Lime (COM OR QK)(Slurry) OR QK(DRY) (Item 260-7001): TxDOT Unit Price History
564 bids · 82 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure TON
TxDOT 260-7001 · LIME (COM OR QK)(SLURRY) OR QK(DRY) · Unit: TON
- Low bid
- $342.00/TON
- Quantity-weighted median of winning unit prices
- Weighted median
- $345.92/TON
- Quantity-weighted median of every bid
- Engineer’s estimate
- $330.00/TON
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- +0.38%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 260-7001 (Lime (COM OR QK)(Slurry) OR QK(DRY)) is measured in TON. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 564 bids for it on 82 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 327 bids was $345.92 per TON, and the winning low bidders priced it at a weighted median of $342.00 per TON.
TxDOT's engineer's estimate for the same lines had a weighted median of $330.00 per TON, so winning bids came in 3.6% above the estimate.
By calendar year, the median bid moved from $363.00 in 2025 (276 bids) to $360.00 in 2026 (253 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $335.69 and $394.40.
Comparing the last 12 months with the 12 months before, the median unit price rose 0.38%.
Quantity matters for this item. Lines of 2 to 60 TON had a weighted median of $375.00, while lines above 351 TON had $341.00, a 9% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 73 lines where both a winning and a second-place bid were published, the median winning unit price was $352.95 against $351.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 9 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($334.00) and Dallas the highest ($384.75). The busiest district for this item was Yoakum.
The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $320.00 per TON for 2,986 TON against an estimate of $305.00.
19 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 275-7001 Cement (weighted median $220.00 per TON); 341-7082 Tack Coat (weighted median $4.00 per GAL); 341-7001 D-GR HMA TY-B PG64-22 (weighted median $85.40 per TON); 341-7050 D-GR HMA TY-D SAC-B PG70-22 (weighted median $125.00 per TON).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 35 | 5 | $375.36 | $371.40 | $380.00 | $353.15 | $410.90 |
| 2025 | 276 | 41 | $359.91 | $350.00 | $363.00 | $339.51 | $400.00 |
| 2026 | 253 | 37 | $352.13 | $342.00 | $360.00 | $335.69 | $394.40 |
Quantity bands
| Band | Quantity (TON) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 2–60 | 192 | $385.88 | $375.00 | $350.00–$421.62 |
| Medium | 61–329 | 187 | $366.70 | $360.00 | $340.00–$393.91 |
| Large | 351–11,991 | 185 | $354.90 | $341.00 | $327.00–$375.60 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $352.95
- Median second-low unit price
- $351.00
- Median engineer’s estimate
- $350.00
- Median gap, second vs. low
- +0%
73 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 2,986 TON · Engineer’s estimate $305.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $320.00/TON | $955,520.00 | — | +4.9% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $450.00/TON | $1,343,700.00 | +$388,180 | +47.5% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $369.50/TON | $1,103,327.00 | +$147,807 | +21.1% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $451.00/TON | $1,346,686.00 | +$391,166 | +47.9% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $320.00/TON
- Extension
- $955,520.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- +4.9%
- Unit price
- $450.00/TON
- Extension
- $1,343,700.00
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +47.5%
3. Tiseo Paving Company, LLC
- Unit price
- $369.50/TON
- Extension
- $1,103,327.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +21.1%
4. Harper Brothers Construction LLC
- Unit price
- $451.00/TON
- Extension
- $1,346,686.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- +47.9%
Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District
Line quantity 1,546 TON · Engineer’s estimate $330.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Big Creek Construction, Ltd.LOW BID | $342.00/TON | $528,732.00 | — | +3.6% | $9,787,627 | $395,153 (4.04%) left on table |
| 2 | Larry Young Paving, Inc. | $400.00/TON | $618,400.00 | +$89,668 | +21.2% | $10,182,780 | +$395,153 |
| 3 | Knife River Corporation - South | $335.00/TON | $517,910.00 | -$10,822 | +1.5% | $10,424,591 | +$636,964 |
| 4 | Texas Materials Group, Inc. | $334.00/TON | $516,364.00 | -$12,368 | +1.2% | $12,020,138 | +$2,232,511 |
| 5 | A. L. Helmcamp, Inc. | $350.00/TON | $541,100.00 | +$12,368 | +6.1% | $12,374,454 | +$2,586,827 |
| 6 | Patin Construction LLC | $400.00/TON | $618,400.00 | +$89,668 | +21.2% | $15,629,317 | +$5,841,690 |
| 7 | Joe Bland Construction LLC | $400.00/TON | $618,400.00 | +$89,668 | +21.2% | $18,492,861 | +$8,705,235 |
