Broadcast Seed (Temp_Cool) (Item 164-7006): TxDOT Unit Price History
1,201 bids · 182 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure SY
TxDOT 164-7006 · BROADCAST SEED (TEMP_COOL) · Unit: SY
- Low bid
- $0.160/SY
- Quantity-weighted median of winning unit prices
- Weighted median
- $0.150/SY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $0.160/SY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -40%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 164-7006 (Broadcast Seed (Temp_Cool)) is measured in SY. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,201 bids for it on 182 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 570 bids was $0.150 per SY, and the winning low bidders priced it at a weighted median of $0.160 per SY.
Winning unit prices sat close to TxDOT's own engineer's estimate ($0.160 per SY), within two percent.
By calendar year, the median bid moved from $0.500 in 2025 (639 bids) to $0.300 in 2026 (511 bids), down 40.0%. The middle half of 2026 bids fell between $0.160 and $0.830.
Comparing the last 12 months with the 12 months before, the median unit price fell 40%.
Quantity matters for this item. Lines of 25 to 1,420 SY had a weighted median of $1.00, while lines above 9,932 SY had $0.150, a 85% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 182 lines where both a winning and a second-place bid were published, the median winning unit price was $0.250 against $0.300 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 15 TxDOT districts with at least ten bids, Lufkin had the lowest weighted median ($0.110) and Corpus Christi the highest ($2.45). The busiest district for this item was Yoakum.
The most recent letting with this item was on Nov 4, 2026 in Jasper County, where Texas Materials Group, Inc. was the low bidder at $0.150 per SY for 7,070 SY against an estimate of $0.250.
Related items: 164-7005 Broadcast Seed (Temp_Warm) (weighted median $0.150 per SY); 162-7002 Block Sodding (weighted median $3.50 per SY); 168-7001 Vegetative Watering (weighted median $7.00 per TGL); 160-7002 Furn & Place Topsoil (4") (weighted median $1.35 per SY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 51 | 7 | $0.770 | $0.250 | $1.00 | $0.550 | $3.13 |
| 2025 | 639 | 101 | $0.260 | $0.170 | $0.500 | $0.200 | $1.00 |
| 2026 | 511 | 75 | $0.200 | $0.150 | $0.300 | $0.160 | $0.830 |
Quantity bands
| Band | Quantity (SY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 25–1,420 | 409 | $1.57 | $1.00 | $0.500–$2.35 |
| Medium | 1,445–9,600 | 393 | $0.600 | $0.350 | $0.260–$1.00 |
| Large | 9,932–457,983 | 399 | $0.190 | $0.150 | $0.130–$0.240 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $0.250
- Median second-low unit price
- $0.300
- Median engineer’s estimate
- $0.500
- Median gap, second vs. low
- +0%
182 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 1017-03-040 · let Nov 4, 2026 · Hunt County, Paris District
Line quantity 71,265 SY · Engineer’s estimate $0.100/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway 19 Construction LLCLOW BID | $0.16/SY | $11,402.40 | — | +60% | $6,803,596 | $438,151 (6.44%) left on table |
