Guardrail END Treatment (Install) (Item 544-7001): TxDOT Unit Price History

4,215 bids · 691 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure EA

TxDOT 544-7001 · GUARDRAIL END TREATMENT (INSTALL) · Unit: EA

Low bid
$3,400.00/EA
Quantity-weighted median of winning unit prices
Weighted median
$3,375.90/EA
Quantity-weighted median of every bid
Engineer’s estimate
$3,300.00/EA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
+2.94%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$3,000.00$4,000.00$5,000.001101001KQuantity (EA), log scaleUnit price ($/EA)
Winning (low) bid Other bid Fitted price curve (ln price = 8.21 − 0.032·ln qty, R² 0.04)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 544-7001 (Guardrail END Treatment (Install)) is measured in EA. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 4,215 bids for it on 691 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 2,144 bids was $3,375.90 per EA, and the winning low bidders priced it at a weighted median of $3,400.00 per EA.

TxDOT's engineer's estimate for the same lines had a weighted median of $3,300.00 per EA, so winning bids came in 3.0% above the estimate.

By calendar year, the median bid moved from $3,400.00 in 2025 (2,064 bids) to $3,500.00 in 2026 (1,995 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $3,200.00 and $3,800.00.

Comparing the last 12 months with the 12 months before, the median unit price rose 2.94%.

Quantity matters for this item. Lines of 1 to 4 EA had a weighted median of $3,500.00, while lines above 9 EA had $3,300.00, a 6% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 645 lines where both a winning and a second-place bid were published, the median winning unit price was $3,400.00 against $3,400.00 from the second-lowest bidder, a median gap of 1% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Tyler had the lowest weighted median ($3,100.00) and El Paso the highest ($4,000.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $4,935.00 per EA for 3 EA against an estimate of $3,900.00.

119 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 544-7003 Guardrail END Treatment (Remove) (weighted median $255.00 per EA); 545-7004 Crash Cush Atten (Remove) (weighted median $895.48 per EA); 545-7002 Crash Cush Atten (Move & Reset) (weighted median $1,350.00 per EA); 545-7014 Crash Cush Atten (Instl)(S)(N)(TL3) (weighted median $8,430.00 per EA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
202415625$3,532.50$3,431.82$3,487.66$3,100.00$3,801.00
20252,064352$3,400.14$3,332.50$3,400.00$3,124.69$3,800.00
20261,995317$3,427.84$3,375.00$3,500.00$3,200.00$3,800.00

Quantity bands

BandQuantity (EA)BidsWeighted avgWeighted median25th–75th pct
Small1–41,962$3,635.32$3,500.00$3,250.00–$4,000.00
Medium5–8911$3,464.58$3,400.00$3,145.83–$3,650.00
Large9–2221,342$3,366.75$3,300.00$3,100.00–$3,600.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$3,400.00
Median second-low unit price
$3,400.00
Median engineer’s estimate
$3,330.00
Median gap, second vs. low
+1%

645 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District

Line quantity 3 EA · Engineer’s estimate $3,900/EA

  • 1. Ti-Zack Concrete, LLC

    LOW BID · WINNER
    Unit price
    $4,935.00/EA
    Extension
    $14,805.00
    Proposal total
    $734,629
    Money left on the table
    $59,414 (8.09%)
    vs. engineer’s estimate
    +26.5%
  • Unit price
    $4,500.00/EA
    Extension
    $13,500.00
    Proposal total
    $794,043
    vs. low bid
    +$59,414
    vs. engineer’s estimate
    +15.4%
  • Unit price
    $4,500.00/EA
    Extension
    $13,500.00
    Proposal total
    $852,064
    vs. low bid
    +$117,434
    vs. engineer’s estimate
    +15.4%
  • Unit price
    $3,200.00/EA
    Extension
    $9,600.00
    Proposal total
    $863,606
    vs. low bid
    +$128,977
    vs. engineer’s estimate
    -17.9%
  • Unit price
    $4,950.00/EA
    Extension
    $14,850.00
    Proposal total
    $916,535
    vs. low bid
    +$181,906
    vs. engineer’s estimate
    +26.9%
  • Unit price
    $3,990.00/EA
    Extension
    $11,970.00
    Proposal total
    $974,652
    vs. low bid
    +$240,023
    vs. engineer’s estimate
    +2.3%
  • Unit price
    $3,255.00/EA
    Extension
    $9,765.00
    Proposal total
    $981,238
    vs. low bid
    +$246,609
    vs. engineer’s estimate
    -16.5%

Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District

Line quantity 11 EA · Engineer’s estimate $4,000/EA

  • 1. Lone Star Paving Company

    LOW BID · WINNER
    Unit price
    $3,400.00/EA
    Extension
    $37,400.00
    Proposal total
    $6,732,215
    Money left on the table
    $1,063,968 (15.8%)
    vs. engineer’s estimate
    -15%
  • Unit price
    $3,498.00/EA
    Extension
    $38,478.00
    Proposal total
    $7,796,183
    vs. low bid
    +$1,063,968
    vs. engineer’s estimate
    -12.6%
  • Unit price
    $3,712.35/EA
    Extension
    $40,835.85
    Proposal total
    $7,966,171
    vs. low bid
    +$1,233,956
    vs. engineer’s estimate
    -7.2%
  • Unit price
    $3,300.00/EA
    Extension
    $36,300.00
    Proposal total
    $8,000,580
    vs. low bid
    +$1,268,365
    vs. engineer’s estimate
    -17.5%
  • 5. Nobles Road Construction, Inc.

