Synergy Project Contractors, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: SYNERGY PROJECT CONTRACTORS, INC. · Data as published by TxDOT, lettings Dec 4, 2024 to Oct 14, 2026, retrieved Nov 24, 2026.
Proposals bid
19
Low bids (rank 1)
4
Win rate
21.05%
Low-bid value
$5M
Money left on table
$1.1M
Avg. bid vs. estimate
+16.8%
From Dec 4, 2024 to Oct 14, 2026, Synergy Project Contractors, Inc. submitted 19 bids on TxDOT proposals and was the apparent low bidder on 4 of them (21.05%), with low bids totalling $5,016,911. In 4 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,103,039 (21.99% of those bids); the median gap was 4.01%. On average its bids came in 16.8% above TxDOT's engineer's estimate. Its most frequent district was El Paso (19 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.