Mill Rumble Strips (Asphalt) (Shldr) (Item 533-7001): TxDOT Unit Price History

1,887 bids · 350 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 533-7001 · MILL RUMBLE STRIPS (ASPHALT) (SHLDR) · Unit: LF

Low bid
$0.180/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.180/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.200/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
0%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$2.00$4.00$6.00101001K10K100K1M10MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 3.56 − 0.447·ln qty, R² 0.54)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 533-7001 (Mill Rumble Strips (Asphalt) (Shldr)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,887 bids for it on 350 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 919 bids was $0.180 per LF, and the winning low bidders priced it at a weighted median of $0.180 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.200 per LF, so winning bids came in 10.0% below the estimate.

By calendar year, the median bid moved from $0.250 in 2025 (977 bids) to $0.250 in 2026 (840 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $0.180 and $0.600.

Comparing the last 12 months with the 12 months before, the median unit price did not change.

Quantity matters for this item. Lines of 50 to 26,280.64 LF had a weighted median of $0.500, while lines above 78,645 LF had $0.160, a 68% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 341 lines where both a winning and a second-place bid were published, the median winning unit price was $0.250 against $0.250 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Waco had the lowest weighted median ($0.110) and San Angelo the highest ($2.25). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Haskell County, where Lone Star Paving Company was the low bidder at $0.130 per LF for 122,905 LF against an estimate of $0.200.

31 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 533-7002 Mill Rumble Strips (Asph) (Centerline) (weighted median $0.200 per LF); 531-7001 Conc Sidewalks (4") (weighted median $65.00 per SY); 530-7010 Driveways (ACP) (weighted median $59.25 per SY); 530-7006 Driveways (Conc) (weighted median $106.00 per SY).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20247013$0.190$0.170$0.210$0.150$0.320
2025977182$0.230$0.180$0.250$0.160$0.500
2026840156$0.230$0.180$0.250$0.180$0.600

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small50–26,280.64630$0.800$0.500$0.400–$1.84
Medium26,477–78,258630$0.260$0.220$0.160–$0.300
Large78,645–1,183,325627$0.190$0.160$0.130–$0.240

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.250
Median second-low unit price
$0.250
Median engineer’s estimate
$0.260
Median gap, second vs. low
+0%

341 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District

Line quantity 122,905 LF · Engineer’s estimate $0.200/LF

  • 1. Lone Star Paving Company

    LOW BID · WINNER
    Unit price
    $0.13/LF
    Extension
    $15,977.65
    Proposal total
    $6,732,215
    Money left on the table
    $1,063,968 (15.8%)
    vs. engineer’s estimate
    -35%
  • Unit price
    $0.30/LF
    Extension
    $36,871.50
    Proposal total
    $7,796,183
    vs. low bid
    +$1,063,968
    vs. engineer’s estimate
    +50%
  • Unit price
    $0.19/LF
    Extension
    $23,351.95
    Proposal total
    $7,966,171
    vs. low bid
    +$1,233,956
    vs. engineer’s estimate
    -5%
  • Unit price
    $0.15/LF
    Extension
    $18,435.75
    Proposal total
    $8,000,580
    vs. low bid
    +$1,268,365
    vs. engineer’s estimate
    -25%
  • 5. Nobles Road Construction, Inc.

    Unit price
    $0.18/LF
    Extension
    $22,122.90
    Proposal total
    $8,307,427
    vs. low bid
    +$1,575,212
    vs. engineer’s estimate
    -10%
  • Unit price
    $0.20/LF
    Extension
    $24,581.00
    Proposal total
    $8,389,000
    vs. low bid
    +$1,656,785
    vs. engineer’s estimate
    0%
  • Unit price
    $0.21/LF
    Extension
    $25,810.05
    Proposal total
    $8,534,153
    vs. low bid
    +$1,801,938
    vs. engineer’s estimate
    +5%
  • Unit price
    $0.20/LF
    Extension
    $24,581.00
    Proposal total
    $8,617,318
    vs. low bid
    +$1,885,103
    vs. engineer’s estimate
    0%
  • Unit price
    $0.28/LF
    Extension
    $34,413.40
    Proposal total
    $9,257,856
    vs. low bid
    +$2,525,641
    vs. engineer’s estimate
    +40%

Proposal 0353-01-031 · let Nov 4, 2026 · Wise County, Fort Worth District

Line quantity 1,300 LF · Engineer’s estimate $2.50/LF

  • Unit price
    $6.00/LF
    Extension
    $7,800.00
    Proposal total
    $482,224
    Money left on the table
    $101,735 (21.1%)
    vs. engineer’s estimate
    +140%
  • Unit price
    $0.01/LF
    Extension
    $13.00
    Proposal total
    $583,959
    vs. low bid
    +$101,735
    vs. engineer’s estimate
    -99.6%
  • Unit price
    $3.25/LF
    Extension
    $4,225.00
    Proposal total
    $594,655
    vs. low bid
    +$112,431
    vs. engineer’s estimate
    +30%
  • 4. Jay Mills Contracting, Incorporated

    Unit price
    $6.45/LF
    Extension
    $8,385.00
    Proposal total
    $607,976
    vs. low bid
    +$125,752
    vs. engineer’s estimate
    +158%
  • 5. Silver Creek Construction, Inc.

