Furn & Place Topsoil (4") (Item 160-7002): TxDOT Unit Price History

1,524 bids · 227 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure SY

TxDOT 160-7002 · FURN & PLACE TOPSOIL (4") · Unit: SY

Low bid
$1.00/SY
Quantity-weighted median of winning unit prices
Weighted median
$1.35/SY
Quantity-weighted median of every bid
Engineer’s estimate
$1.50/SY
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-4.8%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$5.00$10.00$15.00$20.00$25.00101001K10K100K1MQuantity (SY), log scaleUnit price ($/SY)
Winning (low) bid Other bid Fitted price curve (ln price = 3.91 − 0.312·ln qty, R² 0.49)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 160-7002 (Furn & Place Topsoil (4")) is measured in SY. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,524 bids for it on 227 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 814 bids was $1.35 per SY, and the winning low bidders priced it at a weighted median of $1.00 per SY.

TxDOT's engineer's estimate for the same lines had a weighted median of $1.50 per SY, so winning bids came in 33.3% below the estimate.

By calendar year, the median bid moved from $4.00 in 2025 (760 bids) to $3.50 in 2026 (739 bids), down 12.5%. The middle half of 2026 bids fell between $1.70 and $6.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 4.8%.

Quantity matters for this item. Lines of 8 to 3,403 SY had a weighted median of $5.00, while lines above 20,670 SY had $1.43, a 71% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 224 lines where both a winning and a second-place bid were published, the median winning unit price was $3.00 against $3.07 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 18 TxDOT districts with at least ten bids, Pharr had the lowest weighted median ($0.500) and Dallas the highest ($10.00). The busiest district for this item was Austin.

The most recent letting with this item was on Nov 4, 2026 in Brazos County, where Fluor Enterprises, Inc. was the low bidder at $1.95 per SY for 166,415 SY against an estimate of $1.00.

6 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 162-7002 Block Sodding (weighted median $3.50 per SY); 164-7005 Broadcast Seed (Temp_Warm) (weighted median $0.150 per SY); 164-7006 Broadcast Seed (Temp_Cool) (weighted median $0.150 per SY); 168-7001 Vegetative Watering (weighted median $7.00 per TGL).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024254$3.70$3.25$3.50$2.70$6.50
2025760116$2.29$1.83$4.00$2.00$6.00
2026739107$1.84$1.35$3.50$1.70$6.00

Quantity bands

BandQuantity (SY)BidsWeighted avgWeighted median25th–75th pct
Small8–3,403509$6.96$5.00$4.00–$10.00
Medium3,430–20,587509$4.04$3.50$2.22–$5.00
Large20,670–750,353506$1.85$1.43$1.10–$3.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$3.00
Median second-low unit price
$3.07
Median engineer’s estimate
$3.00
Median gap, second vs. low
+0%

224 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 166,415 SY · Engineer’s estimate $1.00/SY

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $1.95/SY
    Extension
    $324,509.25
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +95%
  • Unit price
    $1.00/SY
    Extension
    $166,415.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    0%
  • Unit price
    $0.84/SY
    Extension
    $139,788.60
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -16%
  • Unit price
    $4.50/SY
    Extension
    $748,867.50
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +350%
  • Unit price
    $0.67/SY
    Extension
    $111,498.05
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -33%
  • Unit price
    $1.00/SY
    Extension
    $166,415.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    0%
  • Unit price
    $1.10/SY
    Extension
    $183,056.50
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    +10%
  • Unit price
    $1.20/SY
    Extension
    $199,698.00
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +20%
  • 9. Zachry Construction Corporation

    Unit price
    $0.59/SY
    Extension
    $98,184.85
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    -41%
  • 10. Brizo Construction, LLC

    Unit price
    $1.00/SY
    Extension
    $166,415.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    0%
  • Unit price
    $1.05/SY
    Extension
    $174,735.75
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    +5%
  • Unit price
    $4.26/SY
    Extension
    $708,927.90
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +326%

Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District

Line quantity 160,878 SY · Engineer’s estimate $0.750/SY

  • 1. Big Creek Construction, Ltd.

