Portable Changeable Message Sign (Item 503-7001): TxDOT Unit Price History
4,288 bids · 958 bid lines · Nov 6, 2024 to Nov 19, 2026 · unit of measure DAY
TxDOT 503-7001 · PORTABLE CHANGEABLE MESSAGE SIGN · Unit: DAY
- Low bid
- $77.00/DAY
- Quantity-weighted median of winning unit prices
- Weighted median
- $95.00/DAY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $100.00/DAY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -16.67%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 19, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 503-7001 (Portable Changeable Message Sign) is measured in DAY. Between Nov 6, 2024 and Nov 19, 2026, contractors entered 4,288 bids for it on 958 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 2,210 bids was $95.00 per DAY, and the winning low bidders priced it at a weighted median of $77.00 per DAY.
TxDOT's engineer's estimate for the same lines had a weighted median of $100.00 per DAY, so winning bids came in 23.0% below the estimate.
By calendar year, the median bid moved from $120.00 in 2025 (2,019 bids) to $100.00 in 2026 (2,072 bids), down 16.7%. The middle half of 2026 bids fell between $70.00 and $175.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 16.67%.
Quantity matters for this item. Lines of 1 to 37 DAY had a weighted median of $150.00, while lines above 116 DAY had $90.00, a 40% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 700 lines where both a winning and a second-place bid were published, the median winning unit price was $100.00 against $100.00 from the second-lowest bidder, a median gap of 0.19% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 24 TxDOT districts with at least ten bids, Pharr had the lowest weighted median ($50.00) and Laredo the highest ($1,500.00). The busiest district for this item was Houston.
The most recent letting with this item was on Nov 19, 2026 in Ector County, where Relmco, Inc. was the low bidder at $150.00 per DAY for 75 DAY against an estimate of $150.00.
581 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 503-7002 Portable Changeable Message Sign (weighted median $9,010.00 per EA); 502-7001 Barricades, Signs AND Traffic Handling (weighted median $6,500.00 per MO); 505-7001 TMA (Stationary) (weighted median $236.87 per DAY); 505-7003 TMA (Mobile Operation) (weighted median $200.00 per DAY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 197 | 46 | $104.02 | $100.00 | $125.00 | $75.00 | $202.00 |
| 2025 | 2,019 | 462 | $119.87 | $100.00 | $120.00 | $75.00 | $200.00 |
| 2026 | 2,072 | 452 | $112.51 | $98.21 | $100.00 | $70.00 | $175.00 |
Quantity bands
| Band | Quantity (DAY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–37 | 1,445 | $231.01 | $150.00 | $100.00–$260.00 |
| Medium | 38–115 | 1,418 | $149.06 | $100.00 | $72.99–$170.00 |
| Large | 116–2,308 | 1,425 | $103.06 | $90.00 | $60.00–$140.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $100.00
- Median second-low unit price
- $100.00
- Median engineer’s estimate
- $120.00
- Median gap, second vs. low
- +0.19%
700 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6510-75-001 · let Nov 19, 2026 · Ector County, Odessa District
Line quantity 75 DAY · Engineer’s estimate $150.00/DAY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Relmco, Inc.LOW BID | $150.00/DAY | $11,250.00 | — | 0% | $669,750 | $33,975 (5.07%) left on table |
| 2 | Scr Civil Construction, LLC | $55.00/DAY | $4,125.00 | -$7,125 | -63.3% | $703,725 | +$33,975 |
| 4 | Scott Tucker Construction Company, LLC | $130.00/DAY | $9,750.00 | -$1,500 | -13.3% | $912,950 | +$243,200 |
