Crash Cush Atten (Move & Reset) (Item 545-7002): TxDOT Unit Price History
1,363 bids · 219 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA
TxDOT 545-7002 · CRASH CUSH ATTEN (MOVE & RESET) · Unit: EA
- Low bid
- $1,250.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $1,350.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $1,526.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -7.25%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 545-7002 (Crash Cush Atten (Move & Reset)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,363 bids for it on 219 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 732 bids was $1,350.00 per EA, and the winning low bidders priced it at a weighted median of $1,250.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $1,526.00 per EA, so winning bids came in 18.1% below the estimate.
By calendar year, the median bid moved from $1,710.00 in 2025 (606 bids) to $1,587.58 in 2026 (684 bids), down 7.2%. The middle half of 2026 bids fell between $1,120.60 and $2,500.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 7.25%.
Quantity matters for this item. Lines of 1 to 3 EA had a weighted median of $2,000.00, while lines above 11 EA had $1,326.54, a 34% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 215 lines where both a winning and a second-place bid were published, the median winning unit price was $1,500.00 against $1,600.00 from the second-lowest bidder, a median gap of 1% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, San Angelo had the lowest weighted median ($875.92) and Lubbock the highest ($2,750.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Denton County, where Indus Road & Bridge, Inc. was the low bidder at $1,500.00 per EA for 34 EA against an estimate of $2,500.00.
8 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 545-7004 Crash Cush Atten (Remove) (weighted median $895.48 per EA); 545-7014 Crash Cush Atten (Instl)(S)(N)(TL3) (weighted median $8,430.00 per EA); 544-7001 Guardrail END Treatment (Install) (weighted median $3,375.90 per EA); 544-7003 Guardrail END Treatment (Remove) (weighted median $255.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 73 | 11 | $1,914.97 | $1,500.00 | $1,665.00 | $1,385.00 | $3,000.00 |
| 2025 | 606 | 104 | $1,771.83 | $1,440.00 | $1,710.00 | $1,200.00 | $2,639.92 |
| 2026 | 684 | 105 | $1,617.41 | $1,350.00 | $1,587.58 | $1,120.60 | $2,500.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–3 | 465 | $2,521.00 | $2,000.00 | $1,300.00–$3,000.00 |
| Medium | 4–10 | 467 | $2,212.41 | $1,675.15 | $1,200.00–$2,700.00 |
| Large | 11–400 | 431 | $1,572.31 | $1,326.54 | $1,050.00–$1,900.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $1,500.00
- Median second-low unit price
- $1,600.00
- Median engineer’s estimate
- $1,750.00
- Median gap, second vs. low
- +1%
215 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 34 EA · Engineer’s estimate $2,500/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $1,500.00/EA | $51,000.00 | — | -40% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $980.00/EA | $33,320.00 | -$17,680 | -60.8% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $1,450.00/EA | $49,300.00 | -$1,700 | -42% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $1,080.00/EA | $36,720.00 | -$14,280 | -56.8% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $1,080.00/EA | $36,720.00 | -$14,280 | -56.8% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $1,120.80/EA | $38,107.20 | -$12,893 | -55.2% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $1,500.00/EA
