Remov STR (Pipe) (Item 496-7007): TxDOT Unit Price History

2,189 bids · 360 bid lines · Nov 6, 2024 to Nov 10, 2026 · unit of measure LF

TxDOT 496-7007 · REMOV STR (PIPE) · Unit: LF

Low bid
$20.00/LF
Quantity-weighted median of winning unit prices
Weighted median
$21.40/LF
Quantity-weighted median of every bid
Engineer’s estimate
$20.00/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-4.37%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$50.00$100.00$150.00$200.00$250.001101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 4.46 − 0.197·ln qty, R² 0.19)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 10, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 496-7007 (Remov STR (Pipe)) is measured in LF. Between Nov 6, 2024 and Nov 10, 2026, contractors entered 2,189 bids for it on 360 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,165 bids was $21.40 per LF, and the winning low bidders priced it at a weighted median of $20.00 per LF.

Winning unit prices sat close to TxDOT's own engineer's estimate ($20.00 per LF), within two percent.

By calendar year, the median bid moved from $26.98 in 2025 (1,049 bids) to $27.17 in 2026 (1,072 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $18.22 and $45.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 4.37%.

Quantity matters for this item. Lines of 2 to 143 LF had a weighted median of $33.10, while lines above 786 LF had $22.00, a 34% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 355 lines where both a winning and a second-place bid were published, the median winning unit price was $24.00 against $25.00 from the second-lowest bidder, a median gap of 1.19% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 21 TxDOT districts with at least ten bids, Wichita Falls had the lowest weighted median ($10.80) and Amarillo the highest ($50.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 10, 2026 in Ector County, where Scr Civil Construction, LLC was the low bidder at $150.00 per LF for 10 LF against an estimate of $80.00.

6 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 496-7004 Remov STR (SET) (weighted median $450.00 per EA); 500-7001 Mobilization (weighted median $128,675.16 per LS); 500-7002 Mobilization (Callout) (weighted median $100.00 per EA); 502-7001 Barricades, Signs AND Traffic Handling (weighted median $6,500.00 per MO).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20246811$34.80$29.50$31.45$20.00$50.00
20251,049181$26.14$22.00$26.98$17.50$50.00
20261,072168$26.92$23.06$27.17$18.22$45.00

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small2–143730$46.61$33.10$22.33–$59.87
Medium145–781732$32.85$25.00$18.00–$44.73
Large786–50,973727$25.71$22.00$12.97–$31.69

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$24.00
Median second-low unit price
$25.00
Median engineer’s estimate
$25.00
Median gap, second vs. low
+1.19%

355 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 6496-11-001 · let Nov 10, 2026 · Ector County, Odessa District

Line quantity 10 LF · Engineer’s estimate $80.00/LF

  • 1. Scr Civil Construction, LLC

    LOW BID · WINNER
    Unit price
    $150.00/LF
    Extension
    $1,500.00
    Proposal total
    $274,692
    Money left on the table
    $13,868 (5.05%)
    vs. engineer’s estimate
    +87.5%
  • Unit price
    $145.00/LF
    Extension
    $1,450.00
    Proposal total
    $288,560
    vs. low bid
    +$13,868
    vs. engineer’s estimate
    +81.3%
  • Unit price
    $241.00/LF
    Extension
    $2,410.00
    Proposal total
    $288,914
    vs. low bid
    +$14,222
    vs. engineer’s estimate
    +201.3%

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 1,650 LF · Engineer’s estimate $20.00/LF

  • Unit price
    $35.00/LF
    Extension
    $57,750.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    +75%
  • Unit price
    $40.00/LF
    Extension
    $66,000.00
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    +100%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $12.50/LF
    Extension
    $20,625.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    -37.5%
  • 4. Harper Brothers Construction LLC

    Unit price
    $19.50/LF
    Extension
    $32,175.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -2.5%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 2,933 LF · Engineer’s estimate $20.00/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $43.00/LF
    Extension
    $126,119.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    +115%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $20.75/LF
    Extension
    $60,859.75
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +3.8%
  • Unit price
    $56.00/LF
    Extension
    $164,248.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    +180%
  • Unit price
    $21.14/LF
    Extension
    $62,003.62
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    +5.7%
  • 5. Sema Construction, Inc.

    Unit price
    $26.10/LF
    Extension
    $76,551.30
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    +30.5%
  • 6. Zachry Construction Corporation

    Unit price
    $27.08/LF
    Extension
    $79,425.64
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    +35.4%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-106496-11-001EctorOdessa103Scr Civil Construction, LLC$150.00$80.00
2026-11-040047-04-032CollinDallas1,6504Mario Sinacola & Sons Excavating, Inc.$35.00$20.00
2026-11-040195-02-092DentonDallas2,9336Indus Road & Bridge, Inc.$43.00$20.00
2026-11-040212-03-058BrazosBryan42512Fluor Enterprises, Inc.$54.00$32.00
2026-11-040353-01-031WiseFort Worth377Xit Paving and Construction Inc.$40.00$49.00
2026-11-041017-03-040HuntParis2,9379Highway 19 Construction LLC$20.00$5.00
2026-11-041052-02-098NuecesCorpus Christi405J E Construction Services, LLC$26.00$20.00
2026-11-030015-13-432TravisAustin21,4496Austin Bridge & Road Services, LP$60.97$11.25
2026-11-033330-01-011McLennanWaco69The Levy Company, LLC$341.57$23.00
2026-10-136505-28-001AndersonTyler1727Icos Management, LLC$12.00$35.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene50$15.00$20.00$25.00-12%
Amarillo71$34.15$50.00$75.00+85.48%
Atlanta117$20.00$16.00$20.00+5%
Austin175$60.97$38.35$11.25-15%
Beaumont43$15.00$45.00$30.00-23.69%
Brownwood38$40.00$40.00$28.00—
Bryan138$20.00$35.00$22.40+1.3%
Childress3$65.00$65.00$35.00—
Corpus Christi48$20.00$17.00$25.00+47.73%
Dallas403$13.50$25.00$21.50-6.49%
El Paso8$28.00$29.00$29.00—
Fort Worth102$46.00$25.50$30.00+49.26%
Houston176$20.00$25.20$30.00-37.8%
Laredo46$43.40$28.67$14.00-16.72%
Lubbock5$45.15$40.50$50.00—
Lufkin14$26.00$31.20$18.00—
Odessa65$16.50$30.78$24.00-21.43%
Paris154$17.00$17.00$8.00-20%
Pharr130$10.00$13.10$20.00-18.18%
San Antonio142$27.00$26.59$20.05+6.28%
Tyler48$60.00$21.50$40.00-50.6%
Waco124$17.50$20.00$12.000%
Wichita Falls73$10.80$10.80$19.86+12.82%
Yoakum16$20.00$42.25$25.00—

Related items

Is your price for item 496-7007 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.