Barricades, Signs AND Traffic Handling (Item 502-7001): TxDOT Unit Price History
10,814 bids · 1,987 bid lines · Sep 6, 2024 to Nov 12, 2026 · unit of measure MO
TxDOT 502-7001 · BARRICADES, SIGNS AND TRAFFIC HANDLING · Unit: MO
- Low bid
- $5,000.00/MO
- Quantity-weighted median of winning unit prices
- Weighted median
- $6,500.00/MO
- Quantity-weighted median of every bid
- Engineer’s estimate
- $7,375.00/MO
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -19.48%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Sep 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 502-7001 (Barricades, Signs AND Traffic Handling) is measured in MO. Between Sep 6, 2024 and Nov 12, 2026, contractors entered 10,814 bids for it on 1,987 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 5,501 bids was $6,500.00 per MO, and the winning low bidders priced it at a weighted median of $5,000.00 per MO.
TxDOT's engineer's estimate for the same lines had a weighted median of $7,375.00 per MO, so winning bids came in 32.2% below the estimate.
By calendar year, the median bid moved from $6,100.00 in 2025 (5,195 bids) to $5,000.00 in 2026 (5,111 bids), down 18.0%. The middle half of 2026 bids fell between $2,700.00 and $12,000.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 19.48%.
Quantity matters for this item. Lines of 1 to 5 MO had a weighted median of $5,000.00, while lines above 11 MO had $8,400.00; larger lines were priced higher here, which is unusual and worth checking against the individual lettings.
Across 1,589 lines where both a winning and a second-place bid were published, the median winning unit price was $5,000.00 against $5,090.00 from the second-lowest bidder, a median gap of 16.58% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Pharr had the lowest weighted median ($3,500.00) and Lubbock the highest ($30,000.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Denton County, where Road Doctors LLC was the low bidder at $2,000.00 per MO for 4 MO against an estimate of $2,000.00.
1,005 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 503-7001 Portable Changeable Message Sign (weighted median $95.00 per DAY); 503-7002 Portable Changeable Message Sign (weighted median $9,010.00 per EA); 500-7001 Mobilization (weighted median $128,675.16 per LS); 500-7002 Mobilization (Callout) (weighted median $100.00 per EA).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 508 | 97 | $18,921.63 | $8,000.00 | $6,619.06 | $3,000.00 | $18,558.15 |
| 2025 | 5,195 | 986 | $16,685.03 | $8,000.00 | $6,100.00 | $3,000.00 | $15,000.00 |
| 2026 | 5,111 | 909 | $17,014.08 | $6,319.83 | $5,000.00 | $2,700.00 | $12,000.00 |
Quantity bands
| Band | Quantity (MO) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–5 | 3,908 | $11,588.58 | $5,000.00 | $2,500.00–$10,565.30 |
| Medium | 6–10 | 3,391 | $11,596.33 | $6,000.00 | $3,000.00–$12,500.00 |
| Large | 11–72 | 3,515 | $19,978.51 | $8,400.00 | $3,326.40–$16,500.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $5,000.00
- Median second-low unit price
- $5,090.00
- Median engineer’s estimate
- $7,500.00
- Median gap, second vs. low
- +16.58%
