WK ZN PAV MRK SHT Term (TAB)TY Y-2 (Item 662-7114): TxDOT Unit Price History
2,369 bids · 478 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure EA
TxDOT 662-7114 · WK ZN PAV MRK SHT TERM (TAB)TY Y-2 · Unit: EA
- Low bid
- $1.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $1.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $1.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -7.98%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 662-7114 (WK ZN PAV MRK SHT Term (TAB)TY Y-2) is measured in EA. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 2,369 bids for it on 478 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,194 bids was $1.00 per EA, and the winning low bidders priced it at a weighted median of $1.00 per EA.
Winning unit prices sat close to TxDOT's own engineer's estimate ($1.00 per EA), within two percent.
By calendar year, the median bid moved from $1.63 in 2025 (1,199 bids) to $1.50 in 2026 (1,097 bids), down 8.0%. The middle half of 2026 bids fell between $1.00 and $2.25.
Comparing the last 12 months with the 12 months before, the median unit price fell 7.98%.
Quantity matters for this item. Lines of 4 to 900 EA had a weighted median of $2.00, while lines above 3,808 EA had $1.00, a 50% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 417 lines where both a winning and a second-place bid were published, the median winning unit price was $1.50 against $1.50 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, San Antonio had the lowest weighted median ($0.500) and El Paso the highest ($2.50). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $5.76 per EA for 68 EA against an estimate of $2.00.
167 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 662-7112 WK ZN PAV MRK SHT Term (TAB)TY W (weighted median $1.08 per EA); 662-7038 WK ZN PAV MRK NON-Remov (Y)6"(SLD) (weighted median $0.220 per LF); 662-7008 WK ZN PAV MRK NON-Remov (W)6"(SLD) (weighted median $0.250 per LF); 662-7100 WK ZN PAV MRK Remov (Y)6"(SLD) (weighted median $0.800 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 73 | 25 | $2.31 | $1.00 | $1.50 | $1.00 | $2.10 |
| 2025 | 1,199 | 243 | $1.69 | $1.30 | $1.63 | $1.02 | $2.50 |
| 2026 | 1,097 | 210 | $1.43 | $1.00 | $1.50 | $1.00 | $2.25 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 4–900 | 792 | $2.62 | $2.00 | $1.07–$3.61 |
| Medium | 903–3,746 | 787 | $1.85 | $1.50 | $1.00–$2.20 |
| Large | 3,808–129,746 | 790 | $1.57 | $1.00 | $1.00–$2.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $1.50
- Median second-low unit price
- $1.50
- Median engineer’s estimate
- $1.50
- Median gap, second vs. low
- +0%
417 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District
Line quantity 68 EA · Engineer’s estimate $2.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLCLOW BID | $5.76/EA | $391.48 | — | +187.9% | $734,629 | $59,414 (8.09%) left on table |
| 2 | Cross Plus Construction, LLC | $1.00/EA | $68.00 | -$323.48 | -50% | $794,043 | +$59,414 |
| 3 | Structural Integrity Group LLC | $2.50/EA | $170.00 | -$221.48 | +25% | $852,064 | +$117,434 |
| 4 | Pathfield Investments LLC | $4.50/EA | $306.00 | -$85.48 | +125% | $863,606 | +$128,977 |
| 5 | Scr Civil Construction, LLC | $5.00/EA | $340.00 | -$51.48 | +150% | $916,535 | +$181,906 |
| 6 | Icos Management, LLC | $2.10/EA | $142.80 | -$248.68 | +5% | $974,652 | +$240,023 |
| 7 | Road Doctors LLC | $10.00/EA | $680.00 | +$288.52 | +400% | $981,238 | +$246,609 |
- LOW BID · WINNER
- Unit price
- $5.76/EA
- Extension
- $391.48
- Proposal total
- $734,629
- Money left on the table
- $59,414 (8.09%)
- vs. engineer’s estimate
- +187.9%
- Unit price
- $1.00/EA
- Extension
- $68.00
- Proposal total
- $794,043
- vs. low bid
- +$59,414
- vs. engineer’s estimate
- -50%
- Unit price
- $2.50/EA
- Extension
- $170.00
- Proposal total
- $852,064
- vs. low bid
- +$117,434
- vs. engineer’s estimate
