while lines above 1,175 LF had $30.75, a 12% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 220 lines where both a winning and a second-place bid were published, the median winning unit price was $33.00 against $32.53 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 17 TxDOT districts with at least ten bids, Bryan had the lowest weighted median ($25.00) and Lufkin the highest ($40.00). The busiest district for this item was Paris.
The most recent letting with this item was on Nov 4, 2026 in Denton County, where Indus Road & Bridge, Inc. was the low bidder at $33.00 per LF for 1,025 LF against an estimate of $38.00.
66 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 540-7001 MTL W-Beam GD FEN (TIM Post) (weighted median $25.75 per LF); 540-7005 MTL Beam GD FEN Trans (Thrie-Beam) (weighted median $2,208.14 per EA); 540-7015 Downstream Anchor Terminal Section (weighted median $1,485.00 per EA); 542-7001 Remove Metal Beam Guard Fence (weighted median $2.55 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 87 | 14 | $32.81 | $31.00 | $35.00 | $31.80 | $42.00 |
| 2025 | 711 | 127 | $32.45 | $30.16 | $33.69 | $30.00 | $40.00 |
| 2026 | 636 | 103 | $32.88 | $31.00 | $33.00 | $30.00 | $39.61 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 5–350 | 488 | $38.75 | $35.00 | $32.00–$46.06 |
| Medium | 355–1,137.5 | 473 | $34.22 | $32.50 | $29.40–$38.00 |
| Large | 1,175–40,812.5 | 473 | $32.18 | $30.75 | $29.50–$35.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $33.00
- Median second-low unit price
- $32.53
- Median engineer’s estimate
- $35.00
- Median gap, second vs. low
- +0%
220 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 1,025 LF · Engineer’s estimate $38.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $33.00/LF | $33,825.00 | — | -13.2% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $32.00/LF | $32,800.00 | -$1,025 | -15.8% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $32.00/LF | $32,800.00 | -$1,025 | -15.8% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $30.77/LF | $31,539.25 | -$2,286 | -19% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $30.00/LF | $30,750.00 | -$3,075 | -21.1% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $31.13/LF | $31,908.25 | -$1,917 | -18.1% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $33.00/LF
- Extension
- $33,825.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -13.2%
2. Rpm Xconstruction, LLC
- Unit price
- $32.00/LF
- Extension
- $32,800.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -15.8%
- Unit price
- $32.00/LF
- Extension
- $32,800.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -15.8%
4. Webber, LLC
- Unit price
- $30.77/LF
- Extension
- $31,539.25
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -19%
5. Sema Construction, Inc.
- Unit price
- $30.00/LF
- Extension
- $30,750.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -21.1%
6. Zachry Construction Corporation
- Unit price
- $31.13/LF
- Extension
- $31,908.25
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -18.1%
Proposal 1017-03-040 · let Nov 4, 2026 · Hunt County, Paris District
Line quantity 850 LF · Engineer’s estimate $23.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway 19 Construction LLCLOW BID | $30.00/LF | $25,500.00 | — | +30.4% | $6,803,596 | $438,151 (6.44%) left on table |
