WK ZN PAV MRK SHT Term (TAB)TY W (Item 662-7112): TxDOT Unit Price History
2,364 bids · 489 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure EA
TxDOT 662-7112 · WK ZN PAV MRK SHT TERM (TAB)TY W · Unit: EA
- Low bid
- $1.07/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $1.08/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $1.10/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -12.43%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 662-7112 (WK ZN PAV MRK SHT Term (TAB)TY W) is measured in EA. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 2,364 bids for it on 489 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,167 bids was $1.08 per EA, and the winning low bidders priced it at a weighted median of $1.07 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $1.10 per EA, so winning bids came in 2.7% below the estimate.
By calendar year, the median bid moved from $1.65 in 2025 (1,178 bids) to $1.45 in 2026 (1,085 bids), down 12.1%. The middle half of 2026 bids fell between $1.00 and $2.20.
Comparing the last 12 months with the 12 months before, the median unit price fell 12.43%.
Quantity matters for this item. Lines of 3 to 583 EA had a weighted median of $1.87, while lines above 3,425 EA had $1.20, a 36% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 427 lines where both a winning and a second-place bid were published, the median winning unit price was $1.50 against $1.50 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Waco had the lowest weighted median ($0.900) and El Paso the highest ($2.70). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $5.64 per EA for 125 EA against an estimate of $2.00.
174 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 662-7114 WK ZN PAV MRK SHT Term (TAB)TY Y-2 (weighted median $1.00 per EA); 662-7038 WK ZN PAV MRK NON-Remov (Y)6"(SLD) (weighted median $0.220 per LF); 662-7008 WK ZN PAV MRK NON-Remov (W)6"(SLD) (weighted median $0.250 per LF); 662-7100 WK ZN PAV MRK Remov (Y)6"(SLD) (weighted median $0.800 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 101 | 30 | $2.32 | $1.60 | $1.60 | $1.00 | $2.50 |
| 2025 | 1,178 | 241 | $1.66 | $1.45 | $1.65 | $1.00 | $2.75 |
| 2026 | 1,085 | 218 | $1.40 | $1.10 | $1.45 | $1.00 | $2.20 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 3–583 | 792 | $2.72 | $1.87 | $1.06–$3.50 |
| Medium | 587–3,411 | 786 | $1.93 | $1.50 | $1.00–$2.37 |
| Large | 3,425–146,000 | 786 | $1.51 | $1.20 | $1.00–$2.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $1.50
- Median second-low unit price
- $1.50
- Median engineer’s estimate
- $1.60
- Median gap, second vs. low
- +0%
427 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District
Line quantity 125 EA · Engineer’s estimate $2.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLCLOW BID | $5.64/EA | $705.00 | — | +182% | $734,629 | $59,414 (8.09%) left on table |
| 2 | Cross Plus Construction, LLC | $1.00/EA | $125.00 | -$580.00 | -50% | $794,043 | +$59,414 |
| 3 | Structural Integrity Group LLC | $2.50/EA | $312.50 | -$392.50 | +25% | $852,064 | +$117,434 |
| 4 | Pathfield Investments LLC | $5.00/EA | $625.00 | -$80.00 | +150% | $863,606 | +$128,977 |
| 5 | Scr Civil Construction, LLC | $5.00/EA | $625.00 | -$80.00 | +150% | $916,535 | +$181,906 |
| 6 | Icos Management, LLC | $2.10/EA | $262.50 | -$442.50 | +5% | $974,652 | +$240,023 |
- LOW BID · WINNER
- Unit price
- $5.64/EA
- Extension
- $705.00
- Proposal total
- $734,629
- Money left on the table
- $59,414 (8.09%)
- vs. engineer’s estimate
- +182%
- Unit price
- $1.00/EA
- Extension
- $125.00
- Proposal total
- $794,043
- vs. low bid
- +$59,414
- vs. engineer’s estimate
- -50%
- Unit price
- $2.50/EA
- Extension
- $312.50
- Proposal total
- $852,064
- vs. low bid
- +$117,434
- vs. engineer’s estimate
- +25%
- Unit price
- $5.00/EA
- Extension
- $625.00
- Proposal total
- $863,606
- vs. low bid
- +$128,977
- vs. engineer’s estimate
- +150%
- Unit price
- $5.00/EA
- Extension
- $625.00
- Proposal total
- $916,535
- vs. low bid
- +$181,906
- vs. engineer’s estimate
- +150%
- Unit price
- $2.10/EA
- Extension
- $262.50
- Proposal total
- $974,652
- vs. low bid
- +$240,023
- vs. engineer’s estimate
- +5%
Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District
Line quantity 8,874 EA · Engineer’s estimate $1.60/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Bobcat Services, Inc.LOW BID | $0.48/EA | $4,259.52 | — | -70% | $2,797,454 | $386,828 (13.83%) left on table |
| 2 | Hunter Industries, Ltd. | $1.72/EA | $15,263.28 | +$11,004 | +7.5% | $3,184,282 | +$386,828 |
| 3 | Dean Word Company, Ltd. | $2.00/EA | $17,748.00 | +$13,488 | +25% | $3,495,937 | +$698,482 |
| 4 | Texas Materials Group, Inc. | $1.50/EA | $13,311.00 | +$9,051 | -6.3% | $3,586,449 | +$788,995 |
| 5 | Lone Star Paving Company | $0.50/EA | $4,437.00 | +$177.48 | -68.8% | $3,801,261 | +$1,003,807 |
| 6 | Clark Construction of Texas, Inc. | $0.70/EA | $6,211.80 | +$1,952 | -56.3% | $3,825,058 | +$1,027,604 |
