WK ZN PAV MRK SHT Term (TAB)TY Y-2 (Item 662-7114): TxDOT Unit Price History

2,369 bids · 478 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure EA

TxDOT 662-7114 · WK ZN PAV MRK SHT TERM (TAB)TY Y-2 · Unit: EA

Low bid
$1.00/EA
Quantity-weighted median of winning unit prices
Weighted median
$1.00/EA
Quantity-weighted median of every bid
Engineer’s estimate
$1.00/EA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-7.98%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$2.00$4.00$6.00$8.001101001K10K100KQuantity (EA), log scaleUnit price ($/EA)
Winning (low) bid Other bid Fitted price curve (ln price = 1.46 − 0.135·ln qty, R² 0.11)320 plotted bids, 4 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 662-7114 (WK ZN PAV MRK SHT Term (TAB)TY Y-2) is measured in EA. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 2,369 bids for it on 478 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,194 bids was $1.00 per EA, and the winning low bidders priced it at a weighted median of $1.00 per EA.

Winning unit prices sat close to TxDOT's own engineer's estimate ($1.00 per EA), within two percent.

By calendar year, the median bid moved from $1.63 in 2025 (1,199 bids) to $1.50 in 2026 (1,097 bids), down 8.0%. The middle half of 2026 bids fell between $1.00 and $2.25.

Comparing the last 12 months with the 12 months before, the median unit price fell 7.98%.

Quantity matters for this item. Lines of 4 to 900 EA had a weighted median of $2.00, while lines above 3,808 EA had $1.00, a 50% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 417 lines where both a winning and a second-place bid were published, the median winning unit price was $1.50 against $1.50 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, San Antonio had the lowest weighted median ($0.500) and El Paso the highest ($2.50). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $5.76 per EA for 68 EA against an estimate of $2.00.

167 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 662-7112 WK ZN PAV MRK SHT Term (TAB)TY W (weighted median $1.08 per EA); 662-7038 WK ZN PAV MRK NON-Remov (Y)6"(SLD) (weighted median $0.220 per LF); 662-7008 WK ZN PAV MRK NON-Remov (W)6"(SLD) (weighted median $0.250 per LF); 662-7100 WK ZN PAV MRK Remov (Y)6"(SLD) (weighted median $0.800 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20247325$2.31$1.00$1.50$1.00$2.10
20251,199243$1.69$1.30$1.63$1.02$2.50
20261,097210$1.43$1.00$1.50$1.00$2.25

Quantity bands

BandQuantity (EA)BidsWeighted avgWeighted median25th–75th pct
Small4–900792$2.62$2.00$1.07–$3.61
Medium903–3,746787$1.85$1.50$1.00–$2.20
Large3,808–129,746790$1.57$1.00$1.00–$2.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$1.50
Median second-low unit price
$1.50
Median engineer’s estimate
$1.50
Median gap, second vs. low
+0%

417 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District

Line quantity 68 EA · Engineer’s estimate $2.00/EA

  • 1. Ti-Zack Concrete, LLC

    LOW BID · WINNER
    Unit price
    $5.76/EA
    Extension
    $391.48
    Proposal total
    $734,629
    Money left on the table
    $59,414 (8.09%)
    vs. engineer’s estimate
    +187.9%
  • Unit price
    $1.00/EA
    Extension
    $68.00
    Proposal total
    $794,043
    vs. low bid
    +$59,414
    vs. engineer’s estimate
    -50%
  • Unit price
    $2.50/EA
    Extension
    $170.00
    Proposal total
    $852,064
    vs. low bid
    +$117,434
    vs. engineer’s estimate
    +25%
  • Unit price
    $4.50/EA
    Extension
    $306.00
    Proposal total
    $863,606
    vs. low bid
    +$128,977
    vs. engineer’s estimate
    +125%
  • Unit price
    $5.00/EA
    Extension
    $340.00
    Proposal total
    $916,535
    vs. low bid
    +$181,906
    vs. engineer’s estimate
    +150%
  • Unit price
    $2.10/EA
    Extension
    $142.80
    Proposal total
    $974,652
    vs. low bid
    +$240,023
    vs. engineer’s estimate
    +5%
  • Unit price
    $10.00/EA
    Extension
    $680.00
    Proposal total
    $981,238
    vs. low bid
    +$246,609
    vs. engineer’s estimate
    +400%

Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District

Line quantity 2,788 EA · Engineer’s estimate $1.26/EA

  • 1. Bobcat Services, Inc.