| 2 | Thk Construction LLC | $32.74/LF | $27,829.00 | +$2,329 | +42.3% | $7,241,746 | +$438,151 |
| 3 | East Texas Bridge, Inc. | $32.50/LF | $27,625.00 | +$2,125 | +41.3% | $7,366,754 | +$563,159 |
| 4 | D. L. Lennon Incorporated - Contractor | $30.00/LF | $25,500.00 | $0.000 | +30.4% | $7,400,348 | +$596,752 |
| 5 | Rk Hall, LLC | $30.45/LF | $25,882.50 | +$382.50 | +32.4% | $7,514,717 | +$711,122 |
| 6 | Austin Bridge & Road Services, LP | $30.00/LF | $25,500.00 | $0.000 | +30.4% | $7,794,981 | +$991,385 |
| 7 | Texas Materials Group, Inc. | $29.00/LF | $24,650.00 | -$850.00 | +26.1% | $7,795,159 | +$991,563 |
| 8 | Cdm Holdings | $32.00/LF | $27,200.00 | +$1,700 | +39.1% | $8,325,506 | +$1,521,910 |
| 9 | Ed Bell Construction Company | $32.00/LF | $27,200.00 | +$1,700 | +39.1% | $9,159,173 | +$2,355,578 |
1. Highway 19 Construction LLC
LOW BID · WINNER- Unit price
- $30.00/LF
- Extension
- $25,500.00
- Proposal total
- $6,803,596
- Money left on the table
- $438,151 (6.44%)
- vs. engineer’s estimate
- +30.4%
- Unit price
- $32.74/LF
- Extension
- $27,829.00
- Proposal total
- $7,241,746
- vs. low bid
- +$438,151
- vs. engineer’s estimate
- +42.3%
- Unit price
- $32.50/LF
- Extension
- $27,625.00
- Proposal total
- $7,366,754
- vs. low bid
- +$563,159
- vs. engineer’s estimate
- +41.3%
- Unit price
- $30.00/LF
- Extension
- $25,500.00
- Proposal total
- $7,400,348
- vs. low bid
- +$596,752
- vs. engineer’s estimate
- +30.4%
5. Rk Hall, LLC
- Unit price
- $30.45/LF
- Extension
- $25,882.50
- Proposal total
- $7,514,717
- vs. low bid
- +$711,122
- vs. engineer’s estimate
- +32.4%
- Unit price
- $30.00/LF
- Extension
- $25,500.00
- Proposal total
- $7,794,981
- vs. low bid
- +$991,385
- vs. engineer’s estimate
- +30.4%
- Unit price
- $29.00/LF
- Extension
- $24,650.00
- Proposal total
- $7,795,159
- vs. low bid
- +$991,563
- vs. engineer’s estimate
- +26.1%
8. Cdm Holdings
- Unit price
- $32.00/LF
- Extension
- $27,200.00
- Proposal total
- $8,325,506
- vs. low bid
- +$1,521,910
- vs. engineer’s estimate
- +39.1%
- Unit price
- $32.00/LF
- Extension
- $27,200.00
- Proposal total
- $9,159,173
- vs. low bid
- +$2,355,578
- vs. engineer’s estimate
- +39.1%
Proposal 0022-03-032 · let Nov 3, 2026 · Terrell County, Odessa District
Line quantity 350 LF · Engineer’s estimate $34.90/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | The Truesdell CorporationLOW BID | $38.00/LF | $13,300.00 | — | +8.9% | $2,888,888 | $89,789 (3.11%) left on table |
| 2 | Relmco, Inc. | $37.40/LF | $13,090.00 | -$210.00 | +7.2% | $2,978,677 | +$89,789 |
| 3 | Pathfield Investments LLC | $35.00/LF | $12,250.00 | -$1,050 | +0.3% | $3,052,152 | +$163,264 |
| 4 | Structural Integrity Group LLC | $35.00/LF | $12,250.00 | -$1,050 | +0.3% | $3,205,119 | +$316,231 |
| 5 | Massana Construction Inc. | $35.00/LF | $12,250.00 | -$1,050 | +0.3% | $3,332,351 | +$443,463 |
| 6 | Scr Civil Construction, LLC | $42.00/LF | $14,700.00 | +$1,400 | +20.3% | $3,557,553 | +$668,665 |
| 7 | Ragle Construction, Inc. | $35.00/LF | $12,250.00 | -$1,050 | +0.3% | $3,982,565 | +$1,093,677 |
- LOW BID · WINNER
- Unit price
- $38.00/LF
- Extension
- $13,300.00
- Proposal total
- $2,888,888
- Money left on the table
- $89,789 (3.11%)
