Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

WK ZN PAV MRK NON-Remov (W)6"(SLD) (Item 662-7008): TxDOT Unit Price History

1,640 bids · 292 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 662-7008 · WK ZN PAV MRK NON-REMOV (W)6"(SLD) · Unit: LF

Low bid
$0.210/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.250/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.250/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
0%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$0.500$1.00$1.50$2.001001K10K100K1MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 1.78 − 0.268·ln qty, R² 0.45)320 plotted bids, 4 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 662-7008 (WK ZN PAV MRK NON-Remov (W)6"(SLD)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,640 bids for it on 292 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 875 bids was $0.250 per LF, and the winning low bidders priced it at a weighted median of $0.210 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.250 per LF, so winning bids came in 16.0% below the estimate.

By calendar year, the median bid moved from $0.350 in 2025 (791 bids) to $0.350 in 2026 (817 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $0.250 and $0.500.

Comparing the last 12 months with the 12 months before, the median unit price did not change.

Quantity matters for this item. Lines of 36 to 19,518 LF had a weighted median of $0.490, while lines above 66,452 LF had $0.250, a 49% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 287 lines where both a winning and a second-place bid were published, the median winning unit price was $0.330 against $0.330 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 22 TxDOT districts with at least ten bids, Brownwood had the lowest weighted median ($0.150) and Pharr the highest ($0.500). The busiest district for this item was Austin.

The most recent letting with this item was on Nov 4, 2026 in Hays County, where Bobcat Services, Inc. was the low bidder at $0.370 per LF for 57,302 LF against an estimate of $0.290.

10 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 662-7112 WK ZN PAV MRK SHT Term (TAB)TY W (weighted median $1.08 per EA); 662-7114 WK ZN PAV MRK SHT Term (TAB)TY Y-2 (weighted median $1.00 per EA); 662-7038 WK ZN PAV MRK NON-Remov (Y)6"(SLD) (weighted median $0.220 per LF); 662-7100 WK ZN PAV MRK Remov (Y)6"(SLD) (weighted median $0.800 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024326$0.320$0.300$0.370$0.260$0.500
2025791148$0.320$0.260$0.350$0.250$0.550
2026817138$0.290$0.240$0.350$0.250$0.500

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small36–19,518547$0.600$0.490$0.400–$1.00
Medium19,760–65,029550$0.360$0.300$0.240–$0.450
Large66,452–989,314543$0.280$0.250$0.200–$0.350

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.330
Median second-low unit price
$0.330
Median engineer’s estimate
$0.410
Median gap, second vs. low
+0%

287 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District

Line quantity 57,302 LF · Engineer’s estimate $0.290/LF

  • 1. Bobcat Services, Inc.

    LOW BID · WINNER
    Unit price
    $0.37/LF
    Extension
    $21,201.74
    Proposal total
    $2,797,454
    Money left on the table
    $386,828 (13.83%)
    vs. engineer’s estimate
    +27.6%
  • Unit price
    $0.35/LF
    Extension
    $20,055.70
    Proposal total
    $3,184,282
    vs. low bid
    +$386,828
    vs. engineer’s estimate
    +20.7%
  • Unit price
    $0.35/LF
    Extension
    $20,055.70
    Proposal total
    $3,495,937
    vs. low bid
    +$698,482
    vs. engineer’s estimate
    +20.7%
  • Unit price
    $0.40/LF
    Extension
    $22,920.80
    Proposal total
    $3,586,449
    vs. low bid
    +$788,995
    vs. engineer’s estimate
    +37.9%
  • Unit price
    $0.35/LF
    Extension
    $20,055.70
    Proposal total
    $3,801,261
    vs. low bid
    +$1,003,807
    vs. engineer’s estimate
    +20.7%
  • Unit price
    $0.35/LF
    Extension
    $20,055.70
    Proposal total
    $3,825,058
    vs. low bid
    +$1,027,604
    vs. engineer’s estimate
    +20.7%

Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District

Line quantity 60,940 LF · Engineer’s estimate $0.400/LF

  • 1. Lone Star Paving Company

    LOW BID · WINNER
    Unit price
    $0.16/LF
    Extension
    $9,750.40
    Proposal total
    $6,732,215
    Money left on the table
    $1,063,968 (15.8%)
    vs. engineer’s estimate
    -60%
  • Unit price
    $0.17/LF
    Extension
    $10,359.80
    Proposal total
    $7,796,183
    vs. low bid
    +$1,063,968
    vs. engineer’s estimate
    -57.5%
  • Unit price
    $0.33/LF
    Extension
    $20,110.20
    Proposal total
    $7,966,171
    vs. low bid
    +$1,233,956
    vs. engineer’s estimate
    -17.5%
  • Unit price
    $0.16/LF
    Extension
    $9,750.40
    Proposal total
    $8,000,580
    vs. low bid
    +$1,268,365
    vs. engineer’s estimate
    -60%
  • 5. Nobles Road Construction, Inc.

