3,913 bids · 591 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure STA

TxDOT 100-7002 · PREPARING ROW · Unit: STA

Low bid
$995.00/STA
Quantity-weighted median of winning unit prices
Weighted median
$1,500.00/STA
Quantity-weighted median of every bid
Engineer’s estimate
$1,500.00/STA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-25.04%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$20,000.00$40,000.00$60,000.00$80,000.001101001KQuantity (STA), log scaleUnit price ($/STA)
Winning (low) bid Other bid Fitted price curve (ln price = 8.89 − 0.293·ln qty, R² 0.08)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 100-7002 (Preparing ROW) is measured in STA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 3,913 bids for it on 591 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 2,036 bids was $1,500.00 per STA, and the winning low bidders priced it at a weighted median of $995.00 per STA.

TxDOT's engineer's estimate for the same lines had a weighted median of $1,500.00 per STA, so winning bids came in 33.7% below the estimate.

By calendar year, the median bid moved from $3,047.40 in 2025 (1,884 bids) to $2,500.00 in 2026 (1,885 bids), down 18.0%. The middle half of 2026 bids fell between $1,000.00 and $6,500.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 25.04%.

Quantity matters for this item. Lines of 1 to 13 STA had a weighted median of $4,000.00, while lines above 86 STA had $1,350.00, a 66% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 586 lines where both a winning and a second-place bid were published, the median winning unit price was $1,782.23 against $2,047.50 from the second-lowest bidder, a median gap of 7.14% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Amarillo had the lowest weighted median ($19.13) and Wichita Falls the highest ($12,000.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $10,865.00 per STA for 138 STA against an estimate of $13,632.00.

12 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 104-7006 Remov Conc (Riprap) (weighted median $10.00 per SY); 104-7011 Remov Conc (Driveways) (weighted median $18.21 per SY); 104-7013 Remov Conc (Sidewalk, Ramp OR SUP) (weighted median $15.00 per SY); 104-7016 Remov Conc (Curb) (weighted median $4.57 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
202414422$9,491.15$1,945.00$5,250.00$2,000.00$11,557.78
20251,884297$6,923.08$1,500.00$3,047.40$1,197.50$7,625.00
20261,885274$9,300.17$1,600.00$2,500.00$1,000.00$6,500.00

Quantity bands

BandQuantity (STA)BidsWeighted avgWeighted median25th–75th pct
Small1–131,315$16,333.17$4,000.00$2,100.00–$10,000.00
Medium13.1–84.981,302$12,599.92$2,500.00$1,100.00–$7,387.50
Large86–1,5671,296$7,234.37$1,350.00$577.38–$4,489.45

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$1,782.23
Median second-low unit price
$2,047.50
Median engineer’s estimate
$2,900.00
Median gap, second vs. low
+7.14%

586 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 138 STA · Engineer’s estimate $13,632/STA

  • Unit price
    $10,865.00/STA
    Extension
    $1,499,370.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -20.3%
  • Unit price
    $4,000.00/STA
    Extension
    $552,000.00
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    -70.7%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $8,190.00/STA
    Extension
    $1,130,220.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    -39.9%
  • 4. Harper Brothers Construction LLC

    Unit price
    $6,000.00/STA
    Extension
    $828,000.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -56%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 130.066 STA · Engineer’s estimate $48,650/STA

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $36,031.36/STA
    Extension
    $4,686,454.87
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -25.9%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $14,906.00/STA
    Extension
    $1,938,763.80
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -69.4%
  • Unit price
    $42,800.00/STA
    Extension
    $5,566,824.80
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -12%
  • Unit price
    $56,900.00/STA
    Extension
    $7,400,755.40
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    +17%
  • 5. Sema Construction, Inc.

