Remov Conc (Riprap) (Item 104-7006): TxDOT Unit Price History
2,174 bids · 356 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure SY
TxDOT 104-7006 · REMOV CONC (RIPRAP) · Unit: SY
- Low bid
- $9.00/SY
- Quantity-weighted median of winning unit prices
- Weighted median
- $10.00/SY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $15.00/SY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -24.24%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 104-7006 (Remov Conc (Riprap)) is measured in SY. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 2,174 bids for it on 356 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,106 bids was $10.00 per SY, and the winning low bidders priced it at a weighted median of $9.00 per SY.
TxDOT's engineer's estimate for the same lines had a weighted median of $15.00 per SY, so winning bids came in 40.0% below the estimate.
By calendar year, the median bid moved from $35.00 in 2025 (1,088 bids) to $25.00 in 2026 (1,024 bids), down 28.6%. The middle half of 2026 bids fell between $15.00 and $50.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 24.24%.
Quantity matters for this item. Lines of 1.5 to 73 SY had a weighted median of $45.50, while lines above 378 SY had $11.91, a 74% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 351 lines where both a winning and a second-place bid were published, the median winning unit price was $25.00 against $25.30 from the second-lowest bidder, a median gap of 7.69% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($5.00) and San Angelo the highest ($50.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Denton County, where Road Doctors LLC was the low bidder at $100.00 per SY for 217 SY against an estimate of $45.00.
Related items: 104-7011 Remov Conc (Driveways) (weighted median $18.21 per SY); 104-7013 Remov Conc (Sidewalk, Ramp OR SUP) (weighted median $15.00 per SY); 104-7016 Remov Conc (Curb) (weighted median $4.57 per LF); 100-7002 Preparing ROW (weighted median $1,500.00 per STA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 62 | 9 | $33.37 | $14.26 | $50.00 | $16.02 | $100.00 |
| 2025 | 1,088 | 183 | $23.34 | $15.00 | $35.00 | $20.00 | $65.00 |
| 2026 | 1,024 | 165 | $15.19 | $10.48 | $25.00 | $15.00 | $50.00 |
Quantity bands
| Band | Quantity (SY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1.5–73 | 731 | $71.93 | $45.50 | $29.76–$100.00 |
| Medium | 75–377 | 724 | $50.49 | $32.00 | $20.00–$56.01 |
| Large | 378–29,584 | 719 | $15.53 | $11.91 | $10.36–$25.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $25.00
- Median second-low unit price
- $25.30
- Median engineer’s estimate
- $30.00
- Median gap, second vs. low
- +7.69%
351 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6497-55-001 · let Nov 12, 2026 · Denton County, Dallas District
Line quantity 217 SY · Engineer’s estimate $45.00/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Road Doctors LLCLOW BID | $100.00/SY | $21,700.00 | — | +122.2% | $493,320 | $25,748 (5.22%) left on table |
| 2 | Icos Management, LLC | $21.00/SY | $4,557.00 | -$17,143 | -53.3% | $519,068 | +$25,748 |
| 3 | Texas Road Construction, LLC | $100.00/SY | $21,700.00 | $0.000 | +122.2% | $567,220 | +$73,900 |
| 4 | Rear Contractors LLC | $50.00/SY | $10,850.00 | -$10,850 | +11.1% | $598,798 | +$105,478 |
| 5 | Premier Contractors LLC | $60.00/SY | $13,020.00 | -$8,680 | +33.3% | $654,688 | +$161,368 |
