TMA (Mobile Operation) (Item 505-7002): TxDOT Unit Price History

1,401 bids · 325 bid lines · Nov 6, 2024 to Nov 17, 2026 · unit of measure HR

TxDOT 505-7002 · TMA (MOBILE OPERATION) · Unit: HR

Low bid
$65.00/HR
Quantity-weighted median of winning unit prices
Weighted median
$80.00/HR
Quantity-weighted median of every bid
Engineer’s estimate
$85.00/HR
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
+9.2%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$100.00$200.00$300.00$400.00$500.001101001K10K100KQuantity (HR), log scaleUnit price ($/HR)
Winning (low) bid Other bid Fitted price curve (ln price = 4.67 − 0.045·ln qty, R² 0.01)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 17, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 505-7002 (TMA (Mobile Operation)) is measured in HR. Between Nov 6, 2024 and Nov 17, 2026, contractors entered 1,401 bids for it on 325 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 680 bids was $80.00 per HR, and the winning low bidders priced it at a weighted median of $65.00 per HR.

TxDOT's engineer's estimate for the same lines had a weighted median of $85.00 per HR, so winning bids came in 23.5% below the estimate.

By calendar year, the median bid moved from $89.00 in 2025 (719 bids) to $94.28 in 2026 (606 bids), up 5.9%. The middle half of 2026 bids fell between $60.00 and $149.25.

Comparing the last 12 months with the 12 months before, the median unit price rose 9.2%.

Quantity matters for this item. Lines of 2 to 48 HR had a weighted median of $100.00, while lines above 184 HR had $80.00, a 20% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 245 lines where both a winning and a second-place bid were published, the median winning unit price was $82.30 against $90.00 from the second-lowest bidder, a median gap of 10.71% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 18 TxDOT districts with at least ten bids, Austin had the lowest weighted median ($40.00) and Odessa the highest ($200.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $58.75 per HR for 30 HR against an estimate of $125.00.

197 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 505-7001 TMA (Stationary) (weighted median $236.87 per DAY); 505-7003 TMA (Mobile Operation) (weighted median $200.00 per DAY); 506-7041 Temp Sedmt Cont Fence (Remove) (weighted median $1.00 per LF); 506-7039 Temp Sedmt Cont Fence (Install) (weighted median $3.94 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20247624$88.10$70.00$100.00$69.50$111.48
2025719172$87.94$78.00$89.00$55.00$144.95
2026606131$91.67$84.56$94.28$60.00$149.25

Quantity bands

BandQuantity (HR)BidsWeighted avgWeighted median25th–75th pct
Small2–48489$163.54$100.00$65.00–$200.00
Medium50–180460$121.94$87.00$59.55–$119.00
Large184–25,000452$86.56$80.00$51.47–$106.46

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$82.30
Median second-low unit price
$90.00
Median engineer’s estimate
$90.00
Median gap, second vs. low
+10.71%

245 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District

Line quantity 30 HR · Engineer’s estimate $125.00/HR

  • 1. Ti-Zack Concrete, LLC

    LOW BID · WINNER
    Unit price
    $58.75/HR
    Extension
    $1,762.50
    Proposal total
    $734,629
    Money left on the table
    $59,414 (8.09%)
    vs. engineer’s estimate
    -53%
  • Unit price
    $100.00/HR
    Extension
    $3,000.00
    Proposal total
    $794,043
    vs. low bid
    +$59,414
    vs. engineer’s estimate
    -20%
  • Unit price
    $195.00/HR
    Extension
    $5,850.00
    Proposal total
    $852,064
    vs. low bid
    +$117,434
    vs. engineer’s estimate
    +56%
  • Unit price
    $30.00/HR
    Extension
    $900.00
    Proposal total
    $916,535
    vs. low bid
    +$181,906
    vs. engineer’s estimate
    -76%
  • Unit price
    $189.00/HR
    Extension
    $5,670.00
    Proposal total
    $974,652
    vs. low bid
    +$240,023
    vs. engineer’s estimate
    +51.2%
  • Unit price
    $150.00/HR
    Extension
    $4,500.00
    Proposal total
    $981,238
    vs. low bid
    +$246,609
    vs. engineer’s estimate
    +20%