    Unit price
    $115,121.70/STA
    Extension
    $14,973,419.03
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    +136.6%
  • 6. Zachry Construction Corporation

    Unit price
    $115,326.07/STA
    Extension
    $15,000,000.62
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    +137.1%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 150.5 STA · Engineer’s estimate $1,500/STA

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $4,376.74/STA
    Extension
    $658,699.37
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +191.8%
  • Unit price
    $2,500.00/STA
    Extension
    $376,250.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    +66.7%
  • Unit price
    $595.72/STA
    Extension
    $89,655.86
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -60.3%
  • Unit price
    $2,000.00/STA
    Extension
    $301,000.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +33.3%
  • Unit price
    $25,225.00/STA
    Extension
    $3,796,362.50
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    +1,581.7%
  • Unit price
    $5,500.00/STA
    Extension
    $827,750.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    +266.7%
  • Unit price
    $2,000.00/STA
    Extension
    $301,000.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    +33.3%
  • Unit price
    $2,000.00/STA
    Extension
    $301,000.00
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +33.3%
  • 9. Zachry Construction Corporation

    Unit price
    $26,578.07/STA
    Extension
    $3,999,999.54
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +1,671.9%
  • 10. Brizo Construction, LLC

    Unit price
    $3,000.00/STA
    Extension
    $451,500.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +100%
  • Unit price
    $24,750.00/STA
    Extension
    $3,724,875.00
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    +1,550%
  • Unit price
    $3,500.00/STA
    Extension
    $526,750.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +133.3%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas1384Mario Sinacola & Sons Excavating, Inc.$10,865.00$13,632.00
2026-11-040195-02-092DentonDallas130.076Indus Road & Bridge, Inc.$36,031.36$48,650.00
2026-11-040212-03-058BrazosBryan150.512Fluor Enterprises, Inc.$4,376.74$1,500.00
2026-11-040262-01-034MilamBryan2757Big Creek Construction, Ltd.$750.00$625.00
2026-11-040353-01-031WiseFort Worth137Xit Paving and Construction Inc.$2,100.00$5,067.00
2026-11-040922-33-234WebbLaredo117Stx Civil$1,994.88$2,500.00
2026-11-040947-03-034JasperBeaumont102Texas Materials Group, Inc.$4,235.00$2,000.00
2026-11-041017-03-040HuntParis2819Highway 19 Construction LLC$543.00$900.00
2026-11-041052-02-098NuecesCorpus Christi285J E Construction Services, LLC$1,160.00$3,500.00
2026-11-030015-13-432TravisAustin206.056Austin Bridge & Road Services, LP$175,000.00$105,638.78

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene72$1,400.00$2,500.00$5,000.00-68.35%
Amarillo20$11.65$19.13$100.00—
Atlanta117$1,000.00$1,950.00$1,500.00-11.38%
Austin292$700.00$800.00$1,500.00-54%
Beaumont88$750.00$750.00$1,000.00-27.67%
Brownwood34$950.00$950.00$800.00—
Bryan224$1,144.00$1,260.00$1,500.00+10%
Childress37$2,750.00$2,900.00$4,000.00—
Corpus Christi131$166.79$272.15$260.00-84.45%
Dallas522$500.00$1,100.00$700.00-8.75%
El Paso21$986.97$5,000.00$7,500.00—
Fort Worth334$300.00$800.00$1,500.000%
Houston196$6,550.00$12,000.00$4,500.00-16.53%
Laredo89$1,451.88$2,000.00$3,500.00+76.11%
Lubbock18$4,000.00$12,000.00$9,000.00—
Lufkin129$1,600.00$2,700.00$3,000.00-23.08%
Odessa27$1,500.00$10,000.00$10,000.00+3.6%
Paris317$633.17$700.00$950.000%
Pharr154$2,000.00$2,500.00$2,500.00-37.46%
San Angelo34$10,500.00$5,000.00$6,000.00+45.38%
San Antonio218$800.00$2,000.00$4,500.00+4.23%
Tyler177$3,500.00$3,400.00$3,250.00+8.76%
Waco189$320.00$500.00$950.00-55%
Wichita Falls61$12,000.00$12,000.00$5,000.00+5%
Yoakum412$2,181.15$3,400.00$2,500.00-8.93%

Related items

Is your price for item 100-7002 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.