Remov Conc (Sidewalk, Ramp OR SUP) (Item 104-7013): TxDOT Unit Price History

1,292 bids · 223 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure SY

TxDOT 104-7013 · REMOV CONC (SIDEWALK, RAMP OR SUP) · Unit: SY

Low bid
$10.00/SY
Quantity-weighted median of winning unit prices
Weighted median
$15.00/SY
Quantity-weighted median of every bid
Engineer’s estimate
$18.00/SY
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-16.67%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$50.00$100.00$150.00$200.001101001K10K100KQuantity (SY), log scaleUnit price ($/SY)
Winning (low) bid Other bid Fitted price curve (ln price = 4.65 − 0.254·ln qty, R² 0.26)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 104-7013 (Remov Conc (Sidewalk, Ramp OR SUP)) is measured in SY. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,292 bids for it on 223 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 723 bids was $15.00 per SY, and the winning low bidders priced it at a weighted median of $10.00 per SY.

TxDOT's engineer's estimate for the same lines had a weighted median of $18.00 per SY, so winning bids came in 44.4% below the estimate.

By calendar year, the median bid moved from $30.00 in 2025 (548 bids) to $25.50 in 2026 (693 bids), down 15.0%. The middle half of 2026 bids fell between $15.25 and $50.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 16.67%.

Quantity matters for this item. Lines of 6 to 93 SY had a weighted median of $44.30, while lines above 444 SY had $16.50, a 63% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 220 lines where both a winning and a second-place bid were published, the median winning unit price was $25.00 against $26.05 from the second-lowest bidder, a median gap of 12.25% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Atlanta had the lowest weighted median ($12.00) and Bryan the highest ($53.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $10.00 per SY for 304 SY against an estimate of $27.50.

Related items: 104-7006 Remov Conc (Riprap) (weighted median $10.00 per SY); 104-7011 Remov Conc (Driveways) (weighted median $18.21 per SY); 104-7016 Remov Conc (Curb) (weighted median $4.57 per LF); 100-7002 Preparing ROW (weighted median $1,500.00 per STA).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024519$19.80$20.00$32.00$21.82$50.00
2025548100$23.28$20.00$30.00$20.00$50.00
2026693114$19.50$15.00$25.50$15.25$50.00

Quantity bands

BandQuantity (SY)BidsWeighted avgWeighted median25th–75th pct
Small6–93434$64.90$44.30$25.31–$84.75
Medium95–442428$34.30$25.00$19.57–$45.08
Large444–27,346.9430$18.95$16.50$13.45–$29.81

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$25.00
Median second-low unit price
$26.05
Median engineer’s estimate
$28.00
Median gap, second vs. low
+12.25%

220 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 304 SY · Engineer’s estimate $27.50/SY

  • Unit price
    $10.00/SY
    Extension
    $3,040.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -63.6%
  • Unit price
    $12.00/SY
    Extension
    $3,648.00
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    -56.4%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $17.50/SY
    Extension
    $5,320.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    -36.4%
  • 4. Harper Brothers Construction LLC

    Unit price
    $25.50/SY
    Extension
    $7,752.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -7.3%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 825 SY · Engineer’s estimate $12.00/SY

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $10.00/SY
    Extension
    $8,250.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -16.7%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $14.50/SY
    Extension
    $11,962.50
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +20.8%
  • Unit price
    $11.00/SY
    Extension
    $9,075.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -8.3%
  • Unit price
    $16.48/SY
    Extension
    $13,596.00
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    +37.3%
  • 5. Sema Construction, Inc.