Proposal 6510-79-001 · let Nov 5, 2026 · Lamb County, Lubbock District

Line quantity 750 HR · Engineer’s estimate $180.00/HR

  • 1. Fc Traffic Control, LLC

    LOW BID · WINNER
    Unit price
    $150.00/HR
    Extension
    $112,500.00
    Proposal total
    $331,625
    Money left on the table
    $49,625 (14.96%)
    vs. engineer’s estimate
    -16.7%
  • 2. Awp Safety

    Unit price
    $125.00/HR
    Extension
    $93,750.00
    Proposal total
    $381,250
    vs. low bid
    +$49,625
    vs. engineer’s estimate
    -30.6%
  • Unit price
    $300.00/HR
    Extension
    $225,000.00
    Proposal total
    $450,500
    vs. low bid
    +$118,875
    vs. engineer’s estimate
    +66.7%

Proposal 6510-80-001 · let Nov 5, 2026 · Hale County, Lubbock District

Line quantity 400 HR · Engineer’s estimate $175.00/HR

  • 1. Fc Traffic Control, LLC

    LOW BID · WINNER
    Unit price
    $140.00/HR
    Extension
    $56,000.00
    Proposal total
    $182,004
    Money left on the table
    $144,211 (79.24%)
    vs. engineer’s estimate
    -20%
  • Unit price
    $200.00/HR
    Extension
    $80,000.00
    Proposal total
    $326,215
    vs. low bid
    +$144,211
    vs. engineer’s estimate
    +14.3%
  • 3. Awp Safety

    Unit price
    $150.00/HR
    Extension
    $60,000.00
    Proposal total
    $375,325
    vs. low bid
    +$193,321
    vs. engineer’s estimate
    -14.3%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-126504-61-001PotterAmarillo306Ti-Zack Concrete, LLC$58.75$125.00
2026-11-056510-79-001LambLubbock7503Fc Traffic Control, LLC$150.00$180.00
2026-11-056510-80-001HaleLubbock4003Fc Traffic Control, LLC$140.00$175.00
2026-11-040016-03-125HaysAustin1446Bobcat Services, Inc.$105.24$150.00
2026-11-040047-04-032CollinDallas2764Mario Sinacola & Sons Excavating, Inc.$200.00$80.00
2026-11-041017-03-040HuntParis1607Highway 19 Construction LLC$50.00$200.00
2026-11-046506-48-001CoryellWaco7502Awp Safety$80.00$78.08
2026-11-046509-56-001HillWaco6,0003Awp Safety$80.00$78.08
2026-11-046509-96-001HendersonTyler1004Highway 19 Construction LLC$70.00$75.00
2026-11-046510-36-001HillWaco603Big Creek Construction, Ltd.$90.00$128.65

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene8$60.00$70.00$79.00—
Amarillo133$87.00$95.00$100.00-5%
Atlanta18$30.00$50.00$50.00—
Austin159$237.52$40.00$75.000%
Beaumont4—$95.00——
Bryan39$77.50$80.00$100.00+33.33%
Childress19$50.00$60.00$45.00—
Corpus Christi36$40.82$56.00$20.00-31.6%
Dallas236$75.00$85.00$70.00+15.83%
El Paso18$65.00$65.00$90.00—
Fort Worth28$62.00$81.00$200.00—
Houston141$56.00$62.00$43.21+6.67%
Laredo39$55.00$85.00$62.50-11.12%
Lubbock26$65.00$100.00$100.00-19.35%
Lufkin15$60.00$90.00$85.00—
Odessa32$200.00$200.00$100.00+21.3%
Paris139$90.00$95.00$112.000%
Pharr6$7.00$60.11$30.00—
San Angelo2$50.00$97.50$91.50—
San Antonio71$85.00$90.00$90.00-5%
Tyler31$73.50$85.00$70.00+70%
Waco183$80.00$84.56$78.08+19.93%
Wichita Falls1$145.00$145.00$150.00—
Yoakum3$65.00$100.00$85.00—

Related items

Is your price for item 505-7002 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.