| 6 | Jr West Texas Concrete LLC | $45.00/SY | $9,765.00 | -$11,935 | 0% | $746,209 | +$252,889 |
- LOW BID · WINNER
- Unit price
- $100.00/SY
- Extension
- $21,700.00
- Proposal total
- $493,320
- Money left on the table
- $25,748 (5.22%)
- vs. engineer’s estimate
- +122.2%
- Unit price
- $21.00/SY
- Extension
- $4,557.00
- Proposal total
- $519,068
- vs. low bid
- +$25,748
- vs. engineer’s estimate
- -53.3%
- Unit price
- $100.00/SY
- Extension
- $21,700.00
- Proposal total
- $567,220
- vs. low bid
- +$73,900
- vs. engineer’s estimate
- +122.2%
- Unit price
- $50.00/SY
- Extension
- $10,850.00
- Proposal total
- $598,798
- vs. low bid
- +$105,478
- vs. engineer’s estimate
- +11.1%
- Unit price
- $60.00/SY
- Extension
- $13,020.00
- Proposal total
- $654,688
- vs. low bid
- +$161,368
- vs. engineer’s estimate
- +33.3%
6. Jr West Texas Concrete LLC
- Unit price
- $45.00/SY
- Extension
- $9,765.00
- Proposal total
- $746,209
- vs. low bid
- +$252,889
- vs. engineer’s estimate
- 0%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 6,277 SY · Engineer’s estimate $40.00/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $12.00/SY | $75,324.00 | — | -70% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $5.00/SY | $31,385.00 | -$43,939 | -87.5% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $11.00/SY | $69,047.00 | -$6,277 | -72.5% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $9.35/SY | $58,689.95 | -$16,634 | -76.6% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $13.07/SY | $82,040.39 | +$6,716 | -67.3% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $5.41/SY | $33,958.57 | -$41,365 | -86.5% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $12.00/SY
- Extension
- $75,324.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -70%
2. Rpm Xconstruction, LLC
- Unit price
- $5.00/SY
- Extension
- $31,385.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -87.5%
- Unit price
- $11.00/SY
- Extension
- $69,047.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -72.5%
4. Webber, LLC
- Unit price
- $9.35/SY
- Extension
- $58,689.95
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -76.6%
5. Sema Construction, Inc.
- Unit price
- $13.07/SY
- Extension
- $82,040.39
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -67.3%
6. Zachry Construction Corporation
- Unit price
- $5.41/SY
- Extension
- $33,958.57
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -86.5%
Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District
Line quantity 246 SY · Engineer’s estimate $12.00/SY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Big Creek Construction, Ltd.LOW BID | $25.00/SY | $6,150.00 | — | +108.3% | $9,787,627 | $395,153 (4.04%) left on table |
| 2 | Larry Young Paving, Inc. | $9.00/SY | $2,214.00 | -$3,936 | -25% | $10,182,780 | +$395,153 |
| 3 | Knife River Corporation - South | $53.00/SY | $13,038.00 | +$6,888 | +341.7% | $10,424,591 | +$636,964 |
| 4 | Texas Materials Group, Inc. | $24.00/SY | $5,904.00 | -$246.00 | +100% | $12,020,138 | +$2,232,511 |
| 5 | A. L. Helmcamp, Inc. | $36.00/SY | $8,856.00 | +$2,706 | +200% | $12,374,454 | +$2,586,827 |
| 6 | Patin Construction LLC | $25.00/SY | $6,150.00 | $0.000 | +108.3% | $15,629,317 | +$5,841,690 |
| 7 | Joe Bland Construction LLC | $45.00/SY | $11,070.00 | +$4,920 | +275% | $18,492,861 | +$8,705,235 |
