Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-3 (Item 0536 8112): FDOT Unit Price History
23 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $3,224.76/EA
- Contracts (12 mo)
- 23
- Total quantity (12 mo)
- 133 EA
- Total amount (12 mo)
- $428,893
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 23 | $3,380.06 | 147 | $496,869 |
| 2025 | 2025-01-01 – 2025-12-31 | 34 | $3,201.21 | 217 | $694,662 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 23 | $3,224.76 | 133 | $428,893 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 1 | $3,855.33 | +19.6% | 8 |
| 02 | 3 | $4,208.21 | +30.5% | 12 |
| 03 | 2 | $3,309.42 | +2.6% | 20 |
| 04 | 2 | $3,502.27 | +8.6% | 11 |
| 05 | 3 | $3,072.61 | -4.7% | 6 |
| 07 | 4 | $2,371.52 | -26.5% | 36 |
| 08 | 2 | $3,386.35 | +5% | 4 |
| 09 | 1 | $2,000.00 | -38% | 2 |
| 10 | 1 | $4,286.11 | +32.9% | 6 |
| 11 | 1 | $4,200.00 | +30.2% | 1 |
| 12 | 3 | $3,391.34 | +5.2% | 27 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0536 8112 (Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-3) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 23 contracts with a quantity-weighted average of $3,224.76 per EA, on 133 EA worth $428,893 in total.
The same report run for earlier periods shows $3,380.06 in 2024 (23 contracts, 147 EA), $3,201.21 in 2025 (34 contracts, 217 EA), $3,224.76 in the latest 12 months (23 contracts, 133 EA). From 2024 to the latest 12 months the weighted average fell 4.6%.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 07 had the lowest weighted average ($2,371.52 per EA, 4 contracts) and market area 02 the highest ($4,208.21, 3 contracts), 1.8 times as much. Market area 07 let the most contracts with this item (4). 11 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0536: 0536 73 Guardrail Removal ($1.23 per LF, 84 contracts); 0536 1 1 Guardrail -Roadway, General TL-3 ($24.61 per LF, 76 contracts); 0536 85 24 Guardrail END Treatment- Parallel Approach Terminal ($3,264.12 per EA, 76 contracts); 0536 85 20 Guardrail END Treatment- Trailing Anchorage ($1,643.44 per EA, 55 contracts); 0536 8122 Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91 per EA, 26 contracts).
Related items in section 0536
- 0536 73 · Guardrail Removal ($1.23/LF)
- 0536 1 1 · Guardrail -Roadway, General TL-3 ($24.61/LF)
- 0536 85 24 · Guardrail END Treatment- Parallel Approach Terminal ($3,264.12/EA)
- 0536 85 20 · Guardrail END Treatment- Trailing Anchorage ($1,643.44/EA)
- 0536 8122 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91/EA)
- 0536 8113 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Trailing ($1,546.11/EA)
- 0536 1 0 · Guardrail -Roadway, General/LOW Speed TL-2 ($20.79/LF)
- 0536 7 2 · Special Guardrail Post- Special Steel Post FOR Concrete Structure Mount ($250.49/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.