Professional Traffic Control LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: PROFESSIONAL TRAFFIC CONTROL LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 10, 2026, retrieved Nov 24, 2026.

Proposals bid
68
Low bids (rank 1)
16
Win rate
23.53%
Low-bid value
$16M
Money left on table
$6.8M
Avg. bid vs. estimate
-0.15%

From Nov 6, 2024 to Nov 10, 2026, Professional Traffic Control LLC submitted 68 bids on TxDOT proposals and was the apparent low bidder on 16 of them (23.53%), with low bids totalling $16,041,840. In 16 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $6,795,910 (42.36% of those bids); the median gap was 11.28%. On average its bids came in 0.15% below TxDOT's engineer's estimate. Its most frequent district was Houston (30 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20244250.0%$3,914,967
202530620.0%$5,254,480
202634823.5%$6,872,392

Head-to-head rivals

BidderProposals togetherRanked ahead
Trp Infrastructure Services, LLC218 of 21
Stripe Lines, Inc.158 of 15
Sweeping Corporation of America, LLC144 of 14
Garret Shields Infrastructure139 of 13
Batterson, Llp119 of 11
Stripe-A-Zone, LLC100 of 10
Rhino Equity, LLC70 of 7
Elite Kings Construction, LLC61 of 6

Districts and work types

DistrictBids
Houston30
Dallas8
Austin5
Fort Worth5
Bryan4
Work type of low bidsLow bids
Routine Maintenance Project - Sealed10
Traffic Control Devices4
Routine Maintenance Project1
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-01-066492-15-001Ellis3lw Civil LLC$1,160,563$1,169,000+0.7%
2026-02-050912-73-235GalvestonCastillo Aranda LLC$736,599$743,362+0.9%
2025-12-030265-14-018FayetteLarry Young Paving, Inc.$4,027,355$4,077,955+1.3%
2026-03-050917-29-149BrazosLarry Young Paving, Inc.$421,790$434,520+3%
2026-01-070271-16-169HarrisElite Kings Construction, LLC$2,017,346$2,178,997+8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-106506-72-001HarrisRoutine Maintenance Project - Sealed1 of 3$765,790—+31.8%
2026-11-046509-27-001HarrisRoutine Maintenance Project - Sealed2 of 2$5,156,687+22.7%+41.8%
2026-11-036509-25-001HarrisRoutine Maintenance Project - Sealed2 of 2$5,404,854+20.2%+42%
2026-03-106493-77-001HarrisRoutine Maintenance Project - Sealed4 of 7$820,100+4.2%-8.1%
2026-03-050917-29-149BrazosTraffic Control Devices2 of 9$434,520+3%+17.9%
2026-03-040195-05-013CookePedestrian, Sidewalks & Curb Ramps6 of 12$2,518,587+14.8%-11.2%
2026-03-040500-03-658HarrisTraffic Control Devices1 of 4$1,953,428—+33.1%
2026-03-040912-00-766HarrisTraffic Control Devices8 of 12$3,347,861+22.8%-9.4%
2026-03-046497-77-001NuecesRoutine Maintenance Project - Sealed2 of 2$4,111,384+73.5%+46.6%
2026-02-116466-51-001CollinRoutine Maintenance Project - Sealed1 of 4$278,461—-16.6%
2026-02-116484-29-001TravisRoutine Maintenance Project - Sealed2 of 2$821,251+14.5%-17.2%
2026-02-116488-34-001DentonRoutine Maintenance Project - Sealed1 of 5$550,050—-18.9%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.