Portable Changeable Message Sign (Item 503-7002): TxDOT Unit Price History
4,323 bids · 772 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure EA
TxDOT 503-7002 · PORTABLE CHANGEABLE MESSAGE SIGN · Unit: EA
- Low bid
- $6,500.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $9,010.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $9,500.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -20.87%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 503-7002 (Portable Changeable Message Sign) is measured in EA. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 4,323 bids for it on 772 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 2,325 bids was $9,010.00 per EA, and the winning low bidders priced it at a weighted median of $6,500.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $9,500.00 per EA, so winning bids came in 31.6% below the estimate.
By calendar year, the median bid moved from $12,000.00 in 2025 (2,015 bids) to $9,458.00 in 2026 (2,130 bids), down 21.2%. The middle half of 2026 bids fell between $5,000.00 and $15,111.54.
Comparing the last 12 months with the 12 months before, the median unit price fell 20.87%.
Quantity matters for this item. Lines of 1 to 2 EA had a weighted median of $10,000.00, while lines above 5 EA had $10,000.00; the quantity discount is small for this item.
Across 640 lines where both a winning and a second-place bid were published, the median winning unit price was $8,989.55 against $9,885.67 from the second-lowest bidder, a median gap of 5.82% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($5,000.00) and Tyler the highest ($19,800.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $12,925.00 per EA for 2 EA against an estimate of $12,500.00.
300 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 503-7001 Portable Changeable Message Sign (weighted median $95.00 per DAY); 502-7001 Barricades, Signs AND Traffic Handling (weighted median $6,500.00 per MO); 505-7001 TMA (Stationary) (weighted median $236.87 per DAY); 505-7003 TMA (Mobile Operation) (weighted median $200.00 per DAY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 178 | 35 | $12,827.07 | $11,152.52 | $11,178.22 | $6,500.00 | $17,875.00 |
| 2025 | 2,015 | 376 | $13,123.74 | $12,000.00 | $12,000.00 | $6,500.00 | $20,000.00 |
| 2026 | 2,130 | 363 | $11,118.17 | $9,042.22 | $9,458.00 | $5,000.00 | $15,111.54 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–2 | 2,443 | $12,156.59 | $10,000.00 | $5,250.00–$18,000.00 |
| Medium | 3–4 | 1,200 | $11,874.76 | $10,000.00 | $5,000.00–$16,973.16 |
| Large | 5–50 | 680 | $12,212.66 | $10,000.00 | $5,174.56–$19,115.53 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $8,989.55
- Median second-low unit price
- $9,885.67
- Median engineer’s estimate
- $10,000.00
- Median gap, second vs. low
- +5.82%
640 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District
Line quantity 2 EA · Engineer’s estimate $12,500/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLCLOW BID | $12,925.00/EA | $25,850.00 | — | +3.4% | $734,629 | $59,414 (8.09%) left on table |
| 2 | Cross Plus Construction, LLC | $10,000.00/EA | $20,000.00 | -$5,850 | -20% | $794,043 | +$59,414 |
| 3 | Structural Integrity Group LLC | $5,000.00/EA | $10,000.00 | -$15,850 | -60% | $852,064 | +$117,434 |
| 4 | Pathfield Investments LLC | $150.00/EA | $300.00 | -$25,550 | -98.8% | $863,606 | +$128,977 |