1. Bobcat Services, Inc.
LOW BID · WINNER- Unit price
- $0.48/EA
- Extension
- $4,259.52
- Proposal total
- $2,797,454
- Money left on the table
- $386,828 (13.83%)
- vs. engineer’s estimate
- -70%
- Unit price
- $1.72/EA
- Extension
- $15,263.28
- Proposal total
- $3,184,282
- vs. low bid
- +$386,828
- vs. engineer’s estimate
- +7.5%
- Unit price
- $2.00/EA
- Extension
- $17,748.00
- Proposal total
- $3,495,937
- vs. low bid
- +$698,482
- vs. engineer’s estimate
- +25%
- Unit price
- $1.50/EA
- Extension
- $13,311.00
- Proposal total
- $3,586,449
- vs. low bid
- +$788,995
- vs. engineer’s estimate
- -6.3%
- Unit price
- $0.50/EA
- Extension
- $4,437.00
- Proposal total
- $3,801,261
- vs. low bid
- +$1,003,807
- vs. engineer’s estimate
- -68.8%
- Unit price
- $0.70/EA
- Extension
- $6,211.80
- Proposal total
- $3,825,058
- vs. low bid
- +$1,027,604
- vs. engineer’s estimate
- -56.3%
Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District
Line quantity 4,991 EA · Engineer’s estimate $4.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lone Star Paving CompanyLOW BID | $1.50/EA | $7,486.50 | — | -62.5% | $6,732,215 | $1,063,968 (15.8%) left on table |
| 2 | Rk Hall, LLC | $3.54/EA | $17,668.14 | +$10,182 | -11.5% | $7,796,183 | +$1,063,968 |
| 3 | Zack Burkett Co. | $2.10/EA | $10,481.10 | +$2,995 | -47.5% | $7,966,171 | +$1,233,956 |
| 4 | Foutsco Paving Company, LLC | $1.00/EA | $4,991.00 | -$2,496 | -75% | $8,000,580 | +$1,268,365 |
| 5 | Nobles Road Construction, Inc. | $1.50/EA | $7,486.50 | $0.000 | -62.5% | $8,307,427 | +$1,575,212 |
| 6 | Ck Newberry, LLC | $0.90/EA | $4,491.90 | -$2,995 | -77.5% | $8,389,000 | +$1,656,785 |
| 7 | Reece Albert, Inc. | $0.65/EA | $3,244.15 | -$4,242 | -83.8% | $8,534,153 | +$1,801,938 |
| 8 | Texas Materials Group, Inc. | $1.05/EA | $5,240.55 | -$2,246 | -73.8% | $8,617,318 | +$1,885,103 |
| 9 | A. L. Helmcamp, Inc. | $0.75/EA | $3,743.25 | -$3,743 | -81.3% | $9,257,856 | +$2,525,641 |
- LOW BID · WINNER
- Unit price
- $1.50/EA
- Extension
- $7,486.50
- Proposal total
- $6,732,215
- Money left on the table
- $1,063,968 (15.8%)