    Unit price
    $3.00/LF
    Extension
    $3,900.00
    Proposal total
    $649,060
    vs. low bid
    +$166,836
    vs. engineer’s estimate
    +20%
  • Unit price
    $3.25/LF
    Extension
    $4,225.00
    Proposal total
    $701,946
    vs. low bid
    +$219,722
    vs. engineer’s estimate
    +30%
  • 7. Overland Corporation

    Unit price
    $3.85/LF
    Extension
    $5,005.00
    Proposal total
    $771,411
    vs. low bid
    +$289,187
    vs. engineer’s estimate
    +54%

Proposal 1052-02-098 · let Nov 4, 2026 · Nueces County, Corpus Christi District

Line quantity 11,096 LF · Engineer’s estimate $0.250/LF

  • 1. J E Construction Services, LLC

    LOW BID · WINNER
    Unit price
    $1.00/LF
    Extension
    $11,096.00
    Proposal total
    $3,833,265
    Money left on the table
    $3,958 (0.1%)
    vs. engineer’s estimate
    +300%
  • Unit price
    $0.65/LF
    Extension
    $7,212.40
    Proposal total
    $3,837,222
    vs. low bid
    +$3,958
    vs. engineer’s estimate
    +160%
  • Unit price
    $0.40/LF
    Extension
    $4,438.40
    Proposal total
    $4,616,801
    vs. low bid
    +$783,537
    vs. engineer’s estimate
    +60%
  • 4. Stx Civil

    Unit price
    $0.41/LF
    Extension
    $4,549.36
    Proposal total
    $4,817,402
    vs. low bid
    +$984,137
    vs. engineer’s estimate
    +64%
  • Unit price
    $0.45/LF
    Extension
    $4,993.20
    Proposal total
    $4,943,316
    vs. low bid
    +$1,110,051
    vs. engineer’s estimate
    +80%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040157-04-058HaskellAbilene122,9059Lone Star Paving Company$0.130$0.200
2026-11-040353-01-031WiseFort Worth1,3007Xit Paving and Construction Inc.$6.00$2.50
2026-11-040947-03-034JasperBeaumont21,2002Texas Materials Group, Inc.$0.460$0.300
2026-11-041052-02-098NuecesCorpus Christi11,0965J E Construction Services, LLC$1.00$0.250
2026-11-030008-02-078ParkerFort Worth1,8008Jay Mills Contracting, Incorporated$4.65$1.00
2026-11-030220-01-038HidalgoPharr76,8992Foremost Paving, Inc.$0.180$0.150
2026-10-146502-76-001EllisDallas4,4002Stripe-A-Zone, LLC$1.65$0.300
2026-10-070143-03-049WilsonSan Antonio63,7018Hunter Industries, Ltd.$0.240$0.230
2026-10-070200-01-093AngelinaLufkin60,3437Longview Bridge and Road, Ltd.$0.170$0.300
2026-10-070510-06-024FanninParis64,6426A. K. Gillis & Sons, LLC$0.070$0.260

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene98$0.220$0.200$0.2000%
Amarillo30$0.250$0.150$0.300—
Atlanta35$0.300$0.300$0.340—
Austin6$0.220$0.240$0.350—
Beaumont59$0.200$0.200$0.500-54.62%
Brownwood31$0.130$0.150$0.140-38.78%
Bryan113$0.270$0.250$0.230-32%
Childress54$0.230$0.160$0.190+33.33%
Corpus Christi96$0.120$0.170$0.150-11.11%
Dallas291$0.300$0.220$0.250+15.38%
El Paso2$1.00$0.750$0.500—
Fort Worth142$0.200$0.250$1.00+16.67%
Houston63$0.190$0.200$0.200+11.11%
Laredo49$0.210$0.140$0.170+12.5%
Lubbock57$0.450$0.800$0.280+506.06%
Lufkin64$0.200$0.250$0.300-68.75%
Odessa111$0.190$0.180$0.200+5.26%
Paris54$0.180$0.190$0.260-42.86%
Pharr63$0.130$0.180$0.360-28%
San Angelo17$2.25$2.25$5.00—
San Antonio91$0.190$0.170$0.170+17.5%
Tyler147$0.270$0.250$0.210+20%
Waco72$0.100$0.110$0.200-20%
Wichita Falls78$0.220$0.200$0.2500%
Yoakum64$0.160$0.280$0.150-5.45%

Related items

Is your price for item 533-7001 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.