Excav (Channel) (Item 110-7002): TxDOT Unit Price History
1,465 bids · 207 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure CY
TxDOT 110-7002 · EXCAV (CHANNEL) · Unit: CY
- Low bid
- $8.60/CY
- Quantity-weighted median of winning unit prices
- Weighted median
- $18.00/CY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $17.00/CY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -20.14%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 110-7002 (Excav (Channel)) is measured in CY. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 1,465 bids for it on 207 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 752 bids was $18.00 per CY, and the winning low bidders priced it at a weighted median of $8.60 per CY.
TxDOT's engineer's estimate for the same lines had a weighted median of $17.00 per CY, so winning bids came in 49.4% below the estimate.
By calendar year, the median bid moved from $35.00 in 2025 (721 bids) to $27.90 in 2026 (693 bids), down 20.3%. The middle half of 2026 bids fell between $18.00 and $50.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 20.14%.
Quantity matters for this item. Lines of 2 to 243 CY had a weighted median of $50.00, while lines above 1,005 CY had $18.00, a 64% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 202 lines where both a winning and a second-place bid were published, the median winning unit price was $25.00 against $30.00 from the second-lowest bidder, a median gap of 18.33% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 21 TxDOT districts with at least ten bids, Pharr had the lowest weighted median ($12.00) and Wichita Falls the highest ($70.00). The busiest district for this item was Yoakum.
The most recent letting with this item was on Nov 12, 2026 in Denton County, where Road Doctors LLC was the low bidder at $60.00 per CY for 89 CY against an estimate of $40.00.
15 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 110-7001 Excav (Roadway) (weighted median $10.00 per CY); 104-7006 Remov Conc (Riprap) (weighted median $10.00 per SY); 104-7011 Remov Conc (Driveways) (weighted median $18.21 per SY); 104-7013 Remov Conc (Sidewalk, Ramp OR SUP) (weighted median $15.00 per SY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 51 | 7 | $26.84 | $25.00 | $29.00 | $20.00 | $50.50 |
| 2025 | 721 | 107 | $26.70 | $21.00 | $35.00 | $24.00 | $60.00 |
| 2026 | 693 | 93 | $20.28 | $17.70 | $27.90 | $18.00 | $50.00 |
Quantity bands
| Band | Quantity (CY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 2–243 | 494 | $69.97 | $50.00 | $35.00–$100.00 |
| Medium | 250–987 | 487 | $33.48 | $27.35 | $20.00–$41.50 |
| Large | 1,005–67,198.9 | 484 | $20.02 | $18.00 | $15.22–$30.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $25.00
- Median second-low unit price
- $30.00
- Median engineer’s estimate
- $30.00
- Median gap, second vs. low
- +18.33%
202 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6497-55-001 · let Nov 12, 2026 · Denton County, Dallas District
Line quantity 89 CY · Engineer’s estimate $40.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Road Doctors LLCLOW BID | $60.00/CY | $5,340.00 | — | +50% | $493,320 | $25,748 (5.22%) left on table |
| 2 | Icos Management, LLC | $105.00/CY | $9,345.00 | +$4,005 | +162.5% | $519,068 | +$25,748 |
| 3 | Texas Road Construction, LLC | $25.00/CY | $2,225.00 | -$3,115 | -37.5% | $567,220 | +$73,900 |
| 4 | Rear Contractors LLC | $100.00/CY | $8,900.00 | +$3,560 | +150% | $598,798 | +$105,478 |
| 5 | Premier Contractors LLC | $120.00/CY | $10,680.00 | +$5,340 | +200% | $654,688 | +$161,368 |
| 6 | Jr West Texas Concrete LLC | $49.00/CY | $4,361.00 | -$979.00 | +22.5% | $746,209 | +$252,889 |
