Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

TMA (Stationary) (Item 505-7001): TxDOT Unit Price History

10,532 bids · 2,290 bid lines · Nov 6, 2024 to Nov 19, 2026 · unit of measure DAY

TxDOT 505-7001 · TMA (STATIONARY) · Unit: DAY

Low bid
$220.00/DAY
Quantity-weighted median of winning unit prices
Weighted median
$236.87/DAY
Quantity-weighted median of every bid
Engineer’s estimate
$220.00/DAY
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-4.94%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$500.00$1,000.00$1,500.00$2,000.001101001K10KQuantity (DAY), log scaleUnit price ($/DAY)
Winning (low) bid Other bid Fitted price curve (ln price = 6.05 − 0.155·ln qty, R² 0.03)320 plotted bids, 7 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 19, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 505-7001 (TMA (Stationary)) is measured in DAY. Between Nov 6, 2024 and Nov 19, 2026, contractors entered 10,532 bids for it on 2,290 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 5,494 bids was $236.87 per DAY, and the winning low bidders priced it at a weighted median of $220.00 per DAY.

Winning unit prices sat close to TxDOT's own engineer's estimate ($220.00 per DAY), within two percent.

By calendar year, the median bid moved from $260.00 in 2025 (4,979 bids) to $250.00 in 2026 (5,088 bids), down 3.8%. The middle half of 2026 bids fell between $170.00 and $350.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 4.94%.

Quantity matters for this item. Lines of 1 to 50 DAY had a weighted median of $300.00, while lines above 137 DAY had $245.00, a 18% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 1,506 lines where both a winning and a second-place bid were published, the median winning unit price was $250.00 against $260.00 from the second-lowest bidder, a median gap of 10% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Pharr had the lowest weighted median ($88.63) and El Paso the highest ($300.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 19, 2026 in Lamar County, where Austin Barricade Company, L.L.C. was the low bidder at $2,500.00 per DAY for 36 DAY against an estimate of $250.00.

2,111 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 505-7003 TMA (Mobile Operation) (weighted median $200.00 per DAY); 505-7002 TMA (Mobile Operation) (weighted median $80.00 per HR); 506-7041 Temp Sedmt Cont Fence (Remove) (weighted median $1.00 per LF); 506-7039 Temp Sedmt Cont Fence (Install) (weighted median $3.94 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
202446599$321.88$270.00$294.12$200.00$427.73
20254,9791,117$310.94$250.00$260.00$184.25$400.00
20265,0881,081$289.10$240.00$250.00$170.00$350.00

Quantity bands

BandQuantity (DAY)BidsWeighted avgWeighted median25th–75th pct
Small1–503,672$454.75$300.00$200.00–$480.38
Medium51–1363,355$353.19$254.58$180.00–$363.25
Large137–4,2003,505$277.41$245.00$150.00–$325.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$250.00
Median second-low unit price
$260.00
Median engineer’s estimate
$250.00
Median gap, second vs. low
+10%

1,506 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 6510-75-001 · let Nov 19, 2026 · Ector County, Odessa District

Line quantity 150 DAY · Engineer’s estimate $200.00/DAY

  • 1. Relmco, Inc.

    LOW BID · WINNER
    Unit price
    $150.00/DAY
    Extension
    $22,500.00
    Proposal total
    $669,750
    Money left on the table
    $33,975 (5.07%)
    vs. engineer’s estimate
    -25%
  • Unit price
    $225.00/DAY
    Extension
    $33,750.00
    Proposal total
    $703,725
    vs. low bid
    +$33,975
    vs. engineer’s estimate
    +12.5%
  • Unit price
    $343.00/DAY
    Extension
    $51,450.00
    Proposal total
    $912,950
    vs. low bid
    +$243,200
    vs. engineer’s estimate
    +71.5%

Proposal 6508-25-001 · let Nov 17, 2026 · Jefferson County, Beaumont District

Line quantity 125 DAY · Engineer’s estimate $750.00/DAY

  • 1. Ace Contractors, Inc.

    LOW BID · WINNER
    Unit price
    $200.00/DAY
    Extension
    $25,000.00
    Proposal total
    $360,270
    Money left on the table
    $28,480 (7.91%)
    vs. engineer’s estimate
    -73.3%
  • 2. Row Contractors LLC

    Unit price
    $500.00/DAY
    Extension
    $62,500.00
    Proposal total
    $388,750
    vs. low bid
    +$28,480
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $200.00/DAY
    Extension
    $25,000.00
    Proposal total
    $490,500
    vs. low bid
    +$130,230
    vs. engineer’s estimate
    -73.3%
  • Unit price
    $1,000.00/DAY
    Extension
    $125,000.00
    Proposal total
    $525,540
    vs. low bid
    +$165,270
    vs. engineer’s estimate
    +33.3%
  • Unit price
    $225.00/DAY
    Extension
    $28,125.00
    Proposal total
    $548,425
    vs. low bid
    +$188,155
    vs. engineer’s estimate
    -70%
  • 6. Western Certified Arborists

