TMA (Mobile Operation) (Item 505-7002): TxDOT Unit Price History
1,401 bids · 325 bid lines · Nov 6, 2024 to Nov 17, 2026 · unit of measure HR
TxDOT 505-7002 · TMA (MOBILE OPERATION) · Unit: HR
- Low bid
- $65.00/HR
- Quantity-weighted median of winning unit prices
- Weighted median
- $80.00/HR
- Quantity-weighted median of every bid
- Engineer’s estimate
- $85.00/HR
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- +9.2%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 17, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 505-7002 (TMA (Mobile Operation)) is measured in HR. Between Nov 6, 2024 and Nov 17, 2026, contractors entered 1,401 bids for it on 325 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 680 bids was $80.00 per HR, and the winning low bidders priced it at a weighted median of $65.00 per HR.
TxDOT's engineer's estimate for the same lines had a weighted median of $85.00 per HR, so winning bids came in 23.5% below the estimate.
By calendar year, the median bid moved from $89.00 in 2025 (719 bids) to $94.28 in 2026 (606 bids), up 5.9%. The middle half of 2026 bids fell between $60.00 and $149.25.
Comparing the last 12 months with the 12 months before, the median unit price rose 9.2%.
Quantity matters for this item. Lines of 2 to 48 HR had a weighted median of $100.00, while lines above 184 HR had $80.00, a 20% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 245 lines where both a winning and a second-place bid were published, the median winning unit price was $82.30 against $90.00 from the second-lowest bidder, a median gap of 10.71% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 18 TxDOT districts with at least ten bids, Austin had the lowest weighted median ($40.00) and Odessa the highest ($200.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $58.75 per HR for 30 HR against an estimate of $125.00.
197 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 505-7001 TMA (Stationary) (weighted median $236.87 per DAY); 505-7003 TMA (Mobile Operation) (weighted median $200.00 per DAY); 506-7041 Temp Sedmt Cont Fence (Remove) (weighted median $1.00 per LF); 506-7039 Temp Sedmt Cont Fence (Install) (weighted median $3.94 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 76 | 24 | $88.10 | $70.00 | $100.00 | $69.50 | $111.48 |
| 2025 | 719 | 172 | $87.94 | $78.00 | $89.00 | $55.00 | $144.95 |
| 2026 | 606 | 131 | $91.67 | $84.56 | $94.28 | $60.00 | $149.25 |
Quantity bands
| Band | Quantity (HR) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 2–48 | 489 | $163.54 | $100.00 | $65.00–$200.00 |
| Medium | 50–180 | 460 | $121.94 | $87.00 | $59.55–$119.00 |
| Large | 184–25,000 | 452 | $86.56 | $80.00 | $51.47–$106.46 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $82.30
- Median second-low unit price
- $90.00
- Median engineer’s estimate
- $90.00
- Median gap, second vs. low
- +10.71%
245 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District
Line quantity 30 HR · Engineer’s estimate $125.00/HR
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLCLOW BID | $58.75/HR | $1,762.50 | — | -53% | $734,629 | $59,414 (8.09%) left on table |
| 2 | Cross Plus Construction, LLC | $100.00/HR | $3,000.00 | +$1,238 | -20% | $794,043 | +$59,414 |
| 3 | Structural Integrity Group LLC | $195.00/HR | $5,850.00 | +$4,088 | +56% | $852,064 | +$117,434 |
| 5 | Scr Civil Construction, LLC | $30.00/HR | $900.00 | -$862.50 | -76% | $916,535 | +$181,906 |
| 6 | Icos Management, LLC | $189.00/HR | $5,670.00 | +$3,908 | +51.2% | $974,652 | +$240,023 |
| 7 | Road Doctors LLC | $150.00/HR | $4,500.00 | +$2,738 | +20% | $981,238 | +$246,609 |
- LOW BID · WINNER
- Unit price
- $58.75/HR
- Extension
- $1,762.50
- Proposal total
- $734,629
- Money left on the table
- $59,414 (8.09%)
- vs. engineer’s estimate
- -53%
- Unit price
- $100.00/HR
- Extension
- $3,000.00
- Proposal total
- $794,043
- vs. low bid
- +$59,414
- vs. engineer’s estimate
- -20%
- Unit price
- $195.00/HR
- Extension
- $5,850.00
- Proposal total
- $852,064
- vs. low bid
- +$117,434
- vs. engineer’s estimate
- +56%
- Unit price
- $30.00/HR
- Extension
- $900.00
- Proposal total
- $916,535
- vs. low bid
- +$181,906
- vs. engineer’s estimate
- -76%
- Unit price
- $189.00/HR
- Extension
- $5,670.00
- Proposal total
- $974,652
- vs. low bid
- +$240,023
- vs. engineer’s estimate
- +51.2%
- Unit price
- $150.00/HR
- Extension
- $4,500.00
- Proposal total
- $981,238
- vs. low bid
- +$246,609
- vs. engineer’s estimate
- +20%
Proposal 6510-79-001 · let Nov 5, 2026 · Lamb County, Lubbock District
Line quantity 750 HR · Engineer’s estimate $180.00/HR