- Extension
- $51,000.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -40%
2. Rpm Xconstruction, LLC
- Unit price
- $980.00/EA
- Extension
- $33,320.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -60.8%
- Unit price
- $1,450.00/EA
- Extension
- $49,300.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -42%
4. Webber, LLC
- Unit price
- $1,080.00/EA
- Extension
- $36,720.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -56.8%
5. Sema Construction, Inc.
- Unit price
- $1,080.00/EA
- Extension
- $36,720.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -56.8%
6. Zachry Construction Corporation
- Unit price
- $1,120.80/EA
- Extension
- $38,107.20
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -55.2%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 22 EA · Engineer’s estimate $1,200/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $2,058.00/EA | $45,276.00 | — | +71.5% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $2,000.00/EA | $44,000.00 | -$1,276 | +66.7% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $2,957.00/EA | $65,054.00 | +$19,778 | +146.4% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $920.00/EA | $20,240.00 | -$25,036 | -23.3% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $2,000.00/EA | $44,000.00 | -$1,276 | +66.7% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $1,000.00/EA | $22,000.00 | -$23,276 | -16.7% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $4,500.00/EA | $99,000.00 | +$53,724 | +275% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $1,163.73/EA | $25,602.06 | -$19,674 | -3% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $2,103.94/EA | $46,286.68 | +$1,011 | +75.3% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $1,980.00/EA | $43,560.00 | -$1,716 | +65% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $1,781.00/EA | $39,182.00 | -$6,094 | +48.4% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $1,390.00/EA | $30,580.00 | -$14,696 | +15.8% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $2,058.00/EA
- Extension
- $45,276.00
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- +71.5%
- Unit price
- $2,000.00/EA
- Extension
- $44,000.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- +66.7%
- Unit price
- $2,957.00/EA
- Extension
- $65,054.00
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- +146.4%
- Unit price
- $920.00/EA
- Extension
- $20,240.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- -23.3%
- Unit price
- $2,000.00/EA
- Extension
- $44,000.00
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +66.7%
- Unit price
- $1,000.00/EA
- Extension
- $22,000.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- -16.7%
- Unit price
- $4,500.00/EA
- Extension
- $99,000.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- +275%
- Unit price
- $1,163.73/EA
- Extension
- $25,602.06
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- -3%
9. Zachry Construction Corporation
- Unit price
- $2,103.94/EA
- Extension
- $46,286.68
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- +75.3%
10. Brizo Construction, LLC
- Unit price
- $1,980.00/EA
- Extension
- $43,560.00
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +65%
- Unit price
- $1,781.00/EA
- Extension
- $39,182.00
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- +48.4%
- Unit price
- $1,390.00/EA
- Extension
- $30,580.00
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +15.8%
Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District
Line quantity 8 EA · Engineer’s estimate $1,500/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Stx CivilLOW BID | $1,834.67/EA | $14,677.36 | — | +22.3% | $2,866,785 | $83,215 (2.9%) left on table |
| 2 | Delgado's Contractors, LLC | $2,000.00/EA | $16,000.00 | +$1,323 | +33.3% | $2,950,000 | +$83,215 |
| 3 | Acee Construction LLC. | $750.00/EA | $6,000.00 | -$8,677 | -50% | $3,033,273 | +$166,488 |
| 4 | James Construction Group, LLC | $1,517.49/EA | $12,139.92 | -$2,537 | +1.2% | $3,261,472 | +$394,687 |
| 5 | E-Z Bel Construction, LLC | $1,350.00/EA | $10,800.00 | -$3,877 | -10% | $3,270,969 | +$404,184 |
| 6 | Lucania Contractors LLC | $1,000.00/EA | $8,000.00 | -$6,677 | -33.3% | $3,466,015 | +$599,230 |
| 7 | Foremost Paving, Inc. | $1,400.00/EA | $11,200.00 | -$3,477 | -6.7% | $5,083,300 | +$2,216,516 |
1. Stx Civil
LOW BID · WINNER- Unit price
- $1,834.67/EA
- Extension
- $14,677.36
- Proposal total
- $2,866,785
- Money left on the table
- $83,215 (2.9%)