- vs. engineer’s estimate
- -62.5%
2. Rk Hall, LLC
- Unit price
- $3.54/EA
- Extension
- $17,668.14
- Proposal total
- $7,796,183
- vs. low bid
- +$1,063,968
- vs. engineer’s estimate
- -11.5%
- Unit price
- $2.10/EA
- Extension
- $10,481.10
- Proposal total
- $7,966,171
- vs. low bid
- +$1,233,956
- vs. engineer’s estimate
- -47.5%
- Unit price
- $1.00/EA
- Extension
- $4,991.00
- Proposal total
- $8,000,580
- vs. low bid
- +$1,268,365
- vs. engineer’s estimate
- -75%
5. Nobles Road Construction, Inc.
- Unit price
- $1.50/EA
- Extension
- $7,486.50
- Proposal total
- $8,307,427
- vs. low bid
- +$1,575,212
- vs. engineer’s estimate
- -62.5%
- Unit price
- $0.90/EA
- Extension
- $4,491.90
- Proposal total
- $8,389,000
- vs. low bid
- +$1,656,785
- vs. engineer’s estimate
- -77.5%
- Unit price
- $0.65/EA
- Extension
- $3,244.15
- Proposal total
- $8,534,153
- vs. low bid
- +$1,801,938
- vs. engineer’s estimate
- -83.8%
- Unit price
- $1.05/EA
- Extension
- $5,240.55
- Proposal total
- $8,617,318
- vs. low bid
- +$1,885,103
- vs. engineer’s estimate
- -73.8%
- Unit price
- $0.75/EA
- Extension
- $3,743.25
- Proposal total
- $9,257,856
- vs. low bid
- +$2,525,641
- vs. engineer’s estimate
- -81.3%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 125 | 6 | Ti-Zack Concrete, LLC | $5.64 | $2.00 |
| 2026-11-04 | 0009-06-056 | Hunt | Paris | 8,115 | 1 | Cdm Holdings | $1.00 | $0.800 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 8,874 | 6 | Bobcat Services, Inc. | $0.480 | $1.60 |
| 2026-11-04 | 0052-04-054 | Lamb | Lubbock | 19,620 | 1 | Lipham Asphalt and Paving Company, LLC | $1.00 | $1.10 |
| 2026-11-04 | 0066-03-045 | Sherman | Amarillo | 16,499 | 1 | Breedon Investments USA Inc. | $0.600 | $1.00 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 4,991 | 9 | Lone Star Paving Company | $1.50 | $4.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 5,504 | 12 | Fluor Enterprises, Inc. | $1.50 | $1.60 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 442 | 5 | J E Construction Services, LLC | $3.00 | $1.50 |
| 2026-11-04 | 6504-98-001 | Tom Green | San Angelo | 1,000 | 4 | Reece Albert, Inc. | $3.17 | $1.23 |
| 2026-11-04 | 6510-36-001 | Hill | Waco | 600 | 3 | Big Creek Construction, Ltd. | $1.50 | $1.48 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 53 | $1.00 | $1.50 | $3.50 | -32.77% |
| Amarillo | 65 | $1.35 | $1.50 | $1.00 | -40% |
| Atlanta | 34 | $5.00 | $1.00 | $1.50 | -44% |
| Austin | 232 | $1.00 | $1.50 | $1.55 | -1.84% |
| Beaumont | 89 | $0.250 | $1.00 | $1.00 | -19.74% |
| Brownwood | 66 | $1.50 | $1.25 | $2.00 | 0% |
| Bryan | 134 | $1.50 | $1.20 | $1.40 | -6.8% |
| Childress | 43 | $1.40 | $1.00 | $1.09 | -19.35% |
| Corpus Christi | 114 | $1.60 | $1.60 | $1.63 | -28.57% |
| Dallas | 275 | $0.750 | $1.25 | $1.50 | -40% |
| El Paso | 33 | $5.00 | $2.70 | $1.80 | -1.82% |
| Fort Worth | 229 | $1.65 | $1.00 | $1.94 | -47% |
| Houston | 62 | $1.25 | $1.25 | $1.30 | — |
| Laredo | 33 | $1.07 | $1.20 | $1.50 | — |
| Lubbock | 62 | $1.00 | $1.00 | $1.10 | -1.64% |
| Lufkin | 51 | $2.88 | $1.70 | $2.00 | -5% |
| Odessa | 89 | $0.600 | $1.70 | $1.25 | +23.08% |
| Paris | 55 | $1.00 | $1.50 | $0.800 | -19.5% |
| Pharr | 105 | $1.26 | $1.13 | $1.00 | -12.41% |
| San Angelo | 17 | $3.54 | $2.19 | $1.15 | — |
| San Antonio | 265 | $1.50 | $1.00 | $0.630 | -34.97% |
| Tyler | 78 | $1.75 | $1.00 | $2.30 | 0% |
| Waco | 73 | $0.500 | $0.900 | $0.920 | -30.56% |
| Wichita Falls | 64 | $0.700 | $1.00 | $1.10 | -11.48% |
| Yoakum | 43 | $1.00 | $1.30 | $2.00 | +48.84% |
Related items
- 662-7114 · WK ZN PAV MRK SHT Term (TAB)TY Y-2 ($1.00/EA)
- 662-7038 · WK ZN PAV MRK NON-Remov (Y)6"(SLD) ($0.220/LF)
- 662-7008 · WK ZN PAV MRK NON-Remov (W)6"(SLD) ($0.250/LF)
- 662-7100 · WK ZN PAV MRK Remov (Y)6"(SLD) ($0.800/LF)
- 662-7068 · WK ZN PAV MRK Remov (W)6"(SLD) ($0.760/LF)
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
- 666-7423 · Refl PAV MRK TY I (Y)6"(SLD)(100MIL) ($0.450/LF)
- 666-7036 · Refl PAV MRK TY I (W)24"(SLD)(100MIL) ($7.00/LF)
Is your price for item 662-7112 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.