| 5 | Scr Civil Construction, LLC | $10,775.00/EA | $21,550.00 | -$4,300 | -13.8% | $916,535 | +$181,906 |
| 6 | Icos Management, LLC | $5,000.00/EA | $10,000.00 | -$15,850 | -60% | $974,652 | +$240,023 |
| 7 | Road Doctors LLC | $150.00/EA | $300.00 | -$25,550 | -98.8% | $981,238 | +$246,609 |
- LOW BID · WINNER
- Unit price
- $12,925.00/EA
- Extension
- $25,850.00
- Proposal total
- $734,629
- Money left on the table
- $59,414 (8.09%)
- vs. engineer’s estimate
- +3.4%
- Unit price
- $10,000.00/EA
- Extension
- $20,000.00
- Proposal total
- $794,043
- vs. low bid
- +$59,414
- vs. engineer’s estimate
- -20%
- Unit price
- $5,000.00/EA
- Extension
- $10,000.00
- Proposal total
- $852,064
- vs. low bid
- +$117,434
- vs. engineer’s estimate
- -60%
- Unit price
- $150.00/EA
- Extension
- $300.00
- Proposal total
- $863,606
- vs. low bid
- +$128,977
- vs. engineer’s estimate
- -98.8%
- Unit price
- $10,775.00/EA
- Extension
- $21,550.00
- Proposal total
- $916,535
- vs. low bid
- +$181,906
- vs. engineer’s estimate
- -13.8%
- Unit price
- $5,000.00/EA
- Extension
- $10,000.00
- Proposal total
- $974,652
- vs. low bid
- +$240,023
- vs. engineer’s estimate
- -60%
- Unit price
- $150.00/EA
- Extension
- $300.00
- Proposal total
- $981,238
- vs. low bid
- +$246,609
- vs. engineer’s estimate
- -98.8%
Proposal 6504-77-001 · let Nov 12, 2026 · Dallas County, Dallas District
Line quantity 2 EA · Engineer’s estimate $20,000/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Garret Shields InfrastructureLOW BID | $1,000.00/EA | $2,000.00 | — | -95% | $237,780 | $84,371 (35.48%) left on table |
| 3 | 12twelve Road and Bridge LLC | $1,000.00/EA | $2,000.00 | $0.000 | -95% | $322,151 | +$84,371 |
| 4 | Gibson & Associates, Inc. | $2,500.00/EA | $5,000.00 | +$3,000 | -87.5% | $323,260 | +$85,480 |
| 5 | Icos Management, LLC | $2,100.00/EA | $4,200.00 | +$2,200 | -89.5% | $342,160 | +$104,380 |
| 6 | Road Doctors LLC | $150.00/EA | $300.00 | -$1,700 | -99.3% | $361,650 | +$123,870 |
1. Garret Shields Infrastructure
LOW BID · WINNER- Unit price
- $1,000.00/EA
- Extension
- $2,000.00
- Proposal total
- $237,780
- Money left on the table
- $84,371 (35.48%)
- vs. engineer’s estimate
- -95%
- Unit price
- $1,000.00/EA
- Extension
- $2,000.00
- Proposal total
- $322,151
- vs. low bid
- +$84,371
- vs. engineer’s estimate
- -95%
- Unit price
- $2,500.00/EA
- Extension
- $5,000.00
- Proposal total
- $323,260
- vs. low bid
- +$85,480
- vs. engineer’s estimate
- -87.5%
- Unit price
- $2,100.00/EA
- Extension
- $4,200.00
- Proposal total
- $342,160
- vs. low bid
- +$104,380
- vs. engineer’s estimate
- -89.5%
- Unit price
- $150.00/EA
- Extension
- $300.00
- Proposal total
- $361,650
- vs. low bid
- +$123,870
- vs. engineer’s estimate
- -99.3%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 6 EA · Engineer’s estimate $12,000/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $18,500.00/EA | $111,000.00 | — | +54.2% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $11,275.00/EA | $67,650.00 | -$43,350 | -6% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $4,750.00/EA | $28,500.00 | -$82,500 | -60.4% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $25,374.34/EA | $152,246.04 | +$41,246 | +111.5% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $18,402.50/EA | $110,415.00 | -$585.00 | +53.4% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $17,500.00/EA | $105,000.00 | -$6,000 | +45.8% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $18,500.00/EA
