Remov Conc (Curb) (Item 104-7016): TxDOT Unit Price History
1,064 bids · 193 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF
TxDOT 104-7016 · REMOV CONC (CURB) · Unit: LF
- Low bid
- $4.40/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $4.57/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $7.00/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -39.74%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 104-7016 (Remov Conc (Curb)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,064 bids for it on 193 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 583 bids was $4.57 per LF, and the winning low bidders priced it at a weighted median of $4.40 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $7.00 per LF, so winning bids came in 37.1% below the estimate.
By calendar year, the median bid moved from $16.00 in 2025 (483 bids) to $10.00 in 2026 (544 bids), down 37.5%. The middle half of 2026 bids fell between $5.49 and $20.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 39.74%.
Quantity matters for this item. Lines of 5 to 132 LF had a weighted median of $20.00, while lines above 739 LF had $5.00, a 75% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 188 lines where both a winning and a second-place bid were published, the median winning unit price was $10.45 against $15.00 from the second-lowest bidder, a median gap of 10.91% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 21 TxDOT districts with at least ten bids, San Antonio had the lowest weighted median ($3.12) and Beaumont the highest ($22.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $1.00 per LF for 955 LF against an estimate of $11.80.
2 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 104-7006 Remov Conc (Riprap) (weighted median $10.00 per SY); 104-7011 Remov Conc (Driveways) (weighted median $18.21 per SY); 104-7013 Remov Conc (Sidewalk, Ramp OR SUP) (weighted median $15.00 per SY); 100-7002 Preparing ROW (weighted median $1,500.00 per STA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 37 | 6 | $12.56 | $10.00 | $10.00 | $5.75 | $20.00 |
| 2025 | 483 | 94 | $7.88 | $4.57 | $16.00 | $9.95 | $28.40 |
| 2026 | 544 | 93 | $7.54 | $5.00 | $10.00 | $5.49 | $20.00 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 5–132 | 364 | $27.68 | $20.00 | $12.00–$40.00 |
| Medium | 135–716 | 345 | $16.14 | $12.50 | $9.00–$21.24 |
| Large | 739–52,928 | 355 | $6.78 | $5.00 | $4.45–$13.18 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $10.45
- Median second-low unit price
- $15.00
- Median engineer’s estimate
- $15.00
- Median gap, second vs. low
- +10.91%
188 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 955 LF · Engineer’s estimate $11.80/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $1.00/LF | $955.00 | — | -91.5% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $10.00/LF | $9,550.00 | +$8,595 | -15.3% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $4.00/LF | $3,820.00 | +$2,865 | -66.1% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $8.00/LF | $7,640.00 | +$6,685 | -32.2% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $1.00/LF
- Extension
- $955.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -91.5%
- Unit price
- $10.00/LF
- Extension
- $9,550.00
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- -15.3%
3. Tiseo Paving Company, LLC
- Unit price
- $4.00/LF
- Extension
- $3,820.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- -66.1%
4. Harper Brothers Construction LLC
- Unit price
- $8.00/LF
- Extension
- $7,640.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -32.2%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 107 LF · Engineer’s estimate $22.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $6.50/LF | $695.50 | — | -70.5% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $25.00/LF | $2,675.00 | +$1,980 | +13.6% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $3.00/LF | $321.00 | -$374.50 | -86.4% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $20.00/LF | $2,140.00 | +$1,445 | -9.1% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $4.45/LF | $476.15 | -$219.35 | -79.8% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $33.00/LF | $3,531.00 | +$2,836 | +50% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $35.00/LF | $3,745.00 | +$3,050 | +59.1% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $2.30/LF | $246.10 | -$449.40 | -89.5% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $10.79/LF | $1,154.53 | +$459.03 | -51% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $5.50/LF | $588.50 | -$107.00 | -75% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $5.45/LF | $583.15 | -$112.35 | -75.2% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $50.00/LF | $5,350.00 | +$4,655 | +127.3% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $6.50/LF
- Extension
- $695.50
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- -70.5%
- Unit price
- $25.00/LF
- Extension
- $2,675.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- +13.6%
- Unit price
- $3.00/LF
- Extension
- $321.00
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- -86.4%
- Unit price
- $20.00/LF
- Extension
- $2,140.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- -9.1%
- Unit price
- $4.45/LF
- Extension
- $476.15
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- -79.8%