1,589 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6497-55-001 · let Nov 12, 2026 · Denton County, Dallas District
Line quantity 4 MO · Engineer’s estimate $2,000/MO
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Road Doctors LLCLOW BID | $2,000.00/MO | $8,000.00 | — | 0% | $493,320 | $73,900 (14.98%) left on table |
| 3 | Texas Road Construction, LLC | $1,000.00/MO | $4,000.00 | -$4,000 | -50% | $567,220 | +$73,900 |
| 6 | Jr West Texas Concrete LLC | $32,000.00/MO | $128,000.00 | +$120,000 | +1,500% | $746,209 | +$252,889 |
- LOW BID · WINNER
- Unit price
- $2,000.00/MO
- Extension
- $8,000.00
- Proposal total
- $493,320
- Money left on the table
- $73,900 (14.98%)
- vs. engineer’s estimate
- 0%
- Unit price
- $1,000.00/MO
- Extension
- $4,000.00
- Proposal total
- $567,220
- vs. low bid
- +$73,900
- vs. engineer’s estimate
- -50%
6. Jr West Texas Concrete LLC
- Unit price
- $32,000.00/MO
- Extension
- $128,000.00
- Proposal total
- $746,209
- vs. low bid
- +$252,889
- vs. engineer’s estimate
- +1,500%
Proposal 6504-77-001 · let Nov 12, 2026 · Dallas County, Dallas District
Line quantity 2 MO · Engineer’s estimate $15,000/MO
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Garret Shields InfrastructureLOW BID | $5,000.00/MO | $10,000.00 | — | -66.7% | $237,780 | $85,480 (35.95%) left on table |
| 4 | Gibson & Associates, Inc. | $33,000.00/MO | $66,000.00 | +$56,000 | +120% | $323,260 | +$85,480 |
| 6 | Road Doctors LLC | $5,000.00/MO | $10,000.00 | $0.000 | -66.7% | $361,650 | +$123,870 |
1. Garret Shields Infrastructure
LOW BID · WINNER- Unit price
- $5,000.00/MO
- Extension
- $10,000.00
- Proposal total
- $237,780
- Money left on the table
- $85,480 (35.95%)
- vs. engineer’s estimate
- -66.7%
- Unit price
- $33,000.00/MO
- Extension
- $66,000.00
- Proposal total
- $323,260
- vs. low bid
- +$85,480
- vs. engineer’s estimate
- +120%
- Unit price
- $5,000.00/MO
- Extension
- $10,000.00
- Proposal total
- $361,650
- vs. low bid
- +$123,870
- vs. engineer’s estimate
- -66.7%
Proposal 6496-11-001 · let Nov 10, 2026 · Ector County, Odessa District
Line quantity 2 MO · Engineer’s estimate $25,000/MO
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Scr Civil Construction, LLCLOW BID | $7,400.00/MO | $14,800.00 | — | -70.4% | $274,692 | $13,868 (5.05%) left on table |
| 2 | Rb Contracting, LLC | $10,000.00/MO | $20,000.00 | +$5,200 | -60% | $288,560 | +$13,868 |
| 3 | Scott Tucker Construction Company, LLC | $15,303.00/MO | $30,606.00 | +$15,806 | -38.8% | $288,914 | +$14,222 |
1. Scr Civil Construction, LLC
LOW BID · WINNER- Unit price
- $7,400.00/MO
- Extension
- $14,800.00
- Proposal total
- $274,692
- Money left on the table
- $13,868 (5.05%)
- vs. engineer’s estimate
- -70.4%
- Unit price
- $10,000.00/MO
- Extension
- $20,000.00
- Proposal total
- $288,560
- vs. low bid
- +$13,868
- vs. engineer’s estimate
- -60%
- Unit price
- $15,303.00/MO
- Extension
- $30,606.00
- Proposal total
- $288,914
- vs. low bid
- +$14,222
- vs. engineer’s estimate
- -38.8%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6497-55-001 | Denton | Dallas | 4 | 3 | Road Doctors LLC | $2,000.00 | $2,000.00 |
