Downstream Anchor Terminal Section (Item 540-7015): TxDOT Unit Price History

2,011 bids · 362 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure EA

TxDOT 540-7015 · DOWNSTREAM ANCHOR TERMINAL SECTION · Unit: EA

Low bid
$1,500.00/EA
Quantity-weighted median of winning unit prices
Weighted median
$1,485.00/EA
Quantity-weighted median of every bid
Engineer’s estimate
$1,500.00/EA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
0%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1,000.00$1,500.00$2,000.00$2,500.00$3,000.00110100Quantity (EA), log scaleUnit price ($/EA)
Winning (low) bid Other bid Fitted price curve (ln price = 7.38 − 0.035·ln qty, R² 0.02)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 540-7015 (Downstream Anchor Terminal Section) is measured in EA. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 2,011 bids for it on 362 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,085 bids was $1,485.00 per EA, and the winning low bidders priced it at a weighted median of $1,500.00 per EA.

Winning unit prices sat close to TxDOT's own engineer's estimate ($1,500.00 per EA), within two percent.

By calendar year, the median bid moved from $1,500.00 in 2025 (918 bids) to $1,500.00 in 2026 (1,021 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $1,300.00 and $1,735.00.

Comparing the last 12 months with the 12 months before, the median unit price did not change.

Quantity matters for this item. Lines of 1 to 2 EA had a weighted median of $1,531.17, while lines above 6 EA had $1,430.00, a 7% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 335 lines where both a winning and a second-place bid were published, the median winning unit price was $1,500.00 against $1,500.00 from the second-lowest bidder, a median gap of 0.85% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Lubbock had the lowest weighted median ($1,145.00) and El Paso the highest ($2,000.00). The busiest district for this item was Houston.

The most recent letting with this item was on Nov 4, 2026 in Haskell County, where Lone Star Paving Company was the low bidder at $1,500.00 per EA for 11 EA against an estimate of $2,000.00.

74 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 540-7001 MTL W-Beam GD FEN (TIM Post) (weighted median $25.75 per LF); 540-7005 MTL Beam GD FEN Trans (Thrie-Beam) (weighted median $2,208.14 per EA); 540-7002 MTL W-Beam GD FEN (Steel Post) (weighted median $31.00 per LF); 542-7001 Remove Metal Beam Guard Fence (weighted median $2.55 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20247212$1,455.85$1,350.00$1,474.50$1,257.50$1,700.00
2025918176$1,515.13$1,444.00$1,500.00$1,300.00$1,819.36
20261,021175$1,525.70$1,495.00$1,500.00$1,300.00$1,735.00

Quantity bands

BandQuantity (EA)BidsWeighted avgWeighted median25th–75th pct
Small1–2883$1,665.56$1,531.17$1,364.98–$1,850.00
Medium3–5458$1,543.12$1,500.00$1,300.00–$1,739.50
Large6–100670$1,494.80$1,430.00$1,250.00–$1,719.77

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$1,500.00
Median second-low unit price
$1,500.00
Median engineer’s estimate
$1,500.00
Median gap, second vs. low
+0.85%

335 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District

Line quantity 11 EA · Engineer’s estimate $2,000/EA

  • 1. Lone Star Paving Company

    LOW BID · WINNER
    Unit price
    $1,500.00/EA
    Extension
    $16,500.00
    Proposal total
    $6,732,215
    Money left on the table
    $1,063,968 (15.8%)
    vs. engineer’s estimate
    -25%
  • Unit price
    $1,404.50/EA
    Extension
    $15,449.50
    Proposal total
    $7,796,183
    vs. low bid
    +$1,063,968
    vs. engineer’s estimate
    -29.8%
  • Unit price
    $1,637.80/EA
    Extension
    $18,015.80
    Proposal total
    $7,966,171
    vs. low bid
    +$1,233,956
    vs. engineer’s estimate
    -18.1%
  • Unit price
    $1,325.00/EA
    Extension
    $14,575.00
    Proposal total
    $8,000,580
    vs. low bid
    +$1,268,365
    vs. engineer’s estimate
    -33.8%
  • 5. Nobles Road Construction, Inc.

    Unit price
    $1,575.00/EA
    Extension
    $17,325.00
    Proposal total
    $8,307,427
    vs. low bid
    +$1,575,212
    vs. engineer’s estimate
    -21.3%
  • Unit price
    $1,600.00/EA
    Extension
    $17,600.00
    Proposal total
    $8,389,000
    vs. low bid
    +$1,656,785
    vs. engineer’s estimate
    -20%
  • Unit price
    $1,830.91/EA
    Extension
    $20,140.01
    Proposal total
    $8,534,153
    vs. low bid
    +$1,801,938
    vs. engineer’s estimate
    -8.5%
  • Unit price
    $1,500.00/EA
    Extension
    $16,500.00
    Proposal total
    $8,617,318
    vs. low bid
    +$1,885,103
    vs. engineer’s estimate
    -25%
  • Unit price
    $1,400.00/EA
    Extension
    $15,400.00
    Proposal total
    $9,257,856
    vs. low bid
    +$2,525,641
    vs. engineer’s estimate
    -30%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 4 EA · Engineer’s estimate $1,400/EA

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $1,250.00/EA
    Extension
    $5,000.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -10.7%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $1,575.00/EA
    Extension
    $6,300.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +12.5%
  • Unit price
    $1,200.00/EA
    Extension
    $4,800.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -14.3%
  • Unit price
    $1,529.00/EA
    Extension
    $6,116.00
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    +9.2%
  • 5. Sema Construction, Inc.