- Unit price
- $33.00/LF
- Extension
- $3,531.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- +50%
- Unit price
- $35.00/LF
- Extension
- $3,745.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- +59.1%
- Unit price
- $2.30/LF
- Extension
- $246.10
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- -89.5%
9. Zachry Construction Corporation
- Unit price
- $10.79/LF
- Extension
- $1,154.53
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- -51%
10. Brizo Construction, LLC
- Unit price
- $5.50/LF
- Extension
- $588.50
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- -75%
- Unit price
- $5.45/LF
- Extension
- $583.15
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -75.2%
- Unit price
- $50.00/LF
- Extension
- $5,350.00
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +127.3%
Proposal 0923-06-068 · let Nov 4, 2026 · Brown County, Brownwood District
Line quantity 35 LF · Engineer’s estimate $35.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Jay Mills Contracting, IncorporatedLOW BID | $21.00/LF | $735.00 | — | -40% | $1,561,729 | $122,095 (7.82%) left on table |
| 2 | Lone Star Paving Company | $17.00/LF | $595.00 | -$140.00 | -51.4% | $1,683,823 | +$122,095 |
| 3 | Prater Dirt Work LLC | $40.00/LF | $1,400.00 | +$665.00 | +14.3% | $1,759,351 | +$197,622 |
| 4 | Big Creek Construction, Ltd. | $30.00/LF | $1,050.00 | +$315.00 | -14.3% | $1,774,687 | +$212,959 |
| 5 | Texas Materials Group, Inc. | $75.00/LF | $2,625.00 | +$1,890 | +114.3% | $2,220,638 | +$658,910 |
| 6 | Ck Newberry, LLC | $200.00/LF | $7,000.00 | +$6,265 | +471.4% | $2,399,186 | +$837,457 |
1. Jay Mills Contracting, Incorporated
LOW BID · WINNER- Unit price
- $21.00/LF
- Extension
- $735.00
- Proposal total
- $1,561,729
- Money left on the table
- $122,095 (7.82%)
- vs. engineer’s estimate
- -40%
- Unit price
- $17.00/LF
- Extension
- $595.00
- Proposal total
- $1,683,823
- vs. low bid
- +$122,095
- vs. engineer’s estimate
- -51.4%
3. Prater Dirt Work LLC
- Unit price
- $40.00/LF
- Extension
- $1,400.00
- Proposal total
- $1,759,351
- vs. low bid
- +$197,622
- vs. engineer’s estimate
- +14.3%
- Unit price
- $30.00/LF
- Extension
- $1,050.00
- Proposal total
- $1,774,687
- vs. low bid
- +$212,959
- vs. engineer’s estimate
- -14.3%
- Unit price
- $75.00/LF
- Extension
- $2,625.00
- Proposal total
- $2,220,638
- vs. low bid
- +$658,910
- vs. engineer’s estimate
- +114.3%
- Unit price
- $200.00/LF
- Extension
- $7,000.00
- Proposal total
- $2,399,186
- vs. low bid
- +$837,457
- vs. engineer’s estimate
- +471.4%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 955 | 4 | Mario Sinacola & Sons Excavating, Inc. | $1.00 | $11.80 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 107 | 12 | Fluor Enterprises, Inc. | $6.50 | $22.00 |
| 2026-11-04 | 0923-06-068 | Brown | Brownwood | 35 | 6 | Jay Mills Contracting, Incorporated | $21.00 | $35.00 |
| 2026-10-14 | 6507-39-001 | El Paso | El Paso | 700 | 6 | Synergy Project Contractors, Inc. | $11.35 | $5.50 |
| 2026-10-14 | 6504-79-001 | Kaufman | Dallas | 25 | 4 | Jackson Excavation, LLC | $5.00 | $40.00 |
| 2026-10-07 | 0196-03-288 | Dallas | Dallas | 17 | 9 | Garret Shields Infrastructure | $20.00 | $45.00 |
| 2026-10-07 | 0510-06-024 | Fannin | Paris | 281 | 6 | A. K. Gillis & Sons, LLC | $5.00 | $15.00 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 634 | 10 | Highway 19 Construction LLC | $10.00 | $15.00 |
| 2026-10-06 | 2502-01-024 | Bell | Waco | 1,782 | 6 | Big Creek Construction, Ltd. | $5.00 | $7.00 |
| 2026-08-06 | 0018-05-089 | Webb | Laredo | 8,693 | 4 | Pulice Construction, Inc. | $2.10 | $3.50 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 8 | $11.00 | $10.00 | $14.00 | — |
| Amarillo | 13 | $9.95 | $9.48 | $15.00 | — |
| Atlanta | 24 | $5.00 | $6.00 | $9.50 | — |
| Austin | 46 | $6.00 | $10.00 | $17.00 | — |
| Beaumont | 28 | $21.75 | $22.00 | $19.00 | +13.64% |
| Brownwood | 23 | $24.00 | $15.00 | $16.00 | — |
| Bryan | 39 | $35.00 | $15.00 | $25.00 | -6.67% |
| Corpus Christi | 8 | $3.00 | $7.00 | $10.00 | — |
| Dallas | 207 | $10.00 | $12.00 | $12.00 | -38.75% |
| El Paso | 50 | $4.40 | $4.40 | $8.00 | -1.71% |
| Fort Worth | 68 | $12.00 | $8.50 | $13.00 | +27.27% |
| Houston | 123 | $3.86 | $5.00 | $7.00 | -41.67% |
| Laredo | 36 | $2.10 | $3.79 | $3.50 | -83.9% |
| Lubbock | 10 | $10.00 | $7.50 | $19.00 | — |
| Lufkin | 33 | $5.00 | $5.00 | $15.00 | -84.21% |
| Odessa | 38 | $2.33 | $8.00 | $12.00 | -55.04% |
| Paris | 28 | $1.40 | $9.00 | $9.60 | -38.35% |
| Pharr | 27 | $3.00 | $15.00 | $10.00 | — |
| San Angelo | 8 | $20.00 | $65.00 | $19.00 | — |
| San Antonio | 156 | $3.00 | $3.12 | $7.00 | -35.98% |
| Tyler | 21 | $6.00 | $18.00 | $20.00 | -32.36% |
| Waco | 33 | $5.00 | $6.75 | $7.00 | -50% |
| Wichita Falls | 11 | $8.00 | $13.50 | $15.00 | — |
| Yoakum | 26 | $9.25 | $10.00 | $20.00 | — |
Related items
- 104-7006 · Remov Conc (Riprap) ($10.00/SY)
- 104-7011 · Remov Conc (Driveways) ($18.21/SY)
- 104-7013 · Remov Conc (Sidewalk, Ramp OR SUP) ($15.00/SY)
- 100-7002 · Preparing ROW ($1,500.00/STA)
- 110-7001 · Excav (Roadway) ($10.00/CY)
- 110-7002 · Excav (Channel) ($18.00/CY)
- 132-7003 · Embank (FNL)(OC)(TY B) ($15.00/CY)
- 132-7006 · Embank (FNL)(DC)(TY C) ($12.00/CY)
Is your price for item 104-7016 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.