| 2026-11-12 | 6504-77-001 | Dallas | Dallas | 2 | 3 | Garret Shields Infrastructure | $5,000.00 | $15,000.00 |
| 2026-11-10 | 6496-11-001 | Ector | Odessa | 2 | 3 | Scr Civil Construction, LLC | $7,400.00 | $25,000.00 |
| 2026-11-04 | 0009-06-056 | Hunt | Paris | 6 | 2 | Cdm Holdings | $50,100.00 | $100,000.00 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 7 | 6 | Bobcat Services, Inc. | $3,145.80 | $12,500.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 32 | 4 | Mario Sinacola & Sons Excavating, Inc. | $27,500.00 | $30,000.00 |
| 2026-11-04 | 0052-04-054 | Lamb | Lubbock | 5 | 3 | Lipham Asphalt and Paving Company, LLC | $25,000.00 | $20,000.00 |
| 2026-11-04 | 0074-06-256 | Nueces | Corpus Christi | 4 | 4 | Relmco, Inc. | $6,500.00 | $10,000.00 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 5 | 9 | Lone Star Paving Company | $3,000.00 | $15,000.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 41 | 6 | Indus Road & Bridge, Inc. | $30,000.00 | $30,000.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 298 | $6,800.00 | $10,000.00 | $15,000.00 | -17.13% |
| Amarillo | 164 | $10,000.00 | $18,434.00 | $20,000.00 | -26.18% |
| Atlanta | 225 | $3,000.00 | $5,000.00 | $5,000.00 | 0% |
| Austin | 803 | $3,650.00 | $4,640.00 | $7,375.00 | -21.24% |
| Beaumont | 383 | $3,000.00 | $5,000.00 | $5,000.00 | -20% |
| Brownwood | 218 | $4,500.00 | $6,150.00 | $6,500.00 | +26% |
| Bryan | 479 | $3,900.00 | $5,000.00 | $5,000.00 | 0% |
| Childress | 180 | $6,000.00 | $11,500.00 | $3,500.00 | +11.81% |
| Corpus Christi | 432 | $4,000.00 | $4,500.00 | $5,000.00 | -30.88% |
| Dallas | 1,400 | $6,000.00 | $15,100.00 | $15,000.00 | -14.73% |
| El Paso | 140 | $14,250.00 | $15,000.00 | $11,500.00 | -4.22% |
| Fort Worth | 676 | $10,000.00 | $14,275.00 | $12,000.00 | -23.06% |
| Houston | 983 | $4,026.16 | $5,390.92 | $8,000.00 | -8.33% |
| Laredo | 190 | $3,950.00 | $5,000.00 | $5,000.00 | -20.41% |
| Lubbock | 197 | $15,000.00 | $30,000.00 | $20,000.00 | +14.17% |
| Lufkin | 272 | $2,400.00 | $4,400.00 | $3,500.00 | -14% |
| Odessa | 330 | $15,000.00 | $13,228.83 | $15,000.00 | -33.33% |
| Paris | 493 | $5,000.00 | $5,000.00 | $6,200.00 | -16.67% |
| Pharr | 360 | $2,000.00 | $3,500.00 | $5,000.00 | -22.22% |
| San Angelo | 170 | $4,500.00 | $5,000.00 | $10,000.00 | -13.04% |
| San Antonio | 712 | $5,100.00 | $7,460.85 | $10,000.00 | 0% |
| Tyler | 437 | $5,500.00 | $6,000.00 | $7,000.00 | -12.07% |
| Waco | 364 | $3,500.00 | $4,300.00 | $6,000.00 | -10% |
| Wichita Falls | 257 | $4,000.00 | $7,500.00 | $8,000.00 | -32.5% |
| Yoakum | 651 | $4,183.57 | $4,500.00 | $3,500.00 | +17.22% |
Related items
- 503-7001 · Portable Changeable Message Sign ($95.00/DAY)
- 503-7002 · Portable Changeable Message Sign ($9,010.00/EA)
- 500-7001 · Mobilization ($128,675.16/LS)
- 500-7002 · Mobilization (Callout) ($100.00/EA)
- 505-7001 · TMA (Stationary) ($236.87/DAY)
- 505-7003 · TMA (Mobile Operation) ($200.00/DAY)
- 505-7002 · TMA (Mobile Operation) ($80.00/HR)
- 506-7041 · Temp Sedmt Cont Fence (Remove) ($1.00/LF)
Is your price for item 502-7001 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.