    LOW BID · WINNER
    Unit price
    $0.50/SY
    Extension
    $80,439.00
    Proposal total
    $9,787,627
    Money left on the table
    $395,153 (4.04%)
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $0.50/SY
    Extension
    $80,439.00
    Proposal total
    $10,182,780
    vs. low bid
    +$395,153
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $1.00/SY
    Extension
    $160,878.00
    Proposal total
    $10,424,591
    vs. low bid
    +$636,964
    vs. engineer’s estimate
    +33.3%
  • Unit price
    $0.50/SY
    Extension
    $80,439.00
    Proposal total
    $12,020,138
    vs. low bid
    +$2,232,511
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $1.50/SY
    Extension
    $241,317.00
    Proposal total
    $12,374,454
    vs. low bid
    +$2,586,827
    vs. engineer’s estimate
    +100%
  • 6. Patin Construction LLC

    Unit price
    $2.00/SY
    Extension
    $321,756.00
    Proposal total
    $15,629,317
    vs. low bid
    +$5,841,690
    vs. engineer’s estimate
    +166.7%
  • 7. Joe Bland Construction LLC

    Unit price
    $1.50/SY
    Extension
    $241,317.00
    Proposal total
    $18,492,861
    vs. low bid
    +$8,705,235
    vs. engineer’s estimate
    +100%

Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District

Line quantity 65,042 SY · Engineer’s estimate $2.00/SY

  • Unit price
    $7.00/SY
    Extension
    $455,294.00
    Proposal total
    $412,233,374
    Money left on the table
    $3,506,193 (0.85%)
    vs. engineer’s estimate
    +250%
  • 2. Pulice Construction, Inc.

    Unit price
    $5.13/SY
    Extension
    $333,665.46
    Proposal total
    $415,739,567
    vs. low bid
    +$3,506,193
    vs. engineer’s estimate
    +156.5%
  • 3. Fluor Enterprises, Inc.

    Unit price
    $10.30/SY
    Extension
    $669,932.60
    Proposal total
    $473,353,333
    vs. low bid
    +$61,119,959
    vs. engineer’s estimate
    +415%
  • 4. Harper Brothers Construction LLC

    Unit price
    $3.00/SY
    Extension
    $195,126.00
    Proposal total
    $477,550,553
    vs. low bid
    +$65,317,180
    vs. engineer’s estimate
    +50%
  • Unit price
    $2.22/SY
    Extension
    $144,393.24
    Proposal total
    $477,564,067
    vs. low bid
    +$65,330,694
    vs. engineer’s estimate
    +11%
  • 6. Balfour Beatty Infrastructure, Inc.

    Unit price
    $8.00/SY
    Extension
    $520,336.00
    Proposal total
    $492,134,823
    vs. low bid
    +$79,901,450
    vs. engineer’s estimate
    +300%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040212-03-058BrazosBryan166,41512Fluor Enterprises, Inc.$1.95$1.00
2026-11-040262-01-034MilamBryan160,8787Big Creek Construction, Ltd.$0.500$0.750
2026-11-030015-13-432TravisAustin65,0426Austin Bridge & Road Services, LP$7.00$2.00
2026-11-030917-30-068BurlesonBryan1,50415C & W Southern LLC$4.00$4.00
2026-10-060590-05-057MilamBryan2089Yoko Excavating, LLC$18.67$2.00
2026-10-062502-01-024BellWaco53,1476Big Creek Construction, Ltd.$1.00$1.50
2026-09-030051-09-127GalvestonHouston1,7777Castillo Aranda LLC$4.00$5.00
2026-09-030573-02-008CaldwellAustin69,2828Hunter Industries, Ltd.$0.870$1.50
2026-09-030917-31-036MadisonBryan1,9387Fuqua Construction Co., Inc.$1.29$4.00
2026-09-031479-01-028BexarSan Antonio30,0016Hunter Industries, Ltd.$1.09$2.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene23$2.50$4.00$1.90—
Amarillo9$5.45$6.00$7.00—
Atlanta43$1.00$2.00$2.50-48.75%
Austin297$1.56$2.50$2.00+6.67%
Beaumont22$4.50$4.00$4.00—
Brownwood11$4.25$3.96$5.00—
Bryan284$0.750$1.05$1.00+37.25%
Corpus Christi80$2.00$2.55$2.00-28.6%
Dallas24$25.00$10.00$4.00—
Fort Worth77$3.30$3.30$5.00-32.24%
Houston29$4.00$4.00$1.50—
Lubbock10$1.00$1.92$1.20—
Lufkin44$0.250$1.38$3.00—
Odessa12$1.20$7.00$11.00—
Pharr56$0.400$0.500$1.50+25%
San Angelo9$9.43$7.00$2.00—
San Antonio110$1.09$1.62$2.00-36%
Tyler178$1.40$1.25$1.50-50%
Waco143$0.590$0.590$0.750+10%
Wichita Falls4$1.00$1.78$3.00—
Yoakum59$8.00$3.75$10.00—

Related items

Is your price for item 160-7002 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.