    LOW BID · WINNER
    Unit price
    $0.50/EA
    Extension
    $1,394.00
    Proposal total
    $2,797,454
    Money left on the table
    $386,828 (13.83%)
    vs. engineer’s estimate
    -60.3%
  • Unit price
    $1.72/EA
    Extension
    $4,795.36
    Proposal total
    $3,184,282
    vs. low bid
    +$386,828
    vs. engineer’s estimate
    +36.5%
  • Unit price
    $1.75/EA
    Extension
    $4,879.00
    Proposal total
    $3,495,937
    vs. low bid
    +$698,482
    vs. engineer’s estimate
    +38.9%
  • Unit price
    $1.50/EA
    Extension
    $4,182.00
    Proposal total
    $3,586,449
    vs. low bid
    +$788,995
    vs. engineer’s estimate
    +19%
  • Unit price
    $0.50/EA
    Extension
    $1,394.00
    Proposal total
    $3,801,261
    vs. low bid
    +$1,003,807
    vs. engineer’s estimate
    -60.3%
  • Unit price
    $0.70/EA
    Extension
    $1,951.60
    Proposal total
    $3,825,058
    vs. low bid
    +$1,027,604
    vs. engineer’s estimate
    -44.4%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 4,897 EA · Engineer’s estimate $1.70/EA

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $1.00/EA
    Extension
    $4,897.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    -41.2%
  • Unit price
    $1.50/EA
    Extension
    $7,345.50
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    -11.8%
  • Unit price
    $1.00/EA
    Extension
    $4,897.00
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -41.2%
  • Unit price
    $0.10/EA
    Extension
    $489.70
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    -94.1%
  • Unit price
    $5.00/EA
    Extension
    $24,485.00
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    +194.1%
  • Unit price
    $1.00/EA
    Extension
    $4,897.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -41.2%
  • Unit price
    $1.07/EA
    Extension
    $5,239.79
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -37.1%
  • Unit price
    $1.20/EA
    Extension
    $5,876.40
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    -29.4%
  • 9. Zachry Construction Corporation

    Unit price
    $1.08/EA
    Extension
    $5,288.76
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    -36.5%
  • 10. Brizo Construction, LLC

    Unit price
    $4.40/EA
    Extension
    $21,546.80
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +158.8%
  • Unit price
    $1.50/EA
    Extension
    $7,345.50
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -11.8%
  • Unit price
    $0.97/EA
    Extension
    $4,750.09
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    -42.9%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-126504-61-001PotterAmarillo687Ti-Zack Concrete, LLC$5.76$2.00
2026-11-040009-06-056HuntParis31,4001Cdm Holdings$1.00$0.900
2026-11-040016-03-125HaysAustin2,7886Bobcat Services, Inc.$0.500$1.26
2026-11-040052-04-054LambLubbock47,5681Lipham Asphalt and Paving Company, LLC$1.00$1.10
2026-11-040066-03-045ShermanAmarillo25,6471Breedon Investments USA Inc.$0.600$1.00
2026-11-040212-03-058BrazosBryan4,89712Fluor Enterprises, Inc.$1.00$1.70
2026-11-040262-01-034MilamBryan5,4647Big Creek Construction, Ltd.$1.50$1.30
2026-11-040947-03-034JasperBeaumont1,1502Texas Materials Group, Inc.$1.50$1.83
2026-11-041017-03-040HuntParis1,3949Highway 19 Construction LLC$2.00$1.85
2026-11-041052-02-098NuecesCorpus Christi7875J E Construction Services, LLC$3.00$1.50

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene95$1.00$1.00$1.00-35.48%
Amarillo62$0.600$1.40$1.00-35.19%
Atlanta33—$1.00——
Austin219$0.950$1.63$1.00-9.44%
Beaumont115$2.00$0.560$1.45-15.41%
Brownwood86$0.500$1.00$1.00+19.05%
Bryan152$1.50$1.08$1.70-26.67%
Childress33$1.40$1.40$1.65-8.06%
Corpus Christi104$1.30$1.25$1.50-27.5%
Dallas286$2.45$1.50$1.60-18.37%
El Paso29$1.00$2.50$0.650+8.93%
Fort Worth106$2.25$1.00$1.00-41.5%
Houston63$1.40$1.00$1.88—
Laredo27$2.00$1.07$1.65-18.13%
Lubbock40$1.00$1.00$1.10-3.23%
Lufkin81$2.50$1.07$0.8000%
Odessa68$1.50$1.50$0.500+12.28%
Paris128$1.00$1.00$1.05-8.26%
Pharr100$1.29$1.11$1.00-7.5%
San Angelo12$3.56$0.600$1.55—
San Antonio156$0.150$0.500$1.00-34.25%
Tyler90$1.75$1.00$0.6500%
Waco88$0.500$0.950$0.640-33.33%
Wichita Falls42$0.700$1.25$1.54-39.25%
Yoakum154$1.53$1.53$1.50+9.29%

Related items

Is your price for item 662-7114 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.