- +25%
- Unit price
- $4.50/EA
- Extension
- $306.00
- Proposal total
- $863,606
- vs. low bid
- +$128,977
- vs. engineer’s estimate
- +125%
- Unit price
- $5.00/EA
- Extension
- $340.00
- Proposal total
- $916,535
- vs. low bid
- +$181,906
- vs. engineer’s estimate
- +150%
- Unit price
- $2.10/EA
- Extension
- $142.80
- Proposal total
- $974,652
- vs. low bid
- +$240,023
- vs. engineer’s estimate
- +5%
- Unit price
- $10.00/EA
- Extension
- $680.00
- Proposal total
- $981,238
- vs. low bid
- +$246,609
- vs. engineer’s estimate
- +400%
Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District
Line quantity 2,788 EA · Engineer’s estimate $1.26/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Bobcat Services, Inc.LOW BID | $0.50/EA | $1,394.00 | — | -60.3% | $2,797,454 | $386,828 (13.83%) left on table |
| 2 | Hunter Industries, Ltd. | $1.72/EA | $4,795.36 | +$3,401 | +36.5% | $3,184,282 | +$386,828 |
| 3 | Dean Word Company, Ltd. | $1.75/EA | $4,879.00 | +$3,485 | +38.9% | $3,495,937 | +$698,482 |
| 4 | Texas Materials Group, Inc. | $1.50/EA | $4,182.00 | +$2,788 | +19% | $3,586,449 | +$788,995 |
| 5 | Lone Star Paving Company | $0.50/EA | $1,394.00 | $0.000 | -60.3% | $3,801,261 | +$1,003,807 |
| 6 | Clark Construction of Texas, Inc. | $0.70/EA | $1,951.60 | +$557.60 | -44.4% | $3,825,058 | +$1,027,604 |
1. Bobcat Services, Inc.
LOW BID · WINNER- Unit price
- $0.50/EA
- Extension
- $1,394.00
- Proposal total
- $2,797,454
- Money left on the table
- $386,828 (13.83%)
- vs. engineer’s estimate
- -60.3%
- Unit price
- $1.72/EA
- Extension
- $4,795.36
- Proposal total
- $3,184,282
- vs. low bid
- +$386,828
- vs. engineer’s estimate
- +36.5%
- Unit price
- $1.75/EA
- Extension
- $4,879.00
- Proposal total
- $3,495,937
- vs. low bid
- +$698,482
- vs. engineer’s estimate
- +38.9%
- Unit price
- $1.50/EA
- Extension
- $4,182.00
- Proposal total
- $3,586,449
- vs. low bid
- +$788,995
- vs. engineer’s estimate
- +19%
- Unit price
- $0.50/EA
- Extension
- $1,394.00
- Proposal total
- $3,801,261
- vs. low bid
- +$1,003,807
- vs. engineer’s estimate
- -60.3%
- Unit price
- $0.70/EA
- Extension
- $1,951.60
- Proposal total
- $3,825,058
- vs. low bid
- +$1,027,604
- vs. engineer’s estimate
- -44.4%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 4,897 EA · Engineer’s estimate $1.70/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $1.00/EA | $4,897.00 | — | -41.2% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $1.50/EA | $7,345.50 | +$2,449 | -11.8% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $1.00/EA | $4,897.00 | $0.000 | -41.2% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $0.10/EA | $489.70 | -$4,407 | -94.1% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $5.00/EA | $24,485.00 | +$19,588 | +194.1% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $1.00/EA | $4,897.00 | $0.000 | -41.2% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $1.07/EA | $5,239.79 | +$342.79 | -37.1% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $1.20/EA | $5,876.40 | +$979.40 | -29.4% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $1.08/EA | $5,288.76 | +$391.76 | -36.5% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $4.40/EA | $21,546.80 | +$16,650 | +158.8% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $1.50/EA | $7,345.50 | +$2,449 | -11.8% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $0.97/EA | $4,750.09 | -$146.91 | -42.9% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $1.00/EA
- Extension
- $4,897.00
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- -41.2%
- Unit price
- $1.50/EA
- Extension
- $7,345.50
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- -11.8%
- Unit price
- $1.00/EA
- Extension
- $4,897.00
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- -41.2%
- Unit price
- $0.10/EA
- Extension
- $489.70
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- -94.1%
