Elite Kings Construction, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: ELITE KINGS CONSTRUCTION, LLC · Data as published by TxDOT, lettings Feb 4, 2025 to Mar 5, 2026, retrieved Nov 24, 2026.

Proposals bid
37
Low bids (rank 1)
10
Win rate
27.03%
Low-bid value
$22M
Money left on table
$1.1M
Avg. bid vs. estimate
+9.99%

From Feb 4, 2025 to Mar 5, 2026, Elite Kings Construction, LLC submitted 37 bids on TxDOT proposals and was the apparent low bidder on 10 of them (27.03%), with low bids totalling $21,977,176. In 10 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,141,227 (5.19% of those bids); the median gap was 4.32%. On average its bids came in 9.99% above TxDOT's engineer's estimate. Its most frequent district was Houston (20 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202524520.8%$4,738,646
202613538.5%$17,238,530

Head-to-head rivals

BidderProposals togetherRanked ahead
Texas Materials Group, Inc.1715 of 17
Cornerstone Paving and Construction, L.L.C.158 of 15
Durwood Greene Construction Co.127 of 12
Rhino Equity, LLC73 of 7
Environmental Allies, Inc.64 of 6
Forde Construction Company, Inc.65 of 6
Professional Traffic Control LLC65 of 6
Vulcan Materials Asphalt and Construction, LLC65 of 6

Districts and work types

DistrictBids
Houston20
Beaumont7
Bryan5
Austin1
Corpus Christi1
Work type of low bidsLow bids
Routine Maintenance Project - Sealed4
Overlay3
Material Maintenance Project - Sealed1
Restoration1
Traffic Control Devices1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-03-056376-75-001BrazoriaEnvironmental Allies, Inc.$1,892,569$1,898,948+0.3%
2025-02-073223-01-010Fort BendDurwood Greene Construction Co.$585,949$589,897+0.7%
2026-02-050338-12-011LibertyCornerstone Paving and Construction, L.L.C.$2,780,143$2,800,263+0.7%
2026-02-050976-01-047HarrisEnvironmental Allies, Inc.$4,112,543$4,180,781+1.7%
2025-05-026483-01-001WalkerCornerstone Paving and Construction, L.L.C.$1,349,975$1,388,150+2.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-03-056482-30-001HarrisRoutine Maintenance Project - Sealed1 of 2$5,003,000—-1.5%
2026-03-056491-05-001RobertsonRoutine Maintenance Project - Sealed7 of 7$4,341,290+86.4%+95.4%
2026-03-040020-07-032PresidioRestoration1 of 3$4,176,256—-13.1%
2026-03-040912-00-766HarrisTraffic Control Devices1 of 12$2,725,853—-26.3%
2026-03-040978-02-084GalvestonOverlay1 of 7$3,316,075—-14.9%
2026-02-106492-82-001Fort BendRoutine Maintenance Project - Sealed7 of 8$456,900+128%+37.1%
2026-02-050338-12-011LibertyRestoration2 of 5$2,800,263+0.7%-18.3%
2026-02-050976-01-047HarrisOverlay2 of 5$4,180,781+1.7%+10.4%
2026-02-056488-21-001JeffersonRoutine Maintenance Project5 of 5$2,884,334+151.3%+103.6%
2026-02-043047-02-012WallerOverlay5 of 7$3,945,462+20.5%-10.8%
2026-01-070177-03-109LibertyOverlay2 of 4$1,004,842+16.9%-7.8%
2026-01-070271-16-169HarrisOverlay1 of 4$2,017,346—-16.2%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.