1. Big Creek Construction, Ltd.
LOW BID · WINNER- Unit price
- $342.00/TON
- Extension
- $528,732.00
- Proposal total
- $9,787,627
- Money left on the table
- $395,153 (4.04%)
- vs. engineer’s estimate
- +3.6%
- Unit price
- $400.00/TON
- Extension
- $618,400.00
- Proposal total
- $10,182,780
- vs. low bid
- +$395,153
- vs. engineer’s estimate
- +21.2%
- Unit price
- $335.00/TON
- Extension
- $517,910.00
- Proposal total
- $10,424,591
- vs. low bid
- +$636,964
- vs. engineer’s estimate
- +1.5%
- Unit price
- $334.00/TON
- Extension
- $516,364.00
- Proposal total
- $12,020,138
- vs. low bid
- +$2,232,511
- vs. engineer’s estimate
- +1.2%
- Unit price
- $350.00/TON
- Extension
- $541,100.00
- Proposal total
- $12,374,454
- vs. low bid
- +$2,586,827
- vs. engineer’s estimate
- +6.1%
6. Patin Construction LLC
- Unit price
- $400.00/TON
- Extension
- $618,400.00
- Proposal total
- $15,629,317
- vs. low bid
- +$5,841,690
- vs. engineer’s estimate
- +21.2%
7. Joe Bland Construction LLC
- Unit price
- $400.00/TON
- Extension
- $618,400.00
- Proposal total
- $18,492,861
- vs. low bid
- +$8,705,235
- vs. engineer’s estimate
- +21.2%
Proposal 1911-01-023 · let Sep 2, 2026 · Galveston County, Houston District
Line quantity 60 TON · Engineer’s estimate $350.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | R Construction Civil, LLCLOW BID | $350.00/TON | $21,000.00 | — | 0% | $3,199,825 | $407,818 (12.74%) left on table |
| 2 | James Construction Group, LLC | $371.53/TON | $22,291.80 | +$1,292 | +6.2% | $3,607,643 | +$407,818 |
| 3 | Isi Contracting, Inc. | $366.00/TON | $21,960.00 | +$960.00 | +4.6% | $3,636,684 | +$436,858 |
| 4 | Texas Steel Industrial Placing, LLC | $332.00/TON | $19,920.00 | -$1,080 | -5.1% | $3,701,646 | +$501,821 |
| 5 | Mc2 Civil, LLC | $350.00/TON | $21,000.00 | $0.000 | 0% | $3,727,075 | +$527,250 |
| 6 | Ser Construction Partners, LLC | $381.00/TON | $22,860.00 | +$1,860 | +8.9% | $3,807,901 | +$608,076 |
| 7 | Castillo Aranda LLC | $350.00/TON | $21,000.00 | $0.000 | 0% | $3,845,653 | +$645,828 |
| 8 | Forde Construction Company, Inc. | $360.00/TON | $21,600.00 | +$600.00 | +2.9% | $3,853,055 | +$653,230 |
| 9 | Ragle Construction, Inc. | $332.00/TON | $19,920.00 | -$1,080 | -5.1% | $3,992,820 | +$792,994 |
| 10 | John Reed and Company, LLC | $332.00/TON | $19,920.00 | -$1,080 | -5.1% | $4,065,253 | +$865,427 |
| 11 | Rexcon Enterprises, LLC | $340.00/TON | $20,400.00 | -$600.00 | -2.9% | $4,447,136 | +$1,247,311 |
- LOW BID · WINNER
- Unit price
- $350.00/TON
- Extension
- $21,000.00
- Proposal total
- $3,199,825
- Money left on the table
- $407,818 (12.74%)
- vs. engineer’s estimate
- 0%
- Unit price
- $371.53/TON
- Extension
- $22,291.80
- Proposal total
- $3,607,643
- vs. low bid
- +$407,818
- vs. engineer’s estimate
- +6.2%
- Unit price
- $366.00/TON
- Extension
- $21,960.00
- Proposal total
- $3,636,684
- vs. low bid
- +$436,858
- vs. engineer’s estimate
- +4.6%
- Unit price
- $332.00/TON
- Extension
- $19,920.00
- Proposal total
- $3,701,646
- vs. low bid
- +$501,821
- vs. engineer’s estimate
- -5.1%
- Unit price
- $350.00/TON
- Extension
- $21,000.00
- Proposal total
- $3,727,075
- vs. low bid
- +$527,250
- vs. engineer’s estimate
- 0%
- Unit price
- $381.00/TON
- Extension
- $22,860.00
- Proposal total
- $3,807,901