- vs. engineer’s estimate
- +22.3%
- Unit price
- $2,000.00/EA
- Extension
- $16,000.00
- Proposal total
- $2,950,000
- vs. low bid
- +$83,215
- vs. engineer’s estimate
- +33.3%
3. Acee Construction LLC.
- Unit price
- $750.00/EA
- Extension
- $6,000.00
- Proposal total
- $3,033,273
- vs. low bid
- +$166,488
- vs. engineer’s estimate
- -50%
- Unit price
- $1,517.49/EA
- Extension
- $12,139.92
- Proposal total
- $3,261,472
- vs. low bid
- +$394,687
- vs. engineer’s estimate
- +1.2%
- Unit price
- $1,350.00/EA
- Extension
- $10,800.00
- Proposal total
- $3,270,969
- vs. low bid
- +$404,184
- vs. engineer’s estimate
- -10%
- Unit price
- $1,000.00/EA
- Extension
- $8,000.00
- Proposal total
- $3,466,015
- vs. low bid
- +$599,230
- vs. engineer’s estimate
- -33.3%
- Unit price
- $1,400.00/EA
- Extension
- $11,200.00
- Proposal total
- $5,083,300
- vs. low bid
- +$2,216,516
- vs. engineer’s estimate
- -6.7%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 34 | 6 | Indus Road & Bridge, Inc. | $1,500.00 | $2,500.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 22 | 12 | Fluor Enterprises, Inc. | $2,058.00 | $1,200.00 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 8 | 7 | Stx Civil | $1,834.67 | $1,500.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 4 | 5 | J E Construction Services, LLC | $1,504.00 | $1,000.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 70 | 6 | Austin Bridge & Road Services, LP | $1,250.00 | $8,000.00 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 1 | 8 | Coppell Construction Co., Inc. | $3,000.00 | $1,500.00 |
| 2026-10-07 | 0022-01-034 | Terrell | Odessa | 2 | 7 | Relmco, Inc. | $900.00 | $1,700.00 |
| 2026-10-07 | 0067-17-039 | Randall | Amarillo | 3 | 5 | Gibson & Associates, Inc. | $2,750.00 | $1,500.00 |
| 2026-10-07 | 0092-03-064 | Ellis | Dallas | 4 | 8 | Xit Paving and Construction Inc. | $1,960.00 | $2,000.00 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 23 | 8 | Hunter Industries, Ltd. | $750.00 | $1,235.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 45 | $217.00 | $1,670.00 | $2,000.00 | +3.1% |
| Amarillo | 53 | $1,600.00 | $2,750.00 | $2,500.00 | +9.56% |
| Atlanta | 17 | $1,000.00 | $2,200.00 | $2,000.00 | — |
| Austin | 102 | $1,250.00 | $1,250.00 | $8,000.00 | -18.5% |
| Beaumont | 24 | $1,000.00 | $1,174.07 | $2,500.00 | — |
| Brownwood | 37 | $1,200.00 | $1,500.00 | $2,500.00 | +56.54% |
| Bryan | 61 | $2,058.00 | $1,980.00 | $1,200.00 | -1% |
| Childress | 50 | $1,100.00 | $2,500.00 | $1,757.48 | — |
| Corpus Christi | 30 | $1,504.00 | $1,500.00 | $1,000.00 | -8.92% |
| Dallas | 176 | $1,100.00 | $1,200.00 | $2,000.00 | -4% |
| El Paso | 21 | $3,800.00 | $1,200.00 | $1,500.00 | — |
| Fort Worth | 79 | $1,850.00 | $2,000.00 | $1,500.00 | -11.87% |
| Houston | 73 | $1,650.00 | $1,650.00 | $2,005.00 | -22.53% |
| Laredo | 79 | $1,250.00 | $1,200.00 | $1,450.00 | +37.68% |
| Lubbock | 30 | $2,500.00 | $2,750.00 | $1,750.00 | — |
| Lufkin | 19 | $2,200.00 | $1,900.00 | $1,650.00 | — |
| Odessa | 70 | $1,672.85 | $1,400.00 | $1,655.00 | -6% |
| Paris | 43 | $1,175.00 | $1,500.00 | $2,350.00 | — |
| Pharr | 57 | $500.00 | $1,200.00 | $1,509.00 | +0.64% |
| San Angelo | 34 | $1,113.00 | $875.92 | $1,300.00 | — |
| San Antonio | 83 | $1,500.00 | $1,000.00 | $1,500.00 | -45.18% |
| Tyler | 51 | $1,100.00 | $1,339.20 | $2,126.75 | -49.83% |
| Waco | 16 | $2,000.00 | $1,700.00 | $1,500.00 | — |
| Wichita Falls | 49 | $2,200.00 | $2,200.00 | $1,250.00 | -4.97% |
| Yoakum | 64 | $3,800.00 | $1,750.00 | $1,526.00 | +44.74% |
Related items
- 545-7004 · Crash Cush Atten (Remove) ($895.48/EA)
- 545-7014 · Crash Cush Atten (Instl)(S)(N)(TL3) ($8,430.00/EA)
- 544-7001 · Guardrail END Treatment (Install) ($3,375.90/EA)
- 544-7003 · Guardrail END Treatment (Remove) ($255.00/EA)
- 542-7001 · Remove Metal Beam Guard Fence ($2.55/LF)
- 542-7002 · Remove Terminal Anchor Section ($250.00/EA)
- 540-7001 · MTL W-Beam GD FEN (TIM Post) ($25.75/LF)
- 540-7005 · MTL Beam GD FEN Trans (Thrie-Beam) ($2,208.14/EA)
Is your price for item 545-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.