Crash Cush Atten (Remove) (Item 545-7004): TxDOT Unit Price History

1,707 bids · 286 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA

TxDOT 545-7004 · CRASH CUSH ATTEN (REMOVE) · Unit: EA

Low bid
$850.00/EA
Quantity-weighted median of winning unit prices
Weighted median
$895.48/EA
Quantity-weighted median of every bid
Engineer’s estimate
$1,000.00/EA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-9.09%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1,000.00$2,000.00$3,000.00$4,000.00110100Quantity (EA), log scaleUnit price ($/EA)
Winning (low) bid Other bid Fitted price curve (ln price = 7.17 − 0.149·ln qty, R² 0.08)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 545-7004 (Crash Cush Atten (Remove)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,707 bids for it on 286 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 906 bids was $895.48 per EA, and the winning low bidders priced it at a weighted median of $850.00 per EA.

TxDOT's engineer's estimate for the same lines had a weighted median of $1,000.00 per EA, so winning bids came in 15.0% below the estimate.

By calendar year, the median bid moved from $1,100.00 in 2025 (753 bids) to $1,000.00 in 2026 (858 bids), down 9.1%. The middle half of 2026 bids fell between $800.00 and $1,500.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 9.09%.

Quantity matters for this item. Lines of 1 to 2 EA had a weighted median of $1,200.00, while lines above 7 EA had $841.18, a 30% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 267 lines where both a winning and a second-place bid were published, the median winning unit price was $1,000.00 against $1,000.00 from the second-lowest bidder, a median gap of 1.04% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, El Paso had the lowest weighted median ($675.00) and Amarillo the highest ($2,150.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $1,500.00 per EA for 18 EA against an estimate of $1,100.00.

37 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 545-7002 Crash Cush Atten (Move & Reset) (weighted median $1,350.00 per EA); 545-7014 Crash Cush Atten (Instl)(S)(N)(TL3) (weighted median $8,430.00 per EA); 544-7001 Guardrail END Treatment (Install) (weighted median $3,375.90 per EA); 544-7003 Guardrail END Treatment (Remove) (weighted median $255.00 per EA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20249615$1,020.54$817.50$1,000.00$775.00$1,500.00
2025753136$1,154.66$900.00$1,100.00$850.00$1,650.00
2026858136$1,053.58$891.00$1,000.00$800.00$1,500.00

Quantity bands

BandQuantity (EA)BidsWeighted avgWeighted median25th–75th pct
Small1–2767$1,515.28$1,200.00$900.00–$1,907.49
Medium3–6500$1,305.27$1,050.00$862.25–$1,500.00
Large7–102440$981.88$841.18$740.00–$1,122.50

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$1,000.00
Median second-low unit price
$1,000.00
Median engineer’s estimate
$1,170.00
Median gap, second vs. low
+1.04%

267 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 18 EA · Engineer’s estimate $1,100/EA

  • Unit price
    $1,500.00/EA
    Extension
    $27,000.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    +36.4%
  • Unit price
    $750.00/EA
    Extension
    $13,500.00
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    -31.8%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $2,112.00/EA
    Extension
    $38,016.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    +92%
  • 4. Harper Brothers Construction LLC

    Unit price
    $775.00/EA
    Extension
    $13,950.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -29.5%

Proposal 0074-06-256 · let Nov 4, 2026 · Nueces County, Corpus Christi District

Line quantity 2 EA · Engineer’s estimate $1,000/EA

  • 1. Relmco, Inc.

    LOW BID · WINNER
    Unit price
    $1,200.00/EA
    Extension
    $2,400.00
    Proposal total
    $849,655
    Money left on the table
    $129,345 (15.22%)
    vs. engineer’s estimate
    +20%
  • Unit price
    $995.00/EA
    Extension
    $1,990.00
    Proposal total
    $979,000
    vs. low bid
    +$129,345
    vs. engineer’s estimate
    -0.5%
  • Unit price
    $6,000.00/EA
    Extension
    $12,000.00
    Proposal total
    $2,134,370
    vs. low bid
    +$1,284,715
    vs. engineer’s estimate
    +500%
  • Unit price
    $3,200.00/EA
    Extension
    $6,400.00
    Proposal total
    $2,604,587
    vs. low bid
    +$1,754,932
    vs. engineer’s estimate
    +220%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 11 EA · Engineer’s estimate $1,300/EA

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $900.00/EA
    Extension
    $9,900.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -30.8%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $735.00/EA
    Extension
    $8,085.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -43.5%
  • Unit price
    $1,000.00/EA
    Extension
    $11,000.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -23.1%
  • Unit price
    $575.00/EA
    Extension
    $6,325.00
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -55.8%
  • 5. Sema Construction, Inc.

    Unit price
    $575.00/EA
    Extension
    $6,325.00
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -55.8%
  • 6. Zachry Construction Corporation

    Unit price
    $596.73/EA
    Extension
    $6,564.03
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -54.1%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas184Mario Sinacola & Sons Excavating, Inc.$1,500.00$1,100.00
2026-11-040074-06-256NuecesCorpus Christi24Relmco, Inc.$1,200.00$1,000.00
2026-11-040195-02-092DentonDallas116Indus Road & Bridge, Inc.$900.00$1,300.00
2026-11-040212-03-058BrazosBryan2312Fluor Enterprises, Inc.$335.00$1,000.00
2026-11-040922-33-234WebbLaredo27Stx Civil$979.31$900.00
2026-11-041052-02-098NuecesCorpus Christi65J E Construction Services, LLC$1,244.00$700.00
2026-11-046506-48-001CoryellWaco12Awp Safety$2,500.00$1,750.00
2026-11-046509-56-001HillWaco13Awp Safety$2,500.00$1,750.00
2026-11-030015-13-432TravisAustin306Austin Bridge & Road Services, LP$500.00$1,800.00
2026-11-030038-01-107WebbLaredo14Hjc Farms, Inc.$5,000.00$500.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene45$875.00$875.00$1,000.00-0.85%
Amarillo58$2,200.00$2,150.00$1,500.00-0.6%
Atlanta17$500.00$880.00$1,000.00—
Austin125$500.00$692.00$1,500.00-21.95%
Beaumont50$1,000.00$1,000.00$1,200.00-6.98%
Brownwood42$1,500.00$1,650.00$1,500.00+43.78%
Bryan74$335.00$973.15$1,000.00+2.03%
Childress50$1,150.00$1,248.00$972.00—
Corpus Christi34$1,244.00$1,244.00$700.00+26.17%
Dallas231$1,000.00$900.73$1,100.00+3.07%
El Paso15$320.00$675.00$1,000.00—
Fort Worth95$900.00$1,420.00$900.00-5.33%
Houston126$1,020.00$1,000.00$1,300.00-45%
Laredo83$555.00$800.00$1,000.00+11.92%
Lubbock35$1,100.00$1,430.00$1,100.00+29.03%
Lufkin40$1,000.00$1,030.00$500.000%
Odessa69$1,294.68$1,100.00$1,210.00-11.11%
Paris61$785.00$864.00$1,170.00-5%
Pharr56$940.00$810.00$850.00-34.55%
San Angelo35$916.00$1,185.51$635.00—
San Antonio116$810.00$750.00$810.00-16.67%
Tyler65$900.00$879.86$1,300.00-14.29%
Waco37$2,500.00$1,415.25$1,750.00—
Wichita Falls48$1,000.00$1,100.00$1,000.00-14.75%
Yoakum100$1,459.85$1,100.00$935.00+15.27%

Related items

Is your price for item 545-7004 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.