WK ZN PAV MRK Remov (Y)6"(SLD) (Item 662-7100): TxDOT Unit Price History
1,456 bids · 244 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF
TxDOT 662-7100 · WK ZN PAV MRK REMOV (Y)6"(SLD) · Unit: LF
- Low bid
- $0.750/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $0.800/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $0.800/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -9.09%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 662-7100 (WK ZN PAV MRK Remov (Y)6"(SLD)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,456 bids for it on 244 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 857 bids was $0.800 per LF, and the winning low bidders priced it at a weighted median of $0.750 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $0.800 per LF, so winning bids came in 6.3% below the estimate.
By calendar year, the median bid moved from $1.07 in 2025 (643 bids) to $1.00 in 2026 (765 bids), down 6.5%. The middle half of 2026 bids fell between $0.750 and $1.50.
Comparing the last 12 months with the 12 months before, the median unit price fell 9.09%.
Quantity matters for this item. Lines of 92 to 8,829 LF had a weighted median of $1.25, while lines above 32,326 LF had $0.760, a 39% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 238 lines where both a winning and a second-place bid were published, the median winning unit price was $1.00 against $1.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Abilene had the lowest weighted median ($0.350) and El Paso the highest ($3.05). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $0.800 per LF for 72,465 LF against an estimate of $0.950.
8 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 662-7112 WK ZN PAV MRK SHT Term (TAB)TY W (weighted median $1.08 per EA); 662-7114 WK ZN PAV MRK SHT Term (TAB)TY Y-2 (weighted median $1.00 per EA); 662-7038 WK ZN PAV MRK NON-Remov (Y)6"(SLD) (weighted median $0.220 per LF); 662-7008 WK ZN PAV MRK NON-Remov (W)6"(SLD) (weighted median $0.250 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 48 | 9 | $1.06 | $1.19 | $1.40 | $0.980 | $2.00 |
| 2025 | 643 | 112 | $0.880 | $0.800 | $1.07 | $0.750 | $1.57 |
| 2026 | 765 | 124 | $0.850 | $0.800 | $1.00 | $0.750 | $1.50 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 92–8,829 | 491 | $1.61 | $1.25 | $1.00–$2.41 |
| Medium | 8,959–32,080 | 483 | $1.17 | $1.00 | $0.810–$1.50 |
| Large | 32,326–356,529 | 482 | $0.780 | $0.760 | $0.500–$1.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $1.00
- Median second-low unit price
- $1.00
- Median engineer’s estimate
- $1.03
- Median gap, second vs. low
- +0%
238 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 72,465 LF · Engineer’s estimate $0.950/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $0.80/LF | $57,972.00 | — | -15.8% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $1.05/LF | $76,088.25 | +$18,116 | +10.5% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $1.10/LF | $79,711.50 | +$21,740 | +15.8% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $1.50/LF | $108,697.50 | +$50,726 | +57.9% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $0.80/LF
- Extension
- $57,972.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -15.8%
- Unit price
- $1.05/LF
- Extension
- $76,088.25
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +10.5%
3. Tiseo Paving Company, LLC
- Unit price
- $1.10/LF
- Extension
- $79,711.50
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +15.8%
4. Harper Brothers Construction LLC
- Unit price
- $1.50/LF
- Extension
- $108,697.50
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- +57.9%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 111,862 LF · Engineer’s estimate $1.15/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $0.90/LF | $100,675.80 | — | -21.7% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $0.85/LF | $95,082.70 | -$5,593 | -26.1% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $1.08/LF | $120,810.96 | +$20,135 | -6.1% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $0.80/LF | $89,489.60 | -$11,186 | -30.4% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $0.80/LF | $89,489.60 | -$11,186 | -30.4% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $0.83/LF | $92,845.46 | -$7,830 | -27.8% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $0.90/LF