| 2 | Thk Construction LLC | $0.12/SY | $8,195.48 | -$3,207 | +15% | $7,241,746 | +$438,151 |
| 3 | East Texas Bridge, Inc. | $0.14/SY | $9,977.10 | -$1,425 | +40% | $7,366,754 | +$563,159 |
| 4 | D. L. Lennon Incorporated - Contractor | $0.16/SY | $11,402.40 | $0.000 | +60% | $7,400,348 | +$596,752 |
| 5 | Rk Hall, LLC | $0.15/SY | $10,689.75 | -$712.65 | +50% | $7,514,717 | +$711,122 |
| 6 | Austin Bridge & Road Services, LP | $0.32/SY | $22,804.80 | +$11,402 | +220% | $7,794,981 | +$991,385 |
| 7 | Texas Materials Group, Inc. | $0.14/SY | $9,977.10 | -$1,425 | +40% | $7,795,159 | +$991,563 |
| 8 | Cdm Holdings | $0.15/SY | $10,689.75 | -$712.65 | +50% | $8,325,506 | +$1,521,910 |
| 9 | Ed Bell Construction Company | $0.15/SY | $10,689.75 | -$712.65 | +50% | $9,159,173 | +$2,355,578 |
1. Highway 19 Construction LLC
LOW BID · WINNER- Unit price
- $0.16/SY
- Extension
- $11,402.40
- Proposal total
- $6,803,596
- Money left on the table
- $438,151 (6.44%)
- vs. engineer’s estimate
- +60%
- Unit price
- $0.12/SY
- Extension
- $8,195.48
- Proposal total
- $7,241,746
- vs. low bid
- +$438,151
- vs. engineer’s estimate
- +15%
- Unit price
- $0.14/SY
- Extension
- $9,977.10
- Proposal total
- $7,366,754
- vs. low bid
- +$563,159
- vs. engineer’s estimate
- +40%
- Unit price
- $0.16/SY
- Extension
- $11,402.40
- Proposal total
- $7,400,348
- vs. low bid
- +$596,752
- vs. engineer’s estimate
- +60%
5. Rk Hall, LLC
- Unit price
- $0.15/SY
- Extension
- $10,689.75
- Proposal total
- $7,514,717
- vs. low bid
- +$711,122
- vs. engineer’s estimate
- +50%
- Unit price
- $0.32/SY
- Extension
- $22,804.80
- Proposal total
- $7,794,981
- vs. low bid
- +$991,385
- vs. engineer’s estimate
- +220%
- Unit price
- $0.14/SY
- Extension
- $9,977.10
- Proposal total
- $7,795,159
- vs. low bid
- +$991,563
- vs. engineer’s estimate
- +40%
8. Cdm Holdings
- Unit price
- $0.15/SY
- Extension
- $10,689.75
- Proposal total
- $8,325,506
- vs. low bid
- +$1,521,910
- vs. engineer’s estimate
- +50%
- Unit price
- $0.15/SY
- Extension
- $10,689.75
- Proposal total
- $9,159,173
- vs. low bid
- +$2,355,578
- vs. engineer’s estimate
- +50%
Proposal 0015-13-432 · let Nov 3, 2026 · Travis County, Austin District
Line quantity 65,042 SY · Engineer’s estimate $0.200/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Austin Bridge & Road Services, LPLOW BID | $0.16/SY | $10,406.72 | — | -20% | $412,233,374 | $3,506,193 (0.85%) left on table |
| 2 | Pulice Construction, Inc. | $0.17/SY | $11,057.14 | +$650.42 | -15% | $415,739,567 | +$3,506,193 |
| 3 | Fluor Enterprises, Inc. | $0.08/SY | $5,203.36 | -$5,203 | -60% | $473,353,333 | +$61,119,959 |
| 4 | Harper Brothers Construction LLC | $0.08/SY | $5,203.36 | -$5,203 | -60% | $477,550,553 | +$65,317,180 |
| 5 | Webber, LLC | $0.08/SY | $5,203.36 | -$5,203 | -60% | $477,564,067 | +$65,330,694 |
| 6 | Balfour Beatty Infrastructure, Inc. | $0.16/SY | $10,406.72 | $0.000 | -20% | $492,134,823 | +$79,901,450 |
1. Austin Bridge & Road Services, LP
LOW BID · WINNER- Unit price
- $0.16/SY
- Extension
- $10,406.72
- Proposal total
- $412,233,374
- Money left on the table
- $3,506,193 (0.85%)