- Extension
- $111,000.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- +54.2%
2. Rpm Xconstruction, LLC
- Unit price
- $11,275.00/EA
- Extension
- $67,650.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -6%
- Unit price
- $4,750.00/EA
- Extension
- $28,500.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -60.4%
4. Webber, LLC
- Unit price
- $25,374.34/EA
- Extension
- $152,246.04
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- +111.5%
5. Sema Construction, Inc.
- Unit price
- $18,402.50/EA
- Extension
- $110,415.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- +53.4%
6. Zachry Construction Corporation
- Unit price
- $17,500.00/EA
- Extension
- $105,000.00
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- +45.8%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 2 | 7 | Ti-Zack Concrete, LLC | $12,925.00 | $12,500.00 |
| 2026-11-12 | 6504-77-001 | Dallas | Dallas | 2 | 5 | Garret Shields Infrastructure | $1,000.00 | $20,000.00 |
| 2026-11-04 | 0066-03-045 | Sherman | Amarillo | 2 | 1 | Breedon Investments USA Inc. | $5,000.00 | $10,000.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 6 | 6 | Indus Road & Bridge, Inc. | $18,500.00 | $12,000.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 3 | 12 | Fluor Enterprises, Inc. | $3,480.00 | $7,000.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 8 | 7 | Big Creek Construction, Ltd. | $11,500.00 | $7,000.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 6 | 9 | Highway 19 Construction LLC | $5,000.00 | $10,000.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 3 | 5 | J E Construction Services, LLC | $3,511.00 | $7,500.00 |
| 2026-11-03 | 0008-02-078 | Parker | Fort Worth | 2 | 8 | Jay Mills Contracting, Incorporated | $3,500.00 | $7,500.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 12 | 6 | Austin Bridge & Road Services, LP | $20,000.00 | $23,292.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 102 | $8,500.00 | $7,500.00 | $15,000.00 | -32.91% |
| Amarillo | 164 | $18,000.00 | $15,000.00 | $12,000.00 | -19.15% |
| Atlanta | 81 | $10,000.00 | $12,500.00 | $10,000.00 | -17.46% |
| Austin | 275 | $8,500.00 | $13,000.00 | $10,000.00 | -21.01% |
| Beaumont | 127 | $4,000.00 | $9,111.50 | $5,000.00 | +33.33% |
| Bryan | 258 | $7,500.00 | $9,300.00 | $7,000.00 | -13.29% |
| Childress | 27 | — | $15,000.00 | — | -27.27% |
| Corpus Christi | 121 | $5,471.00 | $7,104.03 | $8,000.00 | -51.58% |
| Dallas | 649 | $6,510.46 | $10,000.00 | $13,500.00 | -36.16% |
| El Paso | 50 | $12,000.00 | $12,000.00 | $9,000.00 | -16.91% |
| Fort Worth | 513 | $5,413.00 | $9,546.00 | $8,500.00 | -28.87% |
| Houston | 119 | $5,218.83 | $5,000.00 | $7,500.00 | +9.3% |
| Laredo | 149 | $6,915.00 | $8,500.00 | $10,000.00 | -26.32% |
| Lufkin | 157 | $4,500.00 | $9,700.00 | $10,000.00 | -41.18% |
| Odessa | 195 | $12,000.00 | $10,610.46 | $10,000.00 | -16.67% |
| Paris | 194 | $5,000.00 | $10,000.00 | $12,000.00 | -33.33% |
| Pharr | 161 | $7,798.50 | $7,767.19 | $6,500.00 | -13.2% |
| San Angelo | 12 | $15,400.00 | $15,000.00 | $15,000.00 | — |
| San Antonio | 266 | $5,855.00 | $8,600.00 | $7,500.00 | -8.21% |
| Tyler | 31 | $19,000.00 | $19,800.00 | $13,000.00 | — |
| Waco | 222 | $7,500.00 | $6,000.00 | $10,000.00 | -15.21% |
| Wichita Falls | 64 | $9,900.00 | $7,200.00 | $5,000.00 | -42.5% |
| Yoakum | 384 | $5,000.00 | $7,900.00 | $8,000.00 | -3.72% |
Related items
- 503-7001 · Portable Changeable Message Sign ($95.00/DAY)
- 502-7001 · Barricades, Signs AND Traffic Handling ($6,500.00/MO)
- 505-7001 · TMA (Stationary) ($236.87/DAY)
- 505-7003 · TMA (Mobile Operation) ($200.00/DAY)
- 505-7002 · TMA (Mobile Operation) ($80.00/HR)
- 500-7001 · Mobilization ($128,675.16/LS)
- 506-7041 · Temp Sedmt Cont Fence (Remove) ($1.00/LF)
- 506-7039 · Temp Sedmt Cont Fence (Install) ($3.94/LF)
Is your price for item 503-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.