    Unit price
    $1,230.00/EA
    Extension
    $4,920.00
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -12.1%
  • 6. Zachry Construction Corporation

    Unit price
    $1,276.47/EA
    Extension
    $5,105.88
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -8.8%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 7 EA · Engineer’s estimate $1,700/EA

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $1,314.00/EA
    Extension
    $9,198.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    -22.7%
  • Unit price
    $1,500.00/EA
    Extension
    $10,500.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    -11.8%
  • Unit price
    $1,339.00/EA
    Extension
    $9,373.00
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -21.2%
  • Unit price
    $1,470.00/EA
    Extension
    $10,290.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    -13.5%
  • Unit price
    $900.00/EA
    Extension
    $6,300.00
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -47.1%
  • Unit price
    $1,600.00/EA
    Extension
    $11,200.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -5.9%
  • Unit price
    $1,300.00/EA
    Extension
    $9,100.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -23.5%
  • Unit price
    $1,249.50/EA
    Extension
    $8,746.50
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    -26.5%
  • 9. Zachry Construction Corporation

    Unit price
    $1,710.14/EA
    Extension
    $11,970.98
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +0.6%
  • 10. Brizo Construction, LLC

    Unit price
    $1,320.00/EA
    Extension
    $9,240.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    -22.4%
  • Unit price
    $900.00/EA
    Extension
    $6,300.00
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -47.1%
  • Unit price
    $2,340.00/EA
    Extension
    $16,380.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +37.6%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040157-04-058HaskellAbilene119Lone Star Paving Company$1,500.00$2,000.00
2026-11-040195-02-092DentonDallas46Indus Road & Bridge, Inc.$1,250.00$1,400.00
2026-11-040212-03-058BrazosBryan712Fluor Enterprises, Inc.$1,314.00$1,700.00
2026-11-040922-33-234WebbLaredo47Stx Civil$1,450.82$1,600.00
2026-11-030015-13-432TravisAustin16Austin Bridge & Road Services, LP$1,300.00$1,434.00
2026-11-032552-01-062El PasoEl Paso196Allen Concrete, LLC$2,000.00$1,800.00
2026-10-070092-02-145DallasDallas156Sice, Inc.$2,019.50$1,500.00
2026-10-070143-03-049WilsonSan Antonio38Hunter Industries, Ltd.$1,906.15$1,428.00
2026-10-071137-02-044CameronPharr13Austin Traffic Signal Construction Co., LLC$3,250.00$1,520.00
2026-10-076506-90-001TarrantFort Worth103Short-Line, LLC$1,500.00$1,000.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene55$1,500.00$1,500.00$2,000.00+0.28%
Amarillo47$1,875.00$1,575.00$1,150.000%
Atlanta55$1,290.00$1,400.00$1,390.00+7.69%
Austin141$1,523.75$1,500.00$1,500.00-4.21%
Beaumont76$1,500.00$1,625.00$1,800.00-9.03%
Brownwood15$1,700.00$1,325.00$1,500.00—
Bryan67$1,314.00$1,500.00$1,700.00+3.33%
Childress22$1,955.00$1,500.00$1,706.30—
Corpus Christi38$1,732.80$1,700.00$1,612.00+7.67%
Dallas231$1,250.00$1,365.00$1,275.00-0.71%
El Paso48$2,000.00$2,000.00$1,800.00+14.29%
Fort Worth188$1,325.00$1,380.00$1,387.50-3.02%
Houston271$1,300.00$1,600.00$1,420.00+9.5%
Laredo51$1,762.58$1,700.00$1,480.00+23.23%
Lubbock48$1,190.00$1,145.00$2,200.00-18.64%
Lufkin56$1,250.00$1,350.00$1,100.00-15%
Odessa56$2,000.00$1,700.00$1,620.91+3.03%
Paris13$1,530.00$1,335.00$1,440.00—
Pharr83$1,732.25$1,800.00$1,600.00+7.34%
San Angelo28$1,649.75$1,800.00$2,500.00+29.35%
San Antonio187$1,152.63$1,277.13$1,136.87-2.25%
Tyler39$1,500.00$1,320.00$1,600.00-9.17%
Waco115$1,320.00$1,375.00$1,400.00-7.5%
Wichita Falls26$1,250.00$1,375.00$2,500.00—
Yoakum55$3,267.30$1,826.00$1,750.00+15.48%

Related items

Is your price for item 540-7015 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.