- vs. engineer’s estimate
- -20%
2. Pulice Construction, Inc.
- Unit price
- $0.17/SY
- Extension
- $11,057.14
- Proposal total
- $415,739,567
- vs. low bid
- +$3,506,193
- vs. engineer’s estimate
- -15%
3. Fluor Enterprises, Inc.
- Unit price
- $0.08/SY
- Extension
- $5,203.36
- Proposal total
- $473,353,333
- vs. low bid
- +$61,119,959
- vs. engineer’s estimate
- -60%
4. Harper Brothers Construction LLC
- Unit price
- $0.08/SY
- Extension
- $5,203.36
- Proposal total
- $477,550,553
- vs. low bid
- +$65,317,180
- vs. engineer’s estimate
- -60%
5. Webber, LLC
- Unit price
- $0.08/SY
- Extension
- $5,203.36
- Proposal total
- $477,564,067
- vs. low bid
- +$65,330,694
- vs. engineer’s estimate
- -60%
6. Balfour Beatty Infrastructure, Inc.
- Unit price
- $0.16/SY
- Extension
- $10,406.72
- Proposal total
- $492,134,823
- vs. low bid
- +$79,901,450
- vs. engineer’s estimate
- -20%
Proposal 6497-19-001 · let Nov 3, 2026 · Travis County, Austin District
Line quantity 2,000 SY · Engineer’s estimate $0.350/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Road Doctors LLCLOW BID | $2.00/SY | $4,000.00 | — | +471.4% | $1,080,402 | $108,098 (10.01%) left on table |
| 2 | Digg Commercial, LLC | $0.01/SY | $20.00 | -$3,980 | -97.1% | $1,188,500 | +$108,098 |
| 3 | The Truesdell Corporation | $1.00/SY | $2,000.00 | -$2,000 | +185.7% | $1,352,352 | +$271,950 |
| 4 | Structural Integrity Group LLC | $2.00/SY | $4,000.00 | $0.000 | +471.4% | $1,394,989 | +$314,587 |
| 5 | Icos Management, LLC | $2.10/SY | $4,200.00 | +$200.00 | +500% | $1,455,038 | +$374,636 |
| 6 | Garret Shields Infrastructure | $0.50/SY | $1,000.00 | -$3,000 | +42.9% | $1,482,270 | +$401,868 |
| 7 | Premier Contractors LLC | $2.00/SY | $4,000.00 | $0.000 | +471.4% | $1,572,351 | +$491,949 |
| 8 | Restek, Inc. | $2.65/SY | $5,300.00 | +$1,300 | +657.1% | $1,653,920 | +$573,518 |
| 9 | Scr Civil Construction, LLC | $2.40/SY | $4,800.00 | +$800.00 | +585.7% | $1,712,690 | +$632,288 |
| 10 | Taylor Bridge LLC | $0.50/SY | $1,000.00 | -$3,000 | +42.9% | $1,742,010 | +$661,608 |
| 11 | Blacksmith Ventures LLC | $0.01/SY | $20.00 | -$3,980 | -97.1% | $1,798,946 | +$718,544 |
| 12 | Rear Contractors LLC | $2.00/SY | $4,000.00 | $0.000 | +471.4% | $2,056,221 | +$975,819 |
| 13 | Southern Road & Bridge, LLC | $3.00/SY | $6,000.00 | +$2,000 | +757.1% | $2,969,200 | +$1,888,798 |
- LOW BID · WINNER
- Unit price
- $2.00/SY
- Extension
- $4,000.00
- Proposal total
- $1,080,402
- Money left on the table
- $108,098 (10.01%)