    Unit price
    $13.15/SY
    Extension
    $10,848.75
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    +9.6%
  • 6. Zachry Construction Corporation

    Unit price
    $9.01/SY
    Extension
    $7,433.25
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -24.9%

Proposal 0285-03-066 · let Nov 4, 2026 · Hays County, Austin District

Line quantity 26 SY · Engineer’s estimate $40.00/SY

  • 1. Lone Star Sitework, LLC

    LOW BID · WINNER
    Unit price
    $33.50/SY
    Extension
    $871.00
    Proposal total
    $950,337
    Money left on the table
    $133,497 (14.05%)
    vs. engineer’s estimate
    -16.3%
  • 2. Stx Civil

    Unit price
    $13.10/SY
    Extension
    $340.60
    Proposal total
    $1,083,834
    vs. low bid
    +$133,497
    vs. engineer’s estimate
    -67.3%
  • 3. Rucoba & Maya Construction, LLC

    Unit price
    $45.00/SY
    Extension
    $1,170.00
    Proposal total
    $1,103,755
    vs. low bid
    +$153,418
    vs. engineer’s estimate
    +12.5%
  • 4. Myers Concrete Construction, LP

    Unit price
    $88.00/SY
    Extension
    $2,288.00
    Proposal total
    $1,122,792
    vs. low bid
    +$172,455
    vs. engineer’s estimate
    +120%
  • Unit price
    $60.81/SY
    Extension
    $1,581.06
    Proposal total
    $1,135,337
    vs. low bid
    +$185,000
    vs. engineer’s estimate
    +52%
  • Unit price
    $16.00/SY
    Extension
    $416.00
    Proposal total
    $1,199,801
    vs. low bid
    +$249,464
    vs. engineer’s estimate
    -60%
  • 7. Ratliff Hardscape, Ltd.

    Unit price
    $41.40/SY
    Extension
    $1,076.40
    Proposal total
    $1,228,710
    vs. low bid
    +$278,373
    vs. engineer’s estimate
    +3.5%
  • Unit price
    $28.00/SY
    Extension
    $728.00
    Proposal total
    $1,272,000
    vs. low bid
    +$321,663
    vs. engineer’s estimate
    -30%
  • Unit price
    $75.00/SY
    Extension
    $1,950.00
    Proposal total
    $1,700,314
    vs. low bid
    +$749,977
    vs. engineer’s estimate
    +87.5%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas3044Mario Sinacola & Sons Excavating, Inc.$10.00$27.50
2026-11-040195-02-092DentonDallas8256Indus Road & Bridge, Inc.$10.00$12.00
2026-11-040285-03-066HaysAustin269Lone Star Sitework, LLC$33.50$40.00
2026-11-030015-13-432TravisAustin27,346.96Austin Bridge & Road Services, LP$9.00$12.67
2026-11-030045-09-113LamarParis135Drake Companies LLC$95.00$50.00
2026-10-060009-11-248DallasDallas3117Ragle Construction, Inc.$11.40$25.00
2026-10-060590-05-057MilamBryan2410Yoko Excavating, LLC$50.07$26.00
2026-10-062502-01-024BellWaco2236Big Creek Construction, Ltd.$18.00$22.00
2026-09-030051-09-127GalvestonHouston1287Castillo Aranda LLC$20.00$20.00
2026-09-030143-10-058VictoriaYoakum1,71173lw Civil LLC$23.33$35.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene15$21.00$16.81$25.00—
Amarillo41$17.00$20.00$25.000%
Atlanta37$12.00$12.00$12.00-4.2%
Austin71$9.00$14.00$12.67-36.83%
Beaumont15$12.00$16.50$28.00—
Brownwood17$30.00$30.00$22.00—
Bryan54$15.00$53.00$8.00+68.52%
Childress6$20.00$20.00$28.00—
Corpus Christi34$9.63$15.84$9.50-0.5%
Dallas234$20.00$22.00$30.00-46.81%
El Paso26$20.66$24.75$15.57-5.68%
Fort Worth61$21.00$31.50$30.00-8.8%
Houston126$21.00$17.76$318.79-56.2%
Laredo19$12.49$12.49$30.00—
Lubbock16$28.11$28.11$50.00—
Odessa31$22.00$17.67$30.00—
Paris57$25.00$30.00$23.88+29.63%
Pharr83$10.00$15.00$20.00-15.21%
San Angelo14$25.00$25.00$20.00—
San Antonio136$9.00$12.00$18.00-18.33%
Tyler25$18.00$18.00$21.00-48.33%
Waco66$18.00$28.00$25.00+8.86%
Wichita Falls16$8.00$16.04$30.00—
Yoakum92$23.33$25.00$35.00+40%

Related items