    Unit price
    $3,570.00/EA
    Extension
    $39,270.00
    Proposal total
    $8,307,427
    vs. low bid
    +$1,575,212
    vs. engineer’s estimate
    -10.8%
  • Unit price
    $3,675.00/EA
    Extension
    $40,425.00
    Proposal total
    $8,389,000
    vs. low bid
    +$1,656,785
    vs. engineer’s estimate
    -8.1%
  • Unit price
    $4,150.05/EA
    Extension
    $45,650.55
    Proposal total
    $8,534,153
    vs. low bid
    +$1,801,938
    vs. engineer’s estimate
    +3.8%
  • Unit price
    $3,400.00/EA
    Extension
    $37,400.00
    Proposal total
    $8,617,318
    vs. low bid
    +$1,885,103
    vs. engineer’s estimate
    -15%
  • Unit price
    $3,500.00/EA
    Extension
    $38,500.00
    Proposal total
    $9,257,856
    vs. low bid
    +$2,525,641
    vs. engineer’s estimate
    -12.5%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 16 EA · Engineer’s estimate $3,350/EA

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $3,250.00/EA
    Extension
    $52,000.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -3%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $3,420.00/EA
    Extension
    $54,720.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +2.1%
  • Unit price
    $3,200.00/EA
    Extension
    $51,200.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -4.5%
  • Unit price
    $3,320.00/EA
    Extension
    $53,120.00
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -0.9%
  • 5. Sema Construction, Inc.

    Unit price
    $3,100.00/EA
    Extension
    $49,600.00
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -7.5%
  • 6. Zachry Construction Corporation

    Unit price
    $3,217.12/EA
    Extension
    $51,473.92
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -4%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-126504-61-001PotterAmarillo37Ti-Zack Concrete, LLC$4,935.00$3,900.00
2026-11-040157-04-058HaskellAbilene119Lone Star Paving Company$3,400.00$4,000.00
2026-11-040195-02-092DentonDallas166Indus Road & Bridge, Inc.$3,250.00$3,350.00
2026-11-040212-03-058BrazosBryan612Fluor Enterprises, Inc.$3,405.00$3,300.00
2026-11-040922-33-234WebbLaredo47Stx Civil$4,298.06$3,350.00
2026-11-040947-03-034JasperBeaumont62Texas Materials Group, Inc.$3,355.00$2,800.00
2026-11-041017-03-040HuntParis59Highway 19 Construction LLC$3,410.00$2,100.00
2026-11-030015-13-432TravisAustin126Austin Bridge & Road Services, LP$3,200.00$3,210.04
2026-11-030022-03-032TerrellOdessa147The Truesdell Corporation$3,800.00$3,689.00
2026-11-030168-09-191RandallAmarillo48Coppell Construction Co., Inc.$3,800.00$3,250.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene173$3,300.00$3,400.00$3,500.00-0.03%
Amarillo97$3,750.00$3,543.75$3,200.00-5.69%
Atlanta132$3,180.00$3,250.00$3,200.00+3.13%
Austin252$3,200.00$3,555.00$3,152.00+4.17%
Beaumont146$3,500.00$3,395.00$3,200.00-0.4%
Brownwood82$3,800.00$3,500.00$3,500.00+4.37%
Bryan198$3,275.00$3,420.00$3,200.000%
Childress113$3,630.00$3,190.00$3,647.00-9.36%
Corpus Christi112$3,031.62$3,525.00$3,200.00+4.68%
Dallas419$3,250.00$3,200.00$3,300.00+0.48%
El Paso50$4,000.00$4,000.00$4,000.000%
Fort Worth308$3,000.00$3,240.00$3,300.00-3.59%
Houston356$3,292.50$3,425.00$3,000.000%
Laredo94$3,500.00$3,570.00$3,000.00+7.98%
Lubbock58$3,465.00$3,712.41$5,500.00+4.46%
Lufkin136$3,360.00$3,399.00$3,000.00+3.03%
Odessa86$4,485.04$3,854.00$3,552.07+0.78%
Paris207$3,410.00$3,300.00$3,000.00+3.13%
Pharr126$3,509.75$3,610.75$3,500.00+5.94%
San Angelo53$3,500.00$3,585.98$4,000.00-0.39%
San Antonio237$3,462.00$3,465.00$3,200.00+6.72%
Tyler162$3,100.00$3,100.00$3,400.000%
Waco147$3,270.00$3,275.00$3,350.00+0.84%
Wichita Falls115$3,450.00$3,465.00$3,000.00+3.03%
Yoakum356$3,343.00$3,500.00$3,200.00+0.83%

Related items

Is your price for item 544-7001 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.