- vs. engineer’s estimate
- +471.4%
- Unit price
- $0.01/SY
- Extension
- $20.00
- Proposal total
- $1,188,500
- vs. low bid
- +$108,098
- vs. engineer’s estimate
- -97.1%
- Unit price
- $1.00/SY
- Extension
- $2,000.00
- Proposal total
- $1,352,352
- vs. low bid
- +$271,950
- vs. engineer’s estimate
- +185.7%
- Unit price
- $2.00/SY
- Extension
- $4,000.00
- Proposal total
- $1,394,989
- vs. low bid
- +$314,587
- vs. engineer’s estimate
- +471.4%
- Unit price
- $2.10/SY
- Extension
- $4,200.00
- Proposal total
- $1,455,038
- vs. low bid
- +$374,636
- vs. engineer’s estimate
- +500%
6. Garret Shields Infrastructure
- Unit price
- $0.50/SY
- Extension
- $1,000.00
- Proposal total
- $1,482,270
- vs. low bid
- +$401,868
- vs. engineer’s estimate
- +42.9%
- Unit price
- $2.00/SY
- Extension
- $4,000.00
- Proposal total
- $1,572,351
- vs. low bid
- +$491,949
- vs. engineer’s estimate
- +471.4%
8. Restek, Inc.
- Unit price
- $2.65/SY
- Extension
- $5,300.00
- Proposal total
- $1,653,920
- vs. low bid
- +$573,518
- vs. engineer’s estimate
- +657.1%
- Unit price
- $2.40/SY
- Extension
- $4,800.00
- Proposal total
- $1,712,690
- vs. low bid
- +$632,288
- vs. engineer’s estimate
- +585.7%
- Unit price
- $0.50/SY
- Extension
- $1,000.00
- Proposal total
- $1,742,010
- vs. low bid
- +$661,608
- vs. engineer’s estimate
- +42.9%
- Unit price
- $0.01/SY
- Extension
- $20.00
- Proposal total
- $1,798,946
- vs. low bid
- +$718,544
- vs. engineer’s estimate
- -97.1%
- Unit price
- $2.00/SY
- Extension
- $4,000.00
- Proposal total
- $2,056,221
- vs. low bid
- +$975,819
- vs. engineer’s estimate
- +471.4%
- Unit price
- $3.00/SY
- Extension
- $6,000.00
- Proposal total
- $2,969,200
- vs. low bid
- +$1,888,798
- vs. engineer’s estimate
- +757.1%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 7,070 | 2 | Texas Materials Group, Inc. | $0.150 | $0.250 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 71,265 | 9 | Highway 19 Construction LLC | $0.160 | $0.100 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 65,042 | 6 | Austin Bridge & Road Services, LP | $0.160 | $0.200 |
| 2026-11-03 | 6497-19-001 | Travis | Austin | 2,000 | 13 | Road Doctors LLC | $2.00 | $0.350 |
| 2026-10-07 | 0510-06-024 | Fannin | Paris | 71,153 | 6 | A. K. Gillis & Sons, LLC | $0.150 | $0.160 |
| 2026-10-06 | 0410-02-047 | Grayson | Paris | 73,747 | 7 | Highway 19 Construction LLC | $0.500 | $0.160 |
| 2026-09-03 | 0573-02-008 | Caldwell | Austin | 69,282 | 8 | Hunter Industries, Ltd. | $0.110 | $0.200 |
| 2026-09-03 | 0722-03-016 | Red River | Paris | 4,527 | 8 | Longview Bridge and Road, Ltd. | $0.150 | $0.300 |
| 2026-09-03 | 0901-19-198 | Grayson | Paris | 2,223 | 8 | Rb Contracting, LLC | $0.410 | $1.00 |
| 2026-09-03 | 1479-01-028 | Bexar | San Antonio | 15,002 | 6 | Hunter Industries, Ltd. | $0.190 | $0.170 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 25 | $0.740 | $0.870 | $2.50 | — |
| Atlanta | 46 | $0.120 | $0.130 | $0.400 | -34.09% |
| Austin | 41 | $0.110 | $0.140 | $0.200 | -20.93% |
| Beaumont | 59 | $0.120 | $0.150 | $0.500 | -46% |
| Brownwood | 49 | $0.180 | $0.170 | $0.200 | -50% |
| Bryan | 61 | $0.140 | $0.200 | $0.200 | -31.58% |
| Corpus Christi | 35 | $2.00 | $2.45 | $0.750 | — |
| Fort Worth | 74 | $1.30 | $0.260 | $0.600 | -67.74% |
| Lufkin | 127 | $0.250 | $0.110 | $0.150 | -77.59% |
| Paris | 177 | $0.160 | $0.150 | $0.160 | +20% |
| San Angelo | 8 | $0.350 | $1.73 | $3.00 | — |
| San Antonio | 40 | $0.150 | $0.160 | $0.200 | -2.5% |
| Tyler | 17 | $0.440 | $0.440 | $2.50 | — |
| Waco | 18 | $0.120 | $0.120 | $0.200 | — |
| Wichita Falls | 55 | $0.150 | $0.140 | $0.200 | -14.71% |
| Yoakum | 369 | $0.250 | $0.370 | $0.750 | -60% |
Related items
- 164-7005 · Broadcast Seed (Temp_Warm) ($0.150/SY)
- 162-7002 · Block Sodding ($3.50/SY)
- 168-7001 · Vegetative Watering ($7.00/TGL)
- 160-7002 · Furn & Place Topsoil (4") ($1.35/SY)
- 132-7003 · Embank (FNL)(OC)(TY B) ($15.00/CY)
- 132-7006 · Embank (FNL)(DC)(TY C) ($12.00/CY)
- 132-7005 · Embank (FNL)(OC)(TY C) ($15.00/CY)
- 110-7001 · Excav (Roadway) ($10.00/CY)