Guardrail Removal (Item 0536 73): FDOT Unit Price History

84 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$1.23/LF
Contracts (12 mo)
84
Total quantity (12 mo)
273,142 LF
Total amount (12 mo)
$335,934

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31105$1.68331,810$557,250
20252025-01-01 – 2025-12-3191$2.31394,905$911,121
Latest 12 months2025-11-01 – 2026-10-3184$1.23273,142$335,934

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
017$3.90+217.1%2,396
028$2.52+104.9%16,698
036$1.31+6.5%16,982
047$3.32+169.9%8,598
057$1.40+13.8%24,448
062$2.64+114.6%2,254
076$0.980-20.3%45,881
0815$2.33+89.4%11,119
092$0.100-91.9%9,129
104$2.78+126%7,172
112$1.37+11.4%4,218
129$0.720-41.5%121,031
138$2.62+113%2,832
141$2.81+128.5%384

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0536 73 (Guardrail Removal) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 84 contracts with a quantity-weighted average of $1.23 per LF, on 273,142 LF worth $335,934 in total.

The same report run for earlier periods shows $1.68 in 2024 (105 contracts, 331,810 LF), $2.31 in 2025 (91 contracts, 394,905 LF), $1.23 in the latest 12 months (84 contracts, 273,142 LF). From 2024 to the latest 12 months the weighted average fell 26.8%.

Quantity let statewide shrank 18% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 10 market areas with at least three contracts, market area 12 had the lowest weighted average ($0.720 per LF, 9 contracts) and market area 01 the highest ($3.90, 7 contracts), 5.4 times as much. Market area 08 let the most contracts with this item (15). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0536: 0536 1 1 Guardrail -Roadway, General TL-3 ($24.61 per LF, 76 contracts); 0536 85 24 Guardrail END Treatment- Parallel Approach Terminal ($3,264.12 per EA, 76 contracts); 0536 85 20 Guardrail END Treatment- Trailing Anchorage ($1,643.44 per EA, 55 contracts); 0536 8122 Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91 per EA, 26 contracts); 0536 8112 Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-3 ($3,224.76 per EA, 23 contracts).

Related items in section 0536