- vs. low bid
- +$608,076
- vs. engineer’s estimate
- +8.9%
- Unit price
- $350.00/TON
- Extension
- $21,000.00
- Proposal total
- $3,845,653
- vs. low bid
- +$645,828
- vs. engineer’s estimate
- 0%
- Unit price
- $360.00/TON
- Extension
- $21,600.00
- Proposal total
- $3,853,055
- vs. low bid
- +$653,230
- vs. engineer’s estimate
- +2.9%
- Unit price
- $332.00/TON
- Extension
- $19,920.00
- Proposal total
- $3,992,820
- vs. low bid
- +$792,994
- vs. engineer’s estimate
- -5.1%
10. John Reed and Company, LLC
- Unit price
- $332.00/TON
- Extension
- $19,920.00
- Proposal total
- $4,065,253
- vs. low bid
- +$865,427
- vs. engineer’s estimate
- -5.1%
11. Rexcon Enterprises, LLC
- Unit price
- $340.00/TON
- Extension
- $20,400.00
- Proposal total
- $4,447,136
- vs. low bid
- +$1,247,311
- vs. engineer’s estimate
- -2.9%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 2,986 | 4 | Mario Sinacola & Sons Excavating, Inc. | $320.00 | $305.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 1,546 | 7 | Big Creek Construction, Ltd. | $342.00 | $330.00 |
| 2026-09-02 | 1911-01-023 | Galveston | Houston | 60 | 11 | R Construction Civil, LLC | $350.00 | $350.00 |
| 2026-08-06 | 0114-10-102 | Washington | Bryan | 75 | 6 | Big Creek Construction, Ltd. | $350.00 | $344.00 |
| 2026-08-06 | 0420-01-051 | Jackson | Yoakum | 152 | 3 | Stx Civil | $330.02 | $360.00 |
| 2026-08-06 | 0610-05-060 | Bowie | Atlanta | 1,665 | 4 | East Texas Bridge, Inc. | $380.00 | $350.00 |
| 2026-08-06 | 0842-03-037 | Victoria | Yoakum | 3,152 | 3 | Ck Newberry, LLC | $315.00 | $255.00 |
| 2026-08-06 | 3510-04-069 | Fort Bend | Houston | 404 | 9 | James Construction Group, LLC | $348.06 | $350.00 |
| 2026-08-05 | 0027-08-147 | Fort Bend | Houston | 2,902 | 7 | Ser Construction Partners, LLC | $340.40 | $340.00 |
| 2026-08-05 | 0089-07-166 | Wharton | Yoakum | 2,960 | 3 | Williams Brothers Construction Co., Inc. | $350.00 | $360.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 12 | $351.00 | $350.50 | $360.00 | — |
| Amarillo | 6 | $470.00 | $425.15 | $330.00 | — |
| Atlanta | 4 | $380.00 | $397.50 | $350.00 | — |
| Beaumont | 7 | $375.40 | $371.40 | $165.00 | — |
| Bryan | 74 | $342.00 | $350.00 | $330.00 | +1.31% |
| Corpus Christi | 12 | $355.30 | $375.00 | $425.00 | — |
| Dallas | 25 | $320.00 | $384.75 | $305.00 | — |
| El Paso | 2 | $350.00 | $375.00 | $400.00 | — |
| Fort Worth | 27 | $360.60 | $369.81 | $280.00 | — |
| Houston | 129 | $335.60 | $334.00 | $330.00 | -2.78% |
| Laredo | 8 | $397.76 | $408.01 | $400.00 | — |
| Lufkin | 6 | $350.00 | $355.00 | $200.00 | — |
| Paris | 3 | $325.00 | $400.00 | $387.48 | — |
| Pharr | 6 | $394.00 | $369.30 | $521.86 | — |
| San Antonio | 50 | $355.35 | $341.00 | $320.00 | +5.91% |
| Tyler | 16 | — | $338.00 | — | — |
| Waco | 5 | $355.00 | $316.28 | $348.18 | — |
| Wichita Falls | 5 | $342.00 | $360.00 | $350.00 | — |
| Yoakum | 167 | $350.00 | $363.00 | $325.00 | +6.08% |
Related items
- 275-7001 · Cement ($220.00/TON)
- 341-7082 · Tack Coat ($4.00/GAL)
- 341-7001 · D-GR HMA TY-B PG64-22 ($85.40/TON)
- 341-7050 · D-GR HMA TY-D SAC-B PG70-22 ($125.00/TON)
- 344-7077 · Tack Coat ($4.50/GAL)
- 344-7001 · SP Mixes SP-B PG64-22 ($127.00/TON)
- 168-7001 · Vegetative Watering ($7.00/TGL)
- 164-7005 · Broadcast Seed (Temp_Warm) ($0.150/SY)