Synergy Project Contractors, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: SYNERGY PROJECT CONTRACTORS, INC. · Data as published by TxDOT, lettings Dec 4, 2024 to Oct 14, 2026, retrieved Nov 24, 2026.

Proposals bid
19
Low bids (rank 1)
4
Win rate
21.05%
Low-bid value
$5M
Money left on table
$1.1M
Avg. bid vs. estimate
+16.8%

From Dec 4, 2024 to Oct 14, 2026, Synergy Project Contractors, Inc. submitted 19 bids on TxDOT proposals and was the apparent low bidder on 4 of them (21.05%), with low bids totalling $5,016,911. In 4 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,103,039 (21.99% of those bids); the median gap was 4.01%. On average its bids came in 16.8% above TxDOT's engineer's estimate. Its most frequent district was El Paso (19 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
202510110.0%$1,271,955
20268337.5%$3,744,956

Head-to-head rivals

BidderProposals togetherRanked ahead
International Eagle Enterprises, Inc.105 of 10
Hawk Construction87 of 8
Dan Williams Company74 of 7
Apache Barricade & Sign40 of 4
B & Ms Construction, Inc.30 of 3
Icos Management, LLC32 of 3
O. Trevino Construction, LLC32 of 3
Structural Integrity Group LLC32 of 3

Districts and work types

DistrictBids
El Paso19
Work type of low bidsLow bids
Routine Maintenance Project2
Pedestrian, Sidewalks & Curb Ramps1
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-12-116489-59-001El PasoInternational Eagle Enterprises, Inc.$870,050$872,876+0.3%
2026-05-056497-76-001CulbersonO. Trevino Construction, LLC$1,917,794$1,980,499+3.3%
2026-08-056504-80-001El PasoWinding Road Construction, Inc.$1,772,400$2,168,550+22.4%
2025-10-146484-69-001El PasoInternational Eagle Enterprises, Inc.$863,550$1,081,985+25.3%
2025-12-036489-56-001El PasoHawk Construction$1,469,600$1,884,317+28.2%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-10-146507-39-001El PasoRoutine Maintenance Project1 of 6$845,627—+4.4%
2026-08-056504-80-001El PasoRoutine Maintenance Project2 of 6$2,168,550+22.4%-10.8%
2026-05-056497-76-001CulbersonRoutine Maintenance Project2 of 2$1,980,499+3.3%+99.1%
2026-05-056498-81-001El PasoRoutine Maintenance Project1 of 3$1,650,378—+65.2%
2026-04-080674-01-083El PasoPedestrian, Sidewalks & Curb Ramps1 of 6$1,248,951—-4.5%
2026-03-050924-00-160El PasoTransportation Non-Roadway5 of 6$437,167+36.4%+16.9%
2026-03-046493-40-001El PasoBridge Preventative Maintenance5 of 10$1,190,555+16.1%-7.8%
2026-03-036493-97-001El PasoRoutine Maintenance Project3 of 3$66,816+54.7%+23.7%
2025-12-116489-59-001El PasoRoutine Maintenance Project2 of 3$872,876+0.3%-5%
2025-12-096463-91-001El PasoBridge Preventative Maintenance - Sealed4 of 7$830,734+49.4%-3.5%
2025-12-036489-56-001El PasoRoutine Maintenance Project2 of 3$1,884,317+28.2%+24.1%
2025-10-146484-69-001El PasoRoutine Maintenance Project2 of 3$1,081,985+25.3%+8.8%