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fc Traffic Control, LLCLOW BID | $150.00/HR | $112,500.00 | — | -16.7% | $331,625 | $49,625 (14.96%) left on table |
| 2 | Awp Safety | $125.00/HR | $93,750.00 | -$18,750 | -30.6% | $381,250 | +$49,625 |
| 3 | Austin Barricade Company, L.L.C. | $300.00/HR | $225,000.00 | +$112,500 | +66.7% | $450,500 | +$118,875 |
- LOW BID · WINNER
- Unit price
- $150.00/HR
- Extension
- $112,500.00
- Proposal total
- $331,625
- Money left on the table
- $49,625 (14.96%)
- vs. engineer’s estimate
- -16.7%
2. Awp Safety
- Unit price
- $125.00/HR
- Extension
- $93,750.00
- Proposal total
- $381,250
- vs. low bid
- +$49,625
- vs. engineer’s estimate
- -30.6%
- Unit price
- $300.00/HR
- Extension
- $225,000.00
- Proposal total
- $450,500
- vs. low bid
- +$118,875
- vs. engineer’s estimate
- +66.7%
Proposal 6510-80-001 · let Nov 5, 2026 · Hale County, Lubbock District
Line quantity 400 HR · Engineer’s estimate $175.00/HR
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fc Traffic Control, LLCLOW BID | $140.00/HR | $56,000.00 | — | -20% | $182,004 | $144,211 (79.24%) left on table |
| 2 | Austin Barricade Company, L.L.C. | $200.00/HR | $80,000.00 | +$24,000 | +14.3% | $326,215 | +$144,211 |
| 3 | Awp Safety | $150.00/HR | $60,000.00 | +$4,000 | -14.3% | $375,325 | +$193,321 |
- LOW BID · WINNER
- Unit price
- $140.00/HR
- Extension
- $56,000.00
- Proposal total
- $182,004
- Money left on the table
- $144,211 (79.24%)
- vs. engineer’s estimate
- -20%
- Unit price
- $200.00/HR
- Extension
- $80,000.00
- Proposal total
- $326,215
- vs. low bid
- +$144,211
- vs. engineer’s estimate
- +14.3%
3. Awp Safety
- Unit price
- $150.00/HR
- Extension
- $60,000.00
- Proposal total
- $375,325
- vs. low bid
- +$193,321
- vs. engineer’s estimate
- -14.3%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 30 | 6 | Ti-Zack Concrete, LLC | $58.75 | $125.00 |
| 2026-11-05 | 6510-79-001 | Lamb | Lubbock | 750 | 3 | Fc Traffic Control, LLC | $150.00 | $180.00 |
| 2026-11-05 | 6510-80-001 | Hale | Lubbock | 400 | 3 | Fc Traffic Control, LLC | $140.00 | $175.00 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 144 | 6 | Bobcat Services, Inc. | $105.24 | $150.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 276 | 4 | Mario Sinacola & Sons Excavating, Inc. | $200.00 | $80.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 160 | 7 | Highway 19 Construction LLC | $50.00 | $200.00 |
| 2026-11-04 | 6506-48-001 | Coryell | Waco | 750 | 2 | Awp Safety | $80.00 | $78.08 |
| 2026-11-04 | 6509-56-001 | Hill | Waco | 6,000 | 3 | Awp Safety | $80.00 | $78.08 |
| 2026-11-04 | 6509-96-001 | Henderson | Tyler | 100 | 4 | Highway 19 Construction LLC | $70.00 | $75.00 |
| 2026-11-04 | 6510-36-001 | Hill | Waco | 60 | 3 | Big Creek Construction, Ltd. | $90.00 | $128.65 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 8 | $60.00 | $70.00 | $79.00 | — |
| Amarillo | 133 | $87.00 | $95.00 | $100.00 | -5% |
| Atlanta | 18 | $30.00 | $50.00 | $50.00 | — |
| Austin | 159 | $237.52 | $40.00 | $75.00 | 0% |
| Beaumont | 4 | — | $95.00 | — | — |
| Bryan | 39 | $77.50 | $80.00 | $100.00 | +33.33% |
| Childress | 19 | $50.00 | $60.00 | $45.00 | — |
| Corpus Christi | 36 | $40.82 | $56.00 | $20.00 | -31.6% |
| Dallas | 236 | $75.00 | $85.00 | $70.00 | +15.83% |
| El Paso | 18 | $65.00 | $65.00 | $90.00 | — |
| Fort Worth | 28 | $62.00 | $81.00 | $200.00 | — |
| Houston | 141 | $56.00 | $62.00 | $43.21 | +6.67% |
| Laredo | 39 | $55.00 | $85.00 | $62.50 | -11.12% |
| Lubbock | 26 | $65.00 | $100.00 | $100.00 | -19.35% |
| Lufkin | 15 | $60.00 | $90.00 | $85.00 | — |
| Odessa | 32 | $200.00 | $200.00 | $100.00 | +21.3% |
| Paris | 139 | $90.00 | $95.00 | $112.00 | 0% |
| Pharr | 6 | $7.00 | $60.11 | $30.00 | — |
| San Angelo | 2 | $50.00 | $97.50 | $91.50 | — |
| San Antonio | 71 | $85.00 | $90.00 | $90.00 | -5% |
| Tyler | 31 | $73.50 | $85.00 | $70.00 | +70% |
| Waco | 183 | $80.00 | $84.56 | $78.08 | +19.93% |
| Wichita Falls | 1 | $145.00 | $145.00 | $150.00 | — |
| Yoakum | 3 | $65.00 | $100.00 | $85.00 | — |
Related items
- 505-7001 · TMA (Stationary) ($236.87/DAY)
- 505-7003 · TMA (Mobile Operation) ($200.00/DAY)
- 506-7041 · Temp Sedmt Cont Fence (Remove) ($1.00/LF)
- 506-7039 · Temp Sedmt Cont Fence (Install) ($3.94/LF)
- 506-7046 · Biodeg Erosn Cont Logs (Remove) ($1.00/LF)
- 506-7011 · Rock Filter Dams (Remove) ($12.00/LF)
- 506-7044 · Biodeg Erosn Cont Logs (Instl) (12") ($5.65/LF)
- 506-7024 · Construction Exits (Remove) ($10.00/SY)
Is your price for item 505-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.