    Unit price
    $0.17/LF
    Extension
    $10,359.80
    Proposal total
    $8,307,427
    vs. low bid
    +$1,575,212
    vs. engineer’s estimate
    -57.5%
  • Unit price
    $0.25/LF
    Extension
    $15,235.00
    Proposal total
    $8,389,000
    vs. low bid
    +$1,656,785
    vs. engineer’s estimate
    -37.5%
  • Unit price
    $0.37/LF
    Extension
    $22,547.80
    Proposal total
    $8,534,153
    vs. low bid
    +$1,801,938
    vs. engineer’s estimate
    -7.5%
  • Unit price
    $0.30/LF
    Extension
    $18,282.00
    Proposal total
    $8,617,318
    vs. low bid
    +$1,885,103
    vs. engineer’s estimate
    -25%
  • Unit price
    $0.22/LF
    Extension
    $13,406.80
    Proposal total
    $9,257,856
    vs. low bid
    +$2,525,641
    vs. engineer’s estimate
    -45%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 27,377 LF · Engineer’s estimate $0.500/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $0.40/LF
    Extension
    $10,950.80
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -20%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $0.35/LF
    Extension
    $9,581.95
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -30%
  • Unit price
    $0.47/LF
    Extension
    $12,867.19
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -6%
  • Unit price
    $0.35/LF
    Extension
    $9,581.95
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -30%
  • 5. Sema Construction, Inc.

    Unit price
    $0.35/LF
    Extension
    $9,581.95
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -30%
  • 6. Zachry Construction Corporation

    Unit price
    $0.36/LF
    Extension
    $9,855.72
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -28%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040016-03-125HaysAustin57,3026Bobcat Services, Inc.$0.370$0.290
2026-11-040157-04-058HaskellAbilene60,9409Lone Star Paving Company$0.160$0.400
2026-11-040195-02-092DentonDallas27,3776Indus Road & Bridge, Inc.$0.400$0.500
2026-11-040262-01-034MilamBryan57,6857Big Creek Construction, Ltd.$0.170$0.400
2026-11-041017-03-040HuntParis55,7729Highway 19 Construction LLC$0.240$0.250
2026-11-030008-02-078ParkerFort Worth9328Jay Mills Contracting, Incorporated$0.850$1.00
2026-11-030045-09-113LamarParis19,5185Drake Companies LLC$0.390$0.270
2026-10-070022-01-034TerrellOdessa13,6807Relmco, Inc.$1.10$0.300
2026-10-070200-01-093AngelinaLufkin59,7977Longview Bridge and Road, Ltd.$0.220$0.400
2026-10-070510-06-024FanninParis138,0846A. K. Gillis & Sons, LLC$0.270$0.330

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene18$0.160$0.220$0.400—
Amarillo54$0.300$0.300$0.350-11.76%
Atlanta28$0.220$0.260$0.3000%
Austin211$0.190$0.190$0.250-15.52%
Beaumont38$0.510$0.280$0.500-15%
Brownwood11$0.170$0.150$0.300—
Bryan89$0.220$0.250$0.250-42.53%
Childress14$0.180$0.170$0.300—
Corpus Christi38$0.330$0.500$0.500—
Dallas137$0.300$0.370$0.300+33.33%
Fort Worth120$0.280$0.250$0.900+36.36%
Houston85$0.350$0.300$0.300-8.75%
Laredo11$0.430$0.430$0.250—
Lubbock56$0.250$0.300$0.350+32%
Lufkin40$0.220$0.350$0.400-13.75%
Odessa110$0.180$0.180$0.200-16.67%
Paris92$0.270$0.300$0.300+32%
Pharr65$0.500$0.500$0.5000%
San Angelo6$0.350$0.320$1.00—
San Antonio104$0.190$0.200$0.250-14.29%
Tyler131$0.280$0.300$0.450-8.05%
Waco57$0.150$0.150$0.180-43.94%
Wichita Falls8$0.380$0.360$0.330—
Yoakum117$0.200$0.310$0.250+43.75%

Related items

Is your price for item 662-7008 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.