1. Relmco, Inc.
LOW BID · WINNER- Unit price
- $150.00/DAY
- Extension
- $11,250.00
- Proposal total
- $669,750
- Money left on the table
- $33,975 (5.07%)
- vs. engineer’s estimate
- 0%
- Unit price
- $55.00/DAY
- Extension
- $4,125.00
- Proposal total
- $703,725
- vs. low bid
- +$33,975
- vs. engineer’s estimate
- -63.3%
- Unit price
- $130.00/DAY
- Extension
- $9,750.00
- Proposal total
- $912,950
- vs. low bid
- +$243,200
- vs. engineer’s estimate
- -13.3%
Proposal 6497-55-001 · let Nov 12, 2026 · Denton County, Dallas District
Line quantity 67 DAY · Engineer’s estimate $100.00/DAY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Road Doctors LLCLOW BID | $150.00/DAY | $10,050.00 | — | +50% | $493,320 | $25,748 (5.22%) left on table |
| 2 | Icos Management, LLC | $189.00/DAY | $12,663.00 | +$2,613 | +89% | $519,068 | +$25,748 |
| 6 | Jr West Texas Concrete LLC | $250.00/DAY | $16,750.00 | +$6,700 | +150% | $746,209 | +$252,889 |
- LOW BID · WINNER
- Unit price
- $150.00/DAY
- Extension
- $10,050.00
- Proposal total
- $493,320
- Money left on the table
- $25,748 (5.22%)
- vs. engineer’s estimate
- +50%
- Unit price
- $189.00/DAY
- Extension
- $12,663.00
- Proposal total
- $519,068
- vs. low bid
- +$25,748
- vs. engineer’s estimate
- +89%
6. Jr West Texas Concrete LLC
- Unit price
- $250.00/DAY
- Extension
- $16,750.00
- Proposal total
- $746,209
- vs. low bid
- +$252,889
- vs. engineer’s estimate
- +150%
Proposal 6504-57-001 · let Nov 12, 2026 · Dallas County, Dallas District
Line quantity 10 DAY · Engineer’s estimate $150.00/DAY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway Intelligent Traffic Solutions, LLCLOW BID | $33.13/DAY | $331.30 | — | -77.9% | $792,536 | $105,738 (13.34%) left on table |
| 2 | Elecnor Belco Electric, Inc. | $278.00/DAY | $2,780.00 | +$2,449 | +85.3% | $898,274 | +$105,738 |
| 3 | American Lighting and Signalization, LLC | $45.00/DAY | $450.00 | +$118.70 | -70% | $900,000 | +$107,464 |
| 4 | Road Solutions L.L.C. | $80.00/DAY | $800.00 | +$468.70 | -46.7% | $940,478 | +$147,942 |
| 5 | Yunex LLC | $227.00/DAY | $2,270.00 | +$1,939 | +51.3% | $1,358,810 | +$566,274 |
1. Highway Intelligent Traffic Solutions, LLC
LOW BID · WINNER- Unit price
- $33.13/DAY
- Extension
- $331.30
- Proposal total
- $792,536
- Money left on the table
- $105,738 (13.34%)