- Unit price
- $5.00/EA
- Extension
- $24,485.00
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +194.1%
- Unit price
- $1.00/EA
- Extension
- $4,897.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- -41.2%
- Unit price
- $1.07/EA
- Extension
- $5,239.79
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- -37.1%
- Unit price
- $1.20/EA
- Extension
- $5,876.40
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- -29.4%
9. Zachry Construction Corporation
- Unit price
- $1.08/EA
- Extension
- $5,288.76
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- -36.5%
10. Brizo Construction, LLC
- Unit price
- $4.40/EA
- Extension
- $21,546.80
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +158.8%
- Unit price
- $1.50/EA
- Extension
- $7,345.50
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -11.8%
- Unit price
- $0.97/EA
- Extension
- $4,750.09
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- -42.9%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 68 | 7 | Ti-Zack Concrete, LLC | $5.76 | $2.00 |
| 2026-11-04 | 0009-06-056 | Hunt | Paris | 31,400 | 1 | Cdm Holdings | $1.00 | $0.900 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 2,788 | 6 | Bobcat Services, Inc. | $0.500 | $1.26 |
| 2026-11-04 | 0052-04-054 | Lamb | Lubbock | 47,568 | 1 | Lipham Asphalt and Paving Company, LLC | $1.00 | $1.10 |
| 2026-11-04 | 0066-03-045 | Sherman | Amarillo | 25,647 | 1 | Breedon Investments USA Inc. | $0.600 | $1.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 4,897 | 12 | Fluor Enterprises, Inc. | $1.00 | $1.70 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 5,464 | 7 | Big Creek Construction, Ltd. | $1.50 | $1.30 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 1,150 | 2 | Texas Materials Group, Inc. | $1.50 | $1.83 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 1,394 | 9 | Highway 19 Construction LLC | $2.00 | $1.85 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 787 | 5 | J E Construction Services, LLC | $3.00 | $1.50 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 95 | $1.00 | $1.00 | $1.00 | -35.48% |
| Amarillo | 62 | $0.600 | $1.40 | $1.00 | -35.19% |
| Atlanta | 33 | — | $1.00 | — | — |
| Austin | 219 | $0.950 | $1.63 | $1.00 | -9.44% |
| Beaumont | 115 | $2.00 | $0.560 | $1.45 | -15.41% |
| Brownwood | 86 | $0.500 | $1.00 | $1.00 | +19.05% |
| Bryan | 152 | $1.50 | $1.08 | $1.70 | -26.67% |
| Childress | 33 | $1.40 | $1.40 | $1.65 | -8.06% |
| Corpus Christi | 104 | $1.30 | $1.25 | $1.50 | -27.5% |
| Dallas | 286 | $2.45 | $1.50 | $1.60 | -18.37% |
| El Paso | 29 | $1.00 | $2.50 | $0.650 | +8.93% |
| Fort Worth | 106 | $2.25 | $1.00 | $1.00 | -41.5% |
| Houston | 63 | $1.40 | $1.00 | $1.88 | — |
| Laredo | 27 | $2.00 | $1.07 | $1.65 | -18.13% |
| Lubbock | 40 | $1.00 | $1.00 | $1.10 | -3.23% |
| Lufkin | 81 | $2.50 | $1.07 | $0.800 | 0% |
| Odessa | 68 | $1.50 | $1.50 | $0.500 | +12.28% |
| Paris | 128 | $1.00 | $1.00 | $1.05 | -8.26% |
| Pharr | 100 | $1.29 | $1.11 | $1.00 | -7.5% |
| San Angelo | 12 | $3.56 | $0.600 | $1.55 | — |
| San Antonio | 156 | $0.150 | $0.500 | $1.00 | -34.25% |
| Tyler | 90 | $1.75 | $1.00 | $0.650 | 0% |
| Waco | 88 | $0.500 | $0.950 | $0.640 | -33.33% |
| Wichita Falls | 42 | $0.700 | $1.25 | $1.54 | -39.25% |
| Yoakum | 154 | $1.53 | $1.53 | $1.50 | +9.29% |
Related items
- 662-7112 · WK ZN PAV MRK SHT Term (TAB)TY W ($1.08/EA)
- 662-7038 · WK ZN PAV MRK NON-Remov (Y)6"(SLD) ($0.220/LF)
- 662-7008 · WK ZN PAV MRK NON-Remov (W)6"(SLD) ($0.250/LF)
- 662-7100 · WK ZN PAV MRK Remov (Y)6"(SLD) ($0.800/LF)
- 662-7068 · WK ZN PAV MRK Remov (W)6"(SLD) ($0.760/LF)
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
- 666-7423 · Refl PAV MRK TY I (Y)6"(SLD)(100MIL) ($0.450/LF)
- 666-7036 · Refl PAV MRK TY I (W)24"(SLD)(100MIL) ($7.00/LF)
Is your price for item 662-7114 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.