- LOW BID · WINNER
- Unit price
- $60.00/CY
- Extension
- $5,340.00
- Proposal total
- $493,320
- Money left on the table
- $25,748 (5.22%)
- vs. engineer’s estimate
- +50%
- Unit price
- $105.00/CY
- Extension
- $9,345.00
- Proposal total
- $519,068
- vs. low bid
- +$25,748
- vs. engineer’s estimate
- +162.5%
- Unit price
- $25.00/CY
- Extension
- $2,225.00
- Proposal total
- $567,220
- vs. low bid
- +$73,900
- vs. engineer’s estimate
- -37.5%
- Unit price
- $100.00/CY
- Extension
- $8,900.00
- Proposal total
- $598,798
- vs. low bid
- +$105,478
- vs. engineer’s estimate
- +150%
- Unit price
- $120.00/CY
- Extension
- $10,680.00
- Proposal total
- $654,688
- vs. low bid
- +$161,368
- vs. engineer’s estimate
- +200%
6. Jr West Texas Concrete LLC
- Unit price
- $49.00/CY
- Extension
- $4,361.00
- Proposal total
- $746,209
- vs. low bid
- +$252,889
- vs. engineer’s estimate
- +22.5%
Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District
Line quantity 1,540 CY · Engineer’s estimate $20.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Stx CivilLOW BID | $18.96/CY | $29,198.40 | — | -5.2% | $2,866,785 | $83,215 (2.9%) left on table |
| 2 | Delgado's Contractors, LLC | $25.00/CY | $38,500.00 | +$9,302 | +25% | $2,950,000 | +$83,215 |
| 3 | Acee Construction LLC. | $20.00/CY | $30,800.00 | +$1,602 | 0% | $3,033,273 | +$166,488 |
| 4 | James Construction Group, LLC | $25.67/CY | $39,531.80 | +$10,333 | +28.4% | $3,261,472 | +$394,687 |
| 5 | E-Z Bel Construction, LLC | $25.00/CY | $38,500.00 | +$9,302 | +25% | $3,270,969 | +$404,184 |
| 6 | Lucania Contractors LLC | $15.00/CY | $23,100.00 | -$6,098 | -25% | $3,466,015 | +$599,230 |
| 7 | Foremost Paving, Inc. | $10.00/CY | $15,400.00 | -$13,798 | -50% | $5,083,300 | +$2,216,516 |
1. Stx Civil
LOW BID · WINNER- Unit price
- $18.96/CY
- Extension
- $29,198.40
- Proposal total
- $2,866,785
- Money left on the table
- $83,215 (2.9%)
- vs. engineer’s estimate
- -5.2%
- Unit price
- $25.00/CY
- Extension
- $38,500.00
- Proposal total
- $2,950,000
- vs. low bid
- +$83,215
- vs. engineer’s estimate
- +25%
3. Acee Construction LLC.
- Unit price
- $20.00/CY
- Extension
- $30,800.00
- Proposal total
- $3,033,273
- vs. low bid
- +$166,488
- vs. engineer’s estimate
- 0%
- Unit price
- $25.67/CY
- Extension
- $39,531.80
- Proposal total
- $3,261,472
- vs. low bid
- +$394,687
- vs. engineer’s estimate
- +28.4%
- Unit price
- $25.00/CY
- Extension
- $38,500.00
- Proposal total
- $3,270,969
- vs. low bid
- +$404,184
- vs. engineer’s estimate
- +25%
- Unit price
- $15.00/CY
- Extension
- $23,100.00
- Proposal total
- $3,466,015
- vs. low bid
- +$599,230
- vs. engineer’s estimate
- -25%
- Unit price
- $10.00/CY
- Extension
- $15,400.00
- Proposal total
- $5,083,300
- vs. low bid
- +$2,216,516
- vs. engineer’s estimate
- -50%
Proposal 0923-06-068 · let Nov 4, 2026 · Brown County, Brownwood District
Line quantity 60 CY · Engineer’s estimate $40.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Jay Mills Contracting, IncorporatedLOW BID | $60.00/CY | $3,600.00 | — | +50% | $1,561,729 | $122,095 (7.82%) left on table |
| 2 | Lone Star Paving Company | $105.00/CY | $6,300.00 | +$2,700 | +162.5% | $1,683,823 | +$122,095 |
| 3 | Prater Dirt Work LLC | $50.00/CY | $3,000.00 | -$600.00 | +25% | $1,759,351 | +$197,622 |
| 4 | Big Creek Construction, Ltd. | $65.00/CY | $3,900.00 | +$300.00 | +62.5% | $1,774,687 | +$212,959 |
| 5 | Texas Materials Group, Inc. | $63.00/CY | $3,780.00 | +$180.00 | +57.5% | $2,220,638 | +$658,910 |
| 6 | Ck Newberry, LLC | $200.00/CY | $12,000.00 | +$8,400 | +400% | $2,399,186 | +$837,457 |
1. Jay Mills Contracting, Incorporated
LOW BID · WINNER- Unit price
