Broadcast Seed (Temp_Warm) (Item 164-7005): TxDOT Unit Price History

1,278 bids · 195 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure SY

TxDOT 164-7005 · BROADCAST SEED (TEMP_WARM) · Unit: SY

Low bid
$0.160/SY
Quantity-weighted median of winning unit prices
Weighted median
$0.150/SY
Quantity-weighted median of every bid
Engineer’s estimate
$0.160/SY
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-40%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1.00$2.00$3.00$4.00$5.00101001K10K100K1MQuantity (SY), log scaleUnit price ($/SY)
Winning (low) bid Other bid Fitted price curve (ln price = 2.52 − 0.415·ln qty, R² 0.44)320 plotted bids, 3 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 164-7005 (Broadcast Seed (Temp_Warm)) is measured in SY. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,278 bids for it on 195 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 619 bids was $0.150 per SY, and the winning low bidders priced it at a weighted median of $0.160 per SY.

Winning unit prices sat close to TxDOT's own engineer's estimate ($0.160 per SY), within two percent.

By calendar year, the median bid moved from $0.500 in 2025 (659 bids) to $0.300 in 2026 (557 bids), down 40.0%. The middle half of 2026 bids fell between $0.160 and $1.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 40%.

Quantity matters for this item. Lines of 25 to 1,307 SY had a weighted median of $1.00, while lines above 9,319 SY had $0.150, a 85% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 196 lines where both a winning and a second-place bid were published, the median winning unit price was $0.250 against $0.300 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 16 TxDOT districts with at least ten bids, Lufkin had the lowest weighted median ($0.110) and Waco the highest ($2.40). The busiest district for this item was Yoakum.

The most recent letting with this item was on Nov 4, 2026 in Jasper County, where Texas Materials Group, Inc. was the low bidder at $0.150 per SY for 7,070 SY against an estimate of $0.250.

Related items: 164-7006 Broadcast Seed (Temp_Cool) (weighted median $0.150 per SY); 162-7002 Block Sodding (weighted median $3.50 per SY); 168-7001 Vegetative Watering (weighted median $7.00 per TGL); 160-7002 Furn & Place Topsoil (4") (weighted median $1.35 per SY).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024628$0.770$0.250$1.00$0.460$3.44
2025659105$0.260$0.170$0.500$0.200$1.00
202655783$0.200$0.140$0.300$0.160$1.00

Quantity bands

BandQuantity (SY)BidsWeighted avgWeighted median25th–75th pct
Small25–1,307426$1.66$1.00$0.500–$2.50
Medium1,378–8,420431$0.630$0.400$0.250–$1.00
Large9,319–457,983421$0.180$0.150$0.130–$0.250

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.250
Median second-low unit price
$0.300
Median engineer’s estimate
$0.530
Median gap, second vs. low
+0%

196 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 1017-03-040 · let Nov 4, 2026 · Hunt County, Paris District

Line quantity 71,265 SY · Engineer’s estimate $0.100/SY

  • 1. Highway 19 Construction LLC

    LOW BID · WINNER
    Unit price
    $0.16/SY
    Extension
    $11,402.40
    Proposal total
    $6,803,596
    Money left on the table
    $438,151 (6.44%)
    vs. engineer’s estimate
    +60%
  • Unit price
    $0.12/SY
    Extension
    $8,195.48
    Proposal total
    $7,241,746
    vs. low bid
    +$438,151
    vs. engineer’s estimate
    +15%
  • Unit price
    $0.14/SY
    Extension
    $9,977.10
    Proposal total
    $7,366,754
    vs. low bid
    +$563,159
    vs. engineer’s estimate
    +40%
  • Unit price
    $0.16/SY
    Extension
    $11,402.40
    Proposal total
    $7,400,348
    vs. low bid
    +$596,752
    vs. engineer’s estimate
    +60%
  • Unit price
    $0.15/SY
    Extension
    $10,689.75
    Proposal total
    $7,514,717
    vs. low bid
    +$711,122
    vs. engineer’s estimate
    +50%
  • Unit price
    $0.32/SY
    Extension
    $22,804.80
    Proposal total
    $7,794,981
    vs. low bid
    +$991,385
    vs. engineer’s estimate
    +220%
  • Unit price
    $0.14/SY
    Extension
    $9,977.10
    Proposal total
    $7,795,159
    vs. low bid
    +$991,563
    vs. engineer’s estimate
    +40%
  • Unit price
    $0.15/SY
    Extension
    $10,689.75
    Proposal total
    $8,325,506
    vs. low bid
    +$1,521,910
    vs. engineer’s estimate
    +50%
  • Unit price
    $0.15/SY
    Extension
    $10,689.75
    Proposal total
    $9,159,173
    vs. low bid
    +$2,355,578
    vs. engineer’s estimate
    +50%

Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District

Line quantity 65,042 SY · Engineer’s estimate $0.170/SY

  • Unit price
    $0.16/SY
    Extension
    $10,406.72
    Proposal total
    $412,233,374
    Money left on the table
    $3,506,193 (0.85%)
    vs. engineer’s estimate
    -5.9%
  • 2. Pulice Construction, Inc.

    Unit price
    $0.17/SY
    Extension
    $11,057.14
    Proposal total
    $415,739,567
    vs. low bid
    +$3,506,193
    vs. engineer’s estimate
    0%
  • 3. Fluor Enterprises, Inc.