- Extension
- $100,675.80
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -21.7%
2. Rpm Xconstruction, LLC
- Unit price
- $0.85/LF
- Extension
- $95,082.70
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -26.1%
- Unit price
- $1.08/LF
- Extension
- $120,810.96
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -6.1%
4. Webber, LLC
- Unit price
- $0.80/LF
- Extension
- $89,489.60
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -30.4%
5. Sema Construction, Inc.
- Unit price
- $0.80/LF
- Extension
- $89,489.60
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -30.4%
6. Zachry Construction Corporation
- Unit price
- $0.83/LF
- Extension
- $92,845.46
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -27.8%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 70,372 LF · Engineer’s estimate $0.800/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $1.00/LF | $70,372.00 | — | +25% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $1.00/LF | $70,372.00 | $0.000 | +25% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $0.62/LF | $43,630.64 | -$26,741 | -22.5% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $1.00/LF | $70,372.00 | $0.000 | +25% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $0.97/LF | $68,260.84 | -$2,111 | +21.2% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $1.00/LF | $70,372.00 | $0.000 | +25% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $1.02/LF | $71,779.44 | +$1,407 | +27.5% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $1.05/LF | $73,890.60 | +$3,519 | +31.3% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $0.63/LF | $44,334.36 | -$26,038 | -21.3% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $1.10/LF | $77,409.20 | +$7,037 | +37.5% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $0.60/LF | $42,223.20 | -$28,149 | -25% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $0.85/LF | $59,816.20 | -$10,556 | +6.2% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $1.00/LF
- Extension
- $70,372.00
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- +25%
- Unit price
- $1.00/LF
- Extension
- $70,372.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- +25%
- Unit price
- $0.62/LF
- Extension
- $43,630.64
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- -22.5%
- Unit price
- $1.00/LF
- Extension
- $70,372.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- +25%
- Unit price
- $0.97/LF
- Extension
- $68,260.84
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +21.2%
- Unit price
- $1.00/LF
- Extension
- $70,372.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- +25%
- Unit price
- $1.02/LF
- Extension
- $71,779.44
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- +27.5%
- Unit price
- $1.05/LF
- Extension
- $73,890.60
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- +31.3%
9. Zachry Construction Corporation
- Unit price
- $0.63/LF
- Extension
- $44,334.36
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- -21.3%
10. Brizo Construction, LLC
- Unit price
- $1.10/LF
- Extension
- $77,409.20
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +37.5%
- Unit price
- $0.60/LF
- Extension
- $42,223.20
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -25%
- Unit price
- $0.85/LF
- Extension
- $59,816.20
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +6.2%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 72,465 | 4 | Mario Sinacola & Sons Excavating, Inc. | $0.800 | $0.950 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 111,862 | 6 | Indus Road & Bridge, Inc. | $0.900 | $1.15 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 70,372 | 12 | Fluor Enterprises, Inc. | $1.00 | $0.800 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 47,949 | 5 | J E Construction Services, LLC | $1.00 | $0.400 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 304,481 | 6 | Austin Bridge & Road Services, LP | $0.800 | $1.07 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 30,107 | 8 | Coppell Construction Co., Inc. | $1.00 | $0.800 |
| 2026-10-07 | 0067-17-039 | Randall | Amarillo | 19,597 | 5 | Gibson & Associates, Inc. | $1.76 | $1.05 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 32,876 | 7 | Ragle Construction, Inc. | $0.800 | $1.00 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 46,046 | 10 | Highway 19 Construction LLC | $1.00 | $0.500 |
| 2026-10-06 | 0912-34-209 | Fort Bend | Houston | 92 | 9 | Garret Shields Infrastructure | $5.80 | $3.90 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 53 | $0.350 | $0.350 | $0.800 | +44.76% |
| Amarillo | 28 | $1.00 | $1.10 | $0.800 | -9.09% |
| Atlanta | 28 | $1.20 | $1.32 | $0.750 | — |
| Austin | 86 | $0.800 | $0.850 | $1.07 | +14.94% |
| Beaumont | 20 | $1.25 | $1.00 | $1.29 | — |
| Brownwood | 38 | $5.25 | $2.35 | $2.00 | +136% |
| Bryan | 67 | $1.00 | $1.00 | $0.800 | -5.83% |
| Childress | 26 | $1.06 | $1.00 | $0.870 | — |
| Corpus Christi | 61 | $0.350 | $0.350 | $0.750 | -28.18% |
| Dallas | 162 | $0.900 | $0.800 | $1.00 | -16.67% |
| El Paso | 13 | $2.55 | $3.05 | $0.500 | — |
| Fort Worth | 88 | $1.50 | $0.900 | $1.50 | -12% |
| Houston | 89 | $1.30 | $1.25 | $0.750 | +38% |
| Laredo | 39 | $0.450 | $0.450 | $0.500 | — |
| Lubbock | 12 | $1.00 | $1.05 | $0.660 | — |
| Lufkin | 62 | $2.20 | $2.00 | $2.00 | -20.39% |
| Odessa | 47 | $0.380 | $0.350 | $1.00 | -23.81% |
| Paris | 18 | $0.900 | $0.900 | $1.60 | — |
| Pharr | 82 | $0.320 | $0.350 | $0.500 | 0% |
| San Angelo | 36 | $2.50 | $2.00 | $3.24 | -4.63% |
| San Antonio | 111 | $0.700 | $0.710 | $0.750 | -3.75% |
| Tyler | 90 | $1.30 | $1.28 | $1.80 | -6.67% |
| Waco | 18 | $0.550 | $0.570 | $1.00 | — |
| Wichita Falls | 44 | $1.10 | $1.21 | $1.00 | -8% |
| Yoakum | 138 | $0.420 | $0.800 | $1.00 | -24.92% |
Related items
- 662-7112 · WK ZN PAV MRK SHT Term (TAB)TY W ($1.08/EA)
- 662-7114 · WK ZN PAV MRK SHT Term (TAB)TY Y-2 ($1.00/EA)
- 662-7038 · WK ZN PAV MRK NON-Remov (Y)6"(SLD) ($0.220/LF)
- 662-7008 · WK ZN PAV MRK NON-Remov (W)6"(SLD) ($0.250/LF)
- 662-7068 · WK ZN PAV MRK Remov (W)6"(SLD) ($0.760/LF)
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
- 666-7423 · Refl PAV MRK TY I (Y)6"(SLD)(100MIL) ($0.450/LF)
- 666-7036 · Refl PAV MRK TY I (W)24"(SLD)(100MIL) ($7.00/LF)
Is your price for item 662-7100 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.