Guardrail -Roadway, General TL-3 (Item 0536 1 1): FDOT Unit Price History

76 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$24.61/LF
Contracts (12 mo)
76
Total quantity (12 mo)
235,547 LF
Total amount (12 mo)
$5,797,979

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3194$22.48582,724$13,097,955
20252025-01-01 – 2025-12-3194$23.96403,016$9,654,565
Latest 12 months2025-11-01 – 2026-10-3176$24.61235,547$5,797,979

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
015$32.66+32.7%2,838
027$27.92+13.4%17,439
035$24.77+0.7%16,691
047$33.65+36.7%11,714
057$21.57-12.4%19,347
061$31.80+29.2%588
079$24.46-0.6%60,011
0814$24.45-0.7%17,337
091$15.00-39%9,856
103$25.10+2%9,397
113$22.44-8.8%4,624
128$23.98-2.6%63,109
135$28.96+17.7%2,250
141$49.28+100.2%346

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0536 1 1 (Guardrail -Roadway, General TL-3) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 76 contracts with a quantity-weighted average of $24.61 per LF, on 235,547 LF worth $5,797,979 in total.

The same report run for earlier periods shows $22.48 in 2024 (94 contracts, 582,724 LF), $23.96 in 2025 (94 contracts, 403,016 LF), $24.61 in the latest 12 months (76 contracts, 235,547 LF). From 2024 to the latest 12 months the weighted average rose 9.5%.

Quantity let statewide shrank 60% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 11 market areas with at least three contracts, market area 05 had the lowest weighted average ($21.57 per LF, 7 contracts) and market area 04 the highest ($33.65, 7 contracts), 1.6 times as much. Market area 08 let the most contracts with this item (14). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0536: 0536 73 Guardrail Removal ($1.23 per LF, 84 contracts); 0536 85 24 Guardrail END Treatment- Parallel Approach Terminal ($3,264.12 per EA, 76 contracts); 0536 85 20 Guardrail END Treatment- Trailing Anchorage ($1,643.44 per EA, 55 contracts); 0536 8122 Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91 per EA, 26 contracts); 0536 8112 Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-3 ($3,224.76 per EA, 23 contracts).

Related items in section 0536

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.