    Unit price
    $750.00/DAY
    Extension
    $93,750.00
    Proposal total
    $573,750
    vs. low bid
    +$213,480
    vs. engineer’s estimate
    0%
  • Unit price
    $1,586.00/DAY
    Extension
    $198,250.00
    Proposal total
    $812,510
    vs. low bid
    +$452,240
    vs. engineer’s estimate
    +111.5%

Proposal 6508-77-001 · let Nov 17, 2026 · Liberty County, Beaumont District

Line quantity 100 DAY · Engineer’s estimate $750.00/DAY

  • 1. L & M Mowing Contractors, LLC

    LOW BID · WINNER
    Unit price
    $750.00/DAY
    Extension
    $75,000.00
    Proposal total
    $191,770
    Money left on the table
    $20,285 (10.58%)
    vs. engineer’s estimate
    0%
  • Unit price
    $200.00/DAY
    Extension
    $20,000.00
    Proposal total
    $212,055
    vs. low bid
    +$20,285
    vs. engineer’s estimate
    -73.3%
  • 3. Row Contractors LLC

    Unit price
    $500.00/DAY
    Extension
    $50,000.00
    Proposal total
    $220,320
    vs. low bid
    +$28,550
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $225.00/DAY
    Extension
    $22,500.00
    Proposal total
    $282,750
    vs. low bid
    +$90,980
    vs. engineer’s estimate
    -70%
  • Unit price
    $100.00/DAY
    Extension
    $10,000.00
    Proposal total
    $286,250
    vs. low bid
    +$94,480
    vs. engineer’s estimate
    -86.7%
  • Unit price
    $1,000.00/DAY
    Extension
    $100,000.00
    Proposal total
    $313,020
    vs. low bid
    +$121,250
    vs. engineer’s estimate
    +33.3%
  • Unit price
    $200.00/DAY
    Extension
    $20,000.00
    Proposal total
    $322,500
    vs. low bid
    +$130,730
    vs. engineer’s estimate
    -73.3%
  • 8. Western Certified Arborists

    Unit price
    $750.00/DAY
    Extension
    $75,000.00
    Proposal total
    $497,500
    vs. low bid
    +$305,730
    vs. engineer’s estimate
    0%
  • Unit price
    $1,586.00/DAY
    Extension
    $158,600.00
    Proposal total
    $689,930
    vs. low bid
    +$498,160
    vs. engineer’s estimate
    +111.5%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-196510-23-001LamarParis362Austin Barricade Company, L.L.C.$2,500.00$250.00
2026-11-196510-75-001EctorOdessa1503Relmco, Inc.$150.00$200.00
2026-11-176508-25-001JeffersonBeaumont1257Ace Contractors, Inc.$200.00$750.00
2026-11-176508-77-001LibertyBeaumont1009L & M Mowing Contractors, LLC$750.00$750.00
2026-11-176508-79-001JasperBeaumont1008Ace Contractors, Inc.$200.00$750.00
2026-11-126504-61-001PotterAmarillo1555Ti-Zack Concrete, LLC$129.25$200.00
2026-11-126497-55-001DentonDallas673Road Doctors LLC$150.00$100.00
2026-11-126504-57-001DallasDallas445Highway Intelligent Traffic Solutions, LLC$200.80$225.00
2026-11-126504-77-001DallasDallas644Garret Shields Infrastructure$300.00$250.00
2026-11-106508-49-001WheelerChildress243Boen Landscaping & Irrigation, LLC$200.00$500.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene264$275.00$250.00$300.00-6.13%
Amarillo189$250.00$275.00$200.00-15.38%
Atlanta296$200.00$241.25$155.00+1.6%
Austin709$212.44$225.00$200.000%
Beaumont421$300.00$300.00$355.00+6.17%
Brownwood193$150.00$287.00$200.00+20%
Bryan569$300.00$250.00$250.00-10.59%
Childress147$200.00$275.00$200.00-34.03%
Corpus Christi293$100.00$185.00$139.00-16.09%
Dallas1,354$200.00$230.00$210.000%
El Paso196$285.00$300.00$280.00+8.3%
Fort Worth611$220.00$215.09$225.00-1.96%
Houston1,085$250.00$250.00$250.000%
Laredo145$275.00$178.48$220.00-21.57%
Lubbock204$220.00$250.00$250.00-1.79%
Lufkin447$225.00$250.00$150.00-12.92%
Odessa331$195.00$220.00$200.000%
Paris489$250.00$250.00$250.00-10%
Pharr253$50.00$88.63$130.00-6.83%
San Angelo162$188.13$262.00$225.00-22.46%
San Antonio610$150.00$212.30$200.00-7.51%
Tyler485$340.00$245.00$200.00+6.24%
Waco361$270.00$278.00$285.000%
Wichita Falls212$200.00$260.00$250.00+3.96%
Yoakum490$250.00$250.00$250.00-8.33%

Related items

Is your price for item 505-7001 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.