- $60.00/CY
- Extension
- $3,600.00
- Proposal total
- $1,561,729
- Money left on the table
- $122,095 (7.82%)
- vs. engineer’s estimate
- +50%
- Unit price
- $105.00/CY
- Extension
- $6,300.00
- Proposal total
- $1,683,823
- vs. low bid
- +$122,095
- vs. engineer’s estimate
- +162.5%
3. Prater Dirt Work LLC
- Unit price
- $50.00/CY
- Extension
- $3,000.00
- Proposal total
- $1,759,351
- vs. low bid
- +$197,622
- vs. engineer’s estimate
- +25%
- Unit price
- $65.00/CY
- Extension
- $3,900.00
- Proposal total
- $1,774,687
- vs. low bid
- +$212,959
- vs. engineer’s estimate
- +62.5%
- Unit price
- $63.00/CY
- Extension
- $3,780.00
- Proposal total
- $2,220,638
- vs. low bid
- +$658,910
- vs. engineer’s estimate
- +57.5%
- Unit price
- $200.00/CY
- Extension
- $12,000.00
- Proposal total
- $2,399,186
- vs. low bid
- +$837,457
- vs. engineer’s estimate
- +400%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6497-55-001 | Denton | Dallas | 89 | 6 | Road Doctors LLC | $60.00 | $40.00 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 1,540 | 7 | Stx Civil | $18.96 | $20.00 |
| 2026-11-04 | 0923-06-068 | Brown | Brownwood | 60 | 6 | Jay Mills Contracting, Incorporated | $60.00 | $40.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 46 | 9 | Highway 19 Construction LLC | $25.00 | $23.00 |
| 2026-11-03 | 0917-30-068 | Burleson | Bryan | 91 | 15 | C & W Southern LLC | $20.00 | $30.00 |
| 2026-10-15 | 6506-36-001 | McLennan | Waco | 1,235 | 2 | Krimatt Services LLC | $25.00 | $10.63 |
| 2026-10-07 | 0510-06-024 | Fannin | Paris | 98 | 6 | A. K. Gillis & Sons, LLC | $75.00 | $25.00 |
| 2026-10-07 | 0922-20-030 | La Salle | Laredo | 39 | 6 | Presidio Contracting, LLC | $76.00 | $50.00 |
| 2026-10-07 | 6493-26-001 | Wise | Fort Worth | 7,308.21 | 7 | Shalom Services Corporation | $8.00 | $26.00 |
| 2026-10-07 | 6503-72-001 | Lampasas | Brownwood | 243 | 9 | Taylor Bridge LLC | $25.00 | $85.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 28 | $32.00 | $25.00 | $27.00 | — |
| Amarillo | 16 | $25.00 | $20.00 | $14.00 | — |
| Atlanta | 39 | $12.00 | $40.00 | $50.00 | -11.67% |
| Austin | 10 | $18.88 | $40.00 | $23.00 | — |
| Beaumont | 25 | $12.00 | $23.00 | $25.00 | — |
| Brownwood | 52 | $25.00 | $65.00 | $85.00 | +102.97% |
| Bryan | 56 | $18.00 | $20.00 | $29.00 | -19.4% |
| Childress | 51 | $15.00 | $22.25 | $30.00 | -16.3% |
| Corpus Christi | 36 | $8.00 | $24.21 | $23.00 | -5.04% |
| Dallas | 67 | $8.00 | $23.00 | $18.00 | +12.9% |
| El Paso | 8 | $30.00 | $37.68 | $20.00 | — |
| Fort Worth | 57 | $8.00 | $25.00 | $26.00 | -33.33% |
| Houston | 97 | $8.60 | $20.00 | $15.00 | -50% |
| Laredo | 18 | $18.96 | $25.00 | $20.00 | — |
| Lubbock | 5 | $16.60 | $26.00 | $15.00 | — |
| Lufkin | 6 | $12.00 | $25.39 | $70.00 | — |
| Paris | 185 | $10.00 | $20.00 | $20.00 | -50% |
| Pharr | 40 | $5.00 | $12.00 | $17.00 | -69.08% |
| San Angelo | 24 | $8.53 | $22.00 | $0.360 | — |
| San Antonio | 131 | $25.00 | $22.60 | $50.00 | -30% |
| Tyler | 54 | $17.30 | $35.00 | $20.00 | +118.75% |
| Waco | 120 | $12.00 | $25.00 | $25.00 | 0% |
| Wichita Falls | 75 | $50.00 | $70.00 | $12.00 | +97.67% |
| Yoakum | 265 | $18.00 | $18.81 | $20.00 | -20% |
Related items
- 110-7001 · Excav (Roadway) ($10.00/CY)
- 104-7006 · Remov Conc (Riprap) ($10.00/SY)
- 104-7011 · Remov Conc (Driveways) ($18.21/SY)
- 104-7013 · Remov Conc (Sidewalk, Ramp OR SUP) ($15.00/SY)
- 104-7016 · Remov Conc (Curb) ($4.57/LF)
- 100-7002 · Preparing ROW ($1,500.00/STA)
- 132-7003 · Embank (FNL)(OC)(TY B) ($15.00/CY)
- 132-7006 · Embank (FNL)(DC)(TY C) ($12.00/CY)
Is your price for item 110-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.