WK ZN PAV MRK Remov (Y)6"(SLD) (Item 662-7100): TxDOT Unit Price History

1,456 bids · 244 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 662-7100 · WK ZN PAV MRK REMOV (Y)6"(SLD) · Unit: LF

Low bid
$0.750/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.800/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.800/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-9.09%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1.00$2.00$3.00$4.00$5.00$6.00101001K10K100K1MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 2.43 − 0.246·ln qty, R² 0.34)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 662-7100 (WK ZN PAV MRK Remov (Y)6"(SLD)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,456 bids for it on 244 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 857 bids was $0.800 per LF, and the winning low bidders priced it at a weighted median of $0.750 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.800 per LF, so winning bids came in 6.3% below the estimate.

By calendar year, the median bid moved from $1.07 in 2025 (643 bids) to $1.00 in 2026 (765 bids), down 6.5%. The middle half of 2026 bids fell between $0.750 and $1.50.

Comparing the last 12 months with the 12 months before, the median unit price fell 9.09%.

Quantity matters for this item. Lines of 92 to 8,829 LF had a weighted median of $1.25, while lines above 32,326 LF had $0.760, a 39% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 238 lines where both a winning and a second-place bid were published, the median winning unit price was $1.00 against $1.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Abilene had the lowest weighted median ($0.350) and El Paso the highest ($3.05). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $0.800 per LF for 72,465 LF against an estimate of $0.950.

8 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 662-7112 WK ZN PAV MRK SHT Term (TAB)TY W (weighted median $1.08 per EA); 662-7114 WK ZN PAV MRK SHT Term (TAB)TY Y-2 (weighted median $1.00 per EA); 662-7038 WK ZN PAV MRK NON-Remov (Y)6"(SLD) (weighted median $0.220 per LF); 662-7008 WK ZN PAV MRK NON-Remov (W)6"(SLD) (weighted median $0.250 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024489$1.06$1.19$1.40$0.980$2.00
2025643112$0.880$0.800$1.07$0.750$1.57
2026765124$0.850$0.800$1.00$0.750$1.50

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small92–8,829491$1.61$1.25$1.00–$2.41
Medium8,959–32,080483$1.17$1.00$0.810–$1.50
Large32,326–356,529482$0.780$0.760$0.500–$1.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$1.00
Median second-low unit price
$1.00
Median engineer’s estimate
$1.03
Median gap, second vs. low
+0%

238 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 72,465 LF · Engineer’s estimate $0.950/LF

  • Unit price
    $0.80/LF
    Extension
    $57,972.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -15.8%
  • Unit price
    $1.05/LF
    Extension
    $76,088.25
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    +10.5%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $1.10/LF
    Extension
    $79,711.50
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    +15.8%
  • 4. Harper Brothers Construction LLC

    Unit price
    $1.50/LF
    Extension
    $108,697.50
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    +57.9%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 111,862 LF · Engineer’s estimate $1.15/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $0.90/LF
    Extension
    $100,675.80
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -21.7%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $0.85/LF
    Extension
    $95,082.70
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -26.1%
  • Unit price
    $1.08/LF
    Extension
    $120,810.96
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -6.1%
  • Unit price
    $0.80/LF
    Extension
    $89,489.60
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -30.4%
  • 5. Sema Construction, Inc.

    Unit price
    $0.80/LF
    Extension
    $89,489.60
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -30.4%
  • 6. Zachry Construction Corporation

    Unit price
    $0.83/LF
    Extension
    $92,845.46
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -27.8%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 70,372 LF · Engineer’s estimate $0.800/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $1.00/LF
    Extension
    $70,372.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +25%
  • Unit price
    $1.00/LF
    Extension
    $70,372.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    +25%
  • Unit price
    $0.62/LF
    Extension
    $43,630.64
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -22.5%
  • Unit price
    $1.00/LF
    Extension
    $70,372.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +25%
  • Unit price
    $0.97/LF
    Extension
    $68,260.84
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    +21.2%
  • Unit price
    $1.00/LF
    Extension
    $70,372.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    +25%
  • Unit price
    $1.02/LF
    Extension
    $71,779.44
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    +27.5%
  • Unit price
    $1.05/LF
    Extension
    $73,890.60
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +31.3%
  • 9. Zachry Construction Corporation

    Unit price
    $0.63/LF
    Extension
    $44,334.36
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    -21.3%
  • 10. Brizo Construction, LLC

    Unit price
    $1.10/LF
    Extension
    $77,409.20
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +37.5%
  • Unit price
    $0.60/LF
    Extension
    $42,223.20
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -25%
  • Unit price
    $0.85/LF
    Extension
    $59,816.20
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +6.2%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas72,4654Mario Sinacola & Sons Excavating, Inc.$0.800$0.950
2026-11-040195-02-092DentonDallas111,8626Indus Road & Bridge, Inc.$0.900$1.15
2026-11-040212-03-058BrazosBryan70,37212Fluor Enterprises, Inc.$1.00$0.800
2026-11-041052-02-098NuecesCorpus Christi47,9495J E Construction Services, LLC$1.00$0.400
2026-11-030015-13-432TravisAustin304,4816Austin Bridge & Road Services, LP$0.800$1.07
2026-11-030168-09-191RandallAmarillo30,1078Coppell Construction Co., Inc.$1.00$0.800
2026-10-070067-17-039RandallAmarillo19,5975Gibson & Associates, Inc.$1.76$1.05
2026-10-060009-11-248DallasDallas32,8767Ragle Construction, Inc.$0.800$1.00
2026-10-060095-03-100KaufmanDallas46,04610Highway 19 Construction LLC$1.00$0.500
2026-10-060912-34-209Fort BendHouston929Garret Shields Infrastructure$5.80$3.90

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene53$0.350$0.350$0.800+44.76%
Amarillo28$1.00$1.10$0.800-9.09%
Atlanta28$1.20$1.32$0.750—
Austin86$0.800$0.850$1.07+14.94%
Beaumont20$1.25$1.00$1.29—
Brownwood38$5.25$2.35$2.00+136%
Bryan67$1.00$1.00$0.800-5.83%
Childress26$1.06$1.00$0.870—
Corpus Christi61$0.350$0.350$0.750-28.18%
Dallas162$0.900$0.800$1.00-16.67%
El Paso13$2.55$3.05$0.500—
Fort Worth88$1.50$0.900$1.50-12%
Houston89$1.30$1.25$0.750+38%
Laredo39$0.450$0.450$0.500—
Lubbock12$1.00$1.05$0.660—
Lufkin62$2.20$2.00$2.00-20.39%
Odessa47$0.380$0.350$1.00-23.81%
Paris18$0.900$0.900$1.60—
Pharr82$0.320$0.350$0.5000%
San Angelo36$2.50$2.00$3.24-4.63%
San Antonio111$0.700$0.710$0.750-3.75%
Tyler90$1.30$1.28$1.80-6.67%
Waco18$0.550$0.570$1.00—
Wichita Falls44$1.10$1.21$1.00-8%
Yoakum138$0.420$0.800$1.00-24.92%

Related items

Is your price for item 662-7100 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.