- vs. engineer’s estimate
- -77.9%
- Unit price
- $278.00/DAY
- Extension
- $2,780.00
- Proposal total
- $898,274
- vs. low bid
- +$105,738
- vs. engineer’s estimate
- +85.3%
- Unit price
- $45.00/DAY
- Extension
- $450.00
- Proposal total
- $900,000
- vs. low bid
- +$107,464
- vs. engineer’s estimate
- -70%
4. Road Solutions L.L.C.
- Unit price
- $80.00/DAY
- Extension
- $800.00
- Proposal total
- $940,478
- vs. low bid
- +$147,942
- vs. engineer’s estimate
- -46.7%
5. Yunex LLC
- Unit price
- $227.00/DAY
- Extension
- $2,270.00
- Proposal total
- $1,358,810
- vs. low bid
- +$566,274
- vs. engineer’s estimate
- +51.3%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-19 | 6510-75-001 | Ector | Odessa | 75 | 3 | Relmco, Inc. | $150.00 | $150.00 |
| 2026-11-12 | 6497-55-001 | Denton | Dallas | 67 | 3 | Road Doctors LLC | $150.00 | $100.00 |
| 2026-11-12 | 6504-57-001 | Dallas | Dallas | 10 | 5 | Highway Intelligent Traffic Solutions, LLC | $33.13 | $150.00 |
| 2026-11-10 | 6506-72-001 | Harris | Houston | 50 | 3 | Professional Traffic Control LLC | $25.00 | $112.28 |
| 2026-11-10 | 6496-11-001 | Ector | Odessa | 40 | 3 | Scr Civil Construction, LLC | $80.00 | $400.00 |
| 2026-11-05 | 6510-79-001 | Lamb | Lubbock | 10 | 3 | Fc Traffic Control, LLC | $10.00 | $200.00 |
| 2026-11-04 | 0009-06-056 | Hunt | Paris | 35 | 2 | Cdm Holdings | $100.00 | $500.00 |
| 2026-11-04 | 0016-03-125 | Hays | Austin | 300 | 6 | Bobcat Services, Inc. | $86.65 | $83.08 |
| 2026-11-04 | 0052-04-054 | Lamb | Lubbock | 256 | 2 | Lipham Asphalt and Paving Company, LLC | $100.00 | $50.00 |
| 2026-11-04 | 0074-06-256 | Nueces | Corpus Christi | 171 | 4 | Relmco, Inc. | $150.00 | $100.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 11 | $65.00 | $131.00 | $150.00 | — |
| Amarillo | 12 | $500.00 | $500.00 | $500.00 | — |
| Atlanta | 97 | $100.00 | $126.32 | $155.00 | +12% |
| Austin | 400 | $81.00 | $87.35 | $100.00 | -23.2% |
| Beaumont | 167 | $100.00 | $100.00 | $100.00 | -33.33% |
| Brownwood | 67 | $50.00 | $100.00 | $100.00 | +17.92% |
| Bryan | 197 | $100.00 | $75.00 | $100.00 | -13.04% |
| Childress | 11 | $250.00 | $200.00 | $100.00 | — |
| Corpus Christi | 243 | $56.00 | $65.75 | $100.00 | -14.61% |
| Dallas | 551 | $120.00 | $100.00 | $130.00 | -27.21% |
| El Paso | 126 | $145.00 | $150.00 | $155.00 | +20.78% |
| Fort Worth | 233 | $56.03 | $90.00 | $100.00 | -4.76% |
| Houston | 664 | $100.00 | $100.00 | $150.00 | -6.67% |
| Laredo | 13 | $2,500.00 | $1,500.00 | $5,000.00 | — |
| Lubbock | 161 | $58.00 | $75.00 | $100.00 | -6.98% |
| Lufkin | 24 | $50.00 | $100.00 | $100.00 | 0% |
| Odessa | 96 | $100.00 | $100.00 | $250.00 | 0% |
| Paris | 155 | $66.00 | $100.00 | $110.00 | -33.33% |
| Pharr | 29 | $147.36 | $50.00 | $80.00 | -33.86% |
| San Angelo | 108 | $35.00 | $100.00 | $100.00 | -20% |
| San Antonio | 269 | $65.00 | $75.00 | $90.00 | -18.81% |
| Tyler | 361 | $100.00 | $100.00 | $110.00 | -7.41% |
| Waco | 216 | $105.00 | $125.00 | $90.00 | +18.18% |
| Wichita Falls | 62 | $250.00 | $195.00 | $100.00 | +1.48% |
Related items
- 503-7002 · Portable Changeable Message Sign ($9,010.00/EA)
- 502-7001 · Barricades, Signs AND Traffic Handling ($6,500.00/MO)
- 505-7001 · TMA (Stationary) ($236.87/DAY)
- 505-7003 · TMA (Mobile Operation) ($200.00/DAY)
- 505-7002 · TMA (Mobile Operation) ($80.00/HR)
- 500-7001 · Mobilization ($128,675.16/LS)
- 506-7041 · Temp Sedmt Cont Fence (Remove) ($1.00/LF)
- 506-7039 · Temp Sedmt Cont Fence (Install) ($3.94/LF)
Is your price for item 503-7001 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.