- vs. engineer’s estimate
- +8.9%
2. Relmco, Inc.
- Unit price
- $37.40/LF
- Extension
- $13,090.00
- Proposal total
- $2,978,677
- vs. low bid
- +$89,789
- vs. engineer’s estimate
- +7.2%
- Unit price
- $35.00/LF
- Extension
- $12,250.00
- Proposal total
- $3,052,152
- vs. low bid
- +$163,264
- vs. engineer’s estimate
- +0.3%
- Unit price
- $35.00/LF
- Extension
- $12,250.00
- Proposal total
- $3,205,119
- vs. low bid
- +$316,231
- vs. engineer’s estimate
- +0.3%
- Unit price
- $35.00/LF
- Extension
- $12,250.00
- Proposal total
- $3,332,351
- vs. low bid
- +$443,463
- vs. engineer’s estimate
- +0.3%
- Unit price
- $42.00/LF
- Extension
- $14,700.00
- Proposal total
- $3,557,553
- vs. low bid
- +$668,665
- vs. engineer’s estimate
- +20.3%
- Unit price
- $35.00/LF
- Extension
- $12,250.00
- Proposal total
- $3,982,565
- vs. low bid
- +$1,093,677
- vs. engineer’s estimate
- +0.3%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 1,025 | 6 | Indus Road & Bridge, Inc. | $33.00 | $38.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 850 | 9 | Highway 19 Construction LLC | $30.00 | $23.00 |
| 2026-11-03 | 0022-03-032 | Terrell | Odessa | 350 | 7 | The Truesdell Corporation | $38.00 | $34.90 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 975 | 8 | Coppell Construction Co., Inc. | $38.00 | $35.00 |
| 2026-10-07 | 0022-01-034 | Terrell | Odessa | 900 | 7 | Relmco, Inc. | $44.00 | $32.00 |
| 2026-10-07 | 0092-02-145 | Dallas | Dallas | 3,262.5 | 6 | Sice, Inc. | $36.60 | $35.50 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 275 | 8 | Hunter Industries, Ltd. | $38.22 | $34.00 |
| 2026-10-07 | 0510-06-024 | Fannin | Paris | 5,700 | 6 | A. K. Gillis & Sons, LLC | $27.55 | $25.00 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 25 | 7 | Ragle Construction, Inc. | $32.00 | $30.50 |
| 2026-10-06 | 0410-02-047 | Grayson | Paris | 975 | 7 | Highway 19 Construction LLC | $28.00 | $27.50 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Amarillo | 92 | $32.60 | $32.60 | $32.00 | -7.5% |
| Atlanta | 6 | $91.00 | $90.00 | $32.00 | — |
| Austin | 47 | $26.28 | $37.00 | $43.10 | 0% |
| Beaumont | 2 | $42.25 | $46.13 | $30.00 | — |
| Brownwood | 88 | $33.00 | $33.00 | $32.00 | +3.13% |
| Bryan | 25 | $25.00 | $25.00 | $35.00 | -42.53% |
| Childress | 108 | $37.40 | $31.50 | $40.00 | -10.53% |
| Corpus Christi | 7 | $33.70 | $35.00 | $48.00 | — |
| Dallas | 110 | $36.60 | $33.00 | $35.50 | +0.79% |
| El Paso | 40 | $28.00 | $31.00 | $32.00 | -10.71% |
| Fort Worth | 51 | $32.00 | $30.00 | $45.00 | -18.51% |
| Houston | 58 | $34.10 | $38.00 | $30.00 | +14.29% |
| Laredo | 5 | $50.00 | $45.00 | $80.00 | — |
| Lubbock | 66 | $33.00 | $35.00 | $45.00 | +1.45% |
| Lufkin | 10 | $40.00 | $40.00 | $250.00 | — |
| Odessa | 98 | $41.00 | $38.00 | $32.54 | -2.62% |
| Paris | 216 | $30.75 | $29.00 | $25.80 | -1.03% |
| Pharr | 2 | $37.00 | $38.50 | $35.00 | — |
| San Angelo | 59 | $28.00 | $32.00 | $35.00 | +7.35% |
| San Antonio | 38 | $38.00 | $38.20 | $33.00 | +29.39% |
| Tyler | 145 | $26.00 | $27.06 | $35.00 | -2.42% |
| Waco | 154 | $30.50 | $32.50 | $35.00 | +1.56% |
| Wichita Falls | 7 | $32.32 | $34.00 | $40.00 | — |
Related items
- 540-7001 · MTL W-Beam GD FEN (TIM Post) ($25.75/LF)
- 540-7005 · MTL Beam GD FEN Trans (Thrie-Beam) ($2,208.14/EA)
- 540-7015 · Downstream Anchor Terminal Section ($1,485.00/EA)
- 542-7001 · Remove Metal Beam Guard Fence ($2.55/LF)
- 542-7002 · Remove Terminal Anchor Section ($250.00/EA)
- 544-7001 · Guardrail END Treatment (Install) ($3,375.90/EA)
- 544-7003 · Guardrail END Treatment (Remove) ($255.00/EA)
- 545-7004 · Crash Cush Atten (Remove) ($895.48/EA)
Is your price for item 540-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.