1. Big Creek Construction, Ltd.
LOW BID · WINNER- Unit price
- $25.00/SY
- Extension
- $6,150.00
- Proposal total
- $9,787,627
- Money left on the table
- $395,153 (4.04%)
- vs. engineer’s estimate
- +108.3%
- Unit price
- $9.00/SY
- Extension
- $2,214.00
- Proposal total
- $10,182,780
- vs. low bid
- +$395,153
- vs. engineer’s estimate
- -25%
- Unit price
- $53.00/SY
- Extension
- $13,038.00
- Proposal total
- $10,424,591
- vs. low bid
- +$636,964
- vs. engineer’s estimate
- +341.7%
- Unit price
- $24.00/SY
- Extension
- $5,904.00
- Proposal total
- $12,020,138
- vs. low bid
- +$2,232,511
- vs. engineer’s estimate
- +100%
- Unit price
- $36.00/SY
- Extension
- $8,856.00
- Proposal total
- $12,374,454
- vs. low bid
- +$2,586,827
- vs. engineer’s estimate
- +200%
6. Patin Construction LLC
- Unit price
- $25.00/SY
- Extension
- $6,150.00
- Proposal total
- $15,629,317
- vs. low bid
- +$5,841,690
- vs. engineer’s estimate
- +108.3%
7. Joe Bland Construction LLC
- Unit price
- $45.00/SY
- Extension
- $11,070.00
- Proposal total
- $18,492,861
- vs. low bid
- +$8,705,235
- vs. engineer’s estimate
- +275%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6497-55-001 | Denton | Dallas | 217 | 6 | Road Doctors LLC | $100.00 | $45.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 6,277 | 6 | Indus Road & Bridge, Inc. | $12.00 | $40.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 246 | 7 | Big Creek Construction, Ltd. | $25.00 | $12.00 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 134 | 7 | Stx Civil | $21.37 | $14.50 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 20,953.8 | 6 | Austin Bridge & Road Services, LP | $10.00 | $13.60 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 14 | 8 | Coppell Construction Co., Inc. | $380.00 | $50.00 |
| 2026-10-14 | 6507-39-001 | El Paso | El Paso | 700 | 6 | Synergy Project Contractors, Inc. | $9.08 | $33.00 |
| 2026-10-14 | 6485-46-001 | Denton | Dallas | 152 | 6 | Garret Shields Infrastructure | $30.00 | $25.00 |
| 2026-10-14 | 6504-79-001 | Kaufman | Dallas | 40 | 4 | Jackson Excavation, LLC | $10.00 | $25.00 |
| 2026-10-13 | 6505-28-001 | Anderson | Tyler | 12 | 7 | Icos Management, LLC | $400.00 | $40.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 82 | $18.00 | $12.30 | $20.00 | -50% |
| Amarillo | 75 | $21.10 | $15.00 | $30.00 | +77.3% |
| Atlanta | 70 | $12.00 | $12.00 | $9.00 | -24% |
| Austin | 173 | $10.00 | $14.80 | $13.60 | +1.35% |
| Beaumont | 27 | $62.00 | $24.00 | $12.00 | -56% |
| Brownwood | 38 | $25.00 | $15.08 | $36.00 | — |
| Bryan | 66 | $25.00 | $36.00 | $12.00 | +12.5% |
| Childress | 17 | $20.00 | $20.00 | $15.00 | — |
| Corpus Christi | 51 | $18.00 | $18.00 | $20.00 | 0% |
| Dallas | 318 | $14.80 | $12.00 | $20.00 | -16.67% |
| El Paso | 39 | $23.00 | $26.73 | $33.00 | +20% |
| Fort Worth | 88 | $7.00 | $12.00 | $13.00 | -42.86% |
| Houston | 144 | $5.00 | $5.00 | $19.00 | -10% |
| Laredo | 60 | $11.62 | $11.62 | $14.00 | — |
| Lubbock | 56 | $6.00 | $8.49 | $18.00 | -40% |
| Lufkin | 79 | $20.00 | $50.00 | $45.00 | +13.75% |
| Odessa | 48 | $18.00 | $25.00 | $30.00 | -16.67% |
| Paris | 50 | $8.00 | $9.00 | $13.70 | -58.75% |
| Pharr | 78 | $10.00 | $12.55 | $21.00 | -32.62% |
| San Angelo | 31 | $25.00 | $50.00 | $30.00 | -16.67% |
| San Antonio | 239 | $7.32 | $9.00 | $15.00 | -27.23% |
| Tyler | 121 | $8.20 | $9.65 | $35.00 | -37.5% |
| Waco | 84 | $35.00 | $35.00 | $25.00 | +45% |
| Wichita Falls | 40 | $50.00 | $42.00 | $35.00 | +82.22% |
| Yoakum | 100 | $15.00 | $20.00 | $28.00 | +12.2% |
Related items
- 104-7011 · Remov Conc (Driveways) ($18.21/SY)
- 104-7013 · Remov Conc (Sidewalk, Ramp OR SUP) ($15.00/SY)
- 104-7016 · Remov Conc (Curb) ($4.57/LF)
- 100-7002 · Preparing ROW ($1,500.00/STA)
- 110-7001 · Excav (Roadway) ($10.00/CY)
- 110-7002 · Excav (Channel) ($18.00/CY)
- 132-7003 · Embank (FNL)(OC)(TY B) ($15.00/CY)
- 132-7006 · Embank (FNL)(DC)(TY C) ($12.00/CY)