Durwood Greene Construction Co.: TxDOT Bid Results and Margins
Name as published by TxDOT: DURWOOD GREENE CONSTRUCTION CO. · Data as published by TxDOT, lettings Dec 3, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
59
Low bids (rank 1)
20
Win rate
33.9%
Low-bid value
$101.1M
Money left on table
$6.4M
Avg. bid vs. estimate
+3.54%
From Dec 3, 2024 to Nov 4, 2026, Durwood Greene Construction Co. submitted 59 bids on TxDOT proposals and was the apparent low bidder on 20 of them (33.9%), with low bids totalling $101,082,539. In 20 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $6,410,420 (6.34% of those bids); the median gap was 4.4%. On average its bids came in 3.54% above TxDOT's engineer's estimate. Its most frequent district was Houston (41 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.