    Unit price
    $0.06/SY
    Extension
    $3,902.52
    Proposal total
    $473,353,333
    vs. low bid
    +$61,119,959
    vs. engineer’s estimate
    -64.7%
  • 4. Harper Brothers Construction LLC

    Unit price
    $0.06/SY
    Extension
    $3,902.52
    Proposal total
    $477,550,553
    vs. low bid
    +$65,317,180
    vs. engineer’s estimate
    -64.7%
  • Unit price
    $0.06/SY
    Extension
    $3,902.52
    Proposal total
    $477,564,067
    vs. low bid
    +$65,330,694
    vs. engineer’s estimate
    -64.7%
  • 6. Balfour Beatty Infrastructure, Inc.

    Unit price
    $0.16/SY
    Extension
    $10,406.72
    Proposal total
    $492,134,823
    vs. low bid
    +$79,901,450
    vs. engineer’s estimate
    -5.9%

Proposal 6497-19-001 · let Nov 3, 2026 · Travis County, Austin District

Line quantity 2,000 SY · Engineer’s estimate $0.500/SY

  • 1. Road Doctors LLC

    LOW BID · WINNER
    Unit price
    $2.00/SY
    Extension
    $4,000.00
    Proposal total
    $1,080,402
    Money left on the table
    $108,098 (10.01%)
    vs. engineer’s estimate
    +300%
  • Unit price
    $5.00/SY
    Extension
    $10,000.00
    Proposal total
    $1,188,500
    vs. low bid
    +$108,098
    vs. engineer’s estimate
    +900%
  • Unit price
    $1.00/SY
    Extension
    $2,000.00
    Proposal total
    $1,352,352
    vs. low bid
    +$271,950
    vs. engineer’s estimate
    +100%
  • Unit price
    $2.00/SY
    Extension
    $4,000.00
    Proposal total
    $1,394,989
    vs. low bid
    +$314,587
    vs. engineer’s estimate
    +300%
  • Unit price
    $2.10/SY
    Extension
    $4,200.00
    Proposal total
    $1,455,038
    vs. low bid
    +$374,636
    vs. engineer’s estimate
    +320%
  • 6. Garret Shields Infrastructure

    Unit price
    $0.50/SY
    Extension
    $1,000.00
    Proposal total
    $1,482,270
    vs. low bid
    +$401,868
    vs. engineer’s estimate
    0%
  • Unit price
    $2.00/SY
    Extension
    $4,000.00
    Proposal total
    $1,572,351
    vs. low bid
    +$491,949
    vs. engineer’s estimate
    +300%
  • 8. Restek, Inc.

    Unit price
    $2.65/SY
    Extension
    $5,300.00
    Proposal total
    $1,653,920
    vs. low bid
    +$573,518
    vs. engineer’s estimate
    +430%
  • Unit price
    $4.00/SY
    Extension
    $8,000.00
    Proposal total
    $1,712,690
    vs. low bid
    +$632,288
    vs. engineer’s estimate
    +700%
  • Unit price
    $0.50/SY
    Extension
    $1,000.00
    Proposal total
    $1,742,010
    vs. low bid
    +$661,608
    vs. engineer’s estimate
    0%
  • Unit price
    $0.01/SY
    Extension
    $20.00
    Proposal total
    $1,798,946
    vs. low bid
    +$718,544
    vs. engineer’s estimate
    -98%
  • Unit price
    $2.00/SY
    Extension
    $4,000.00
    Proposal total
    $2,056,221
    vs. low bid
    +$975,819
    vs. engineer’s estimate
    +300%
  • Unit price
    $3.00/SY
    Extension
    $6,000.00
    Proposal total
    $2,969,200
    vs. low bid
    +$1,888,798
    vs. engineer’s estimate
    +500%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040947-03-034JasperBeaumont7,0702Texas Materials Group, Inc.$0.150$0.250
2026-11-041017-03-040HuntParis71,2659Highway 19 Construction LLC$0.160$0.100
2026-11-030015-13-432TravisAustin65,0426Austin Bridge & Road Services, LP$0.160$0.170
2026-11-036497-19-001TravisAustin2,00013Road Doctors LLC$2.00$0.500
2026-10-070510-06-024FanninParis71,1536A. K. Gillis & Sons, LLC$0.150$0.160
2026-10-060410-02-047GraysonParis73,7477Highway 19 Construction LLC$0.500$0.160
2026-09-030573-02-008CaldwellAustin69,2828Hunter Industries, Ltd.$0.100$0.200
2026-09-030722-03-016Red RiverParis4,5278Longview Bridge and Road, Ltd.$0.150$0.400
2026-09-030901-19-198GraysonParis2,2238Rb Contracting, LLC$0.400$1.00
2026-09-031479-01-028BexarSan Antonio15,0026Hunter Industries, Ltd.$0.190$0.160

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene25$0.740$0.870$2.50—
Atlanta46$0.120$0.130$0.400-14.71%
Austin51$0.100$0.140$0.200-5.66%
Beaumont74$0.120$0.150$0.500+17.65%
Brownwood49$0.180$0.140$0.200-40.83%
Bryan61$0.140$0.200$0.190-31.58%
Corpus Christi47$0.150$0.650$1.00—
Fort Worth77$0.100$0.250$0.500-37.33%
Houston35$0.180$0.180$0.500-76%
Laredo3$0.200$0.300$0.750—
Lufkin116$0.250$0.110$0.150-77.78%
Paris174$0.160$0.150$0.160+10%
San Angelo8$0.350$1.84$3.00—
San Antonio40$0.150$0.160$0.160-7.5%
Tyler17$0.440$0.440$2.50—
Waco25$0.300$2.40$0.550—
Wichita Falls55$0.150$0.140$0.200-12.5%
Yoakum375$0.250$0.360$0.750